Loading...
Review Comments - BLD20150670.pdf CITY OF EDMONDS PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov DATE:June 17, 2015 TO:Aija Christopher 17512 Talbot Rd Edmonds, WA 98020 FROM:Jennifer Lambert, Engineering Technician Jennifer.lambert@edmondswa.gov RE:Application #: BLD2015-0670 Project: Deck Addition Project Address: 17512 Talbot Rd During review of the above noted application, it was found that the following information, corrections,or clarifications are needed. Reviews by other divisions, such as Planning, Building, or Fire may result in additional comments. Please redlineplans or submit three (3) sets of revised plans/documents with a written response to each of the items below to a permit coordinator. nd floor of City Hall. Resubmittals can be made at the Development Services Department on the 2 Permit Center hours areM, T, Th & F from 8am-4:30pm. The Permit Center is closed on Wednesdays. City of Edmonds handouts, standard details and development code can be referenced on the City website. 1)Please show all impervious surface areas on theplans (i.e. concrete, asphalt, patios, gravel areas, etc.). 2)Please note the year of construction for all impervious surface areaon the Site Plan. If 2000sf of impervious surface area is added to the site after 1977 a stormwater management system is required. 3)Please show the roof line on the plans. 4)If the existing deck was pervious and is being modified to an impervious surface area, the deck will be considered new impervious surface area. a.If the deck is considered a new impervious surface area, the area under the existing roof line is not considered new (since the roof isexisting). Therefore clearly show the roof lines and the portions of the deck that is not under the roof. b.Please update the impervious surface calculations accordingly (#5 below). 5)Please provide the impervious surface calculations as shown on the plans in the table format provided below. IMPERVIOUS SURFACE CHART LineTypeArea (square feet) 1.Non-Regulated ExemptRegulated 2.Replaced 3.New (Post 1977)+ Total Regulated Impervious Area 4.= Mitigation required if in excess of 2000sf - 5.Total Area Mitigated by Existing Stormwater Management System(s) 6.Regulated Area Not Yet Mitigated= 7.Area Proposed to be Mitigated by Low Impact Development Techniques= 8.Area Proposed to be Mitigated through Conventional SWM Techniques= 6)The stormwater runoff from the proposed deck is proposed to discharge to the existing storm system. a.Please show where the existing system is located. b.Please provide information about theexisting system and show that the existing system can handle the additional surface waterrunoff. c.The new impervious area may discharge to a new stormwater management system(i.e. splashblocks, drywell, etc).If you choose to install a new system, please show/statethe new system on theplans. d.Due to the steep slopesaGeotechnical Report is required that addressesthe discharge of the surface water runofffrom the new impervioussurface area.This report will be required regardless if theexisting stormwater system is used or a new systemis installed. 7)Show the location of existing utilities on the siteplan (water, sewer and storm). Show the City Sewer Main and easement on the plans. The deckor stormwater management 8) system cannot be installed within the easement. Page 2of 2