revised TIA.pdfAPPENDIX A
Page 1 of 2
Transportation Impact Analysis
Worksheet
'C. lb
PERMITTING & DEVELOPMENT
ENGINEERING
DIVISION
121 5th Avenue N
P: 425.771.0220
www.edmondswa.gov
Name of Proposed Project: 244th St.
Owner/Applicant
Mietzner Brothers Properties, LLC
Name
11611 Airport Rd., Suite B-1
Street/Mailing Address
Everett WA 98204
City
Applicant Contact Person:
Brian Kalab, P.E. / Insight Engineering Co.
Name
PO Box 1478
Street/Mailing Address
Everett WA 98206
State Zip City
Telephone: (425) 212-2490 Telephone: (425) 303-9363
State Zip
Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): �EIVF�
Firm Name Contact Name AUG (31 0 20 V3'
Telephone: E-mail: D""Ll 0PN1EW�FI_.CC�;
1. PROJECT DESCRIPTION
a. Location - Street address: 8605, 8611, & 8615 244th St. SW, Edmonds, WA 98026
a vicinity map and site plan.)
b. Specify existing land use: 3 single family homes
c. Specify proposed type and size of development: 11 detached single family homes
(# of residential units and/or square footage of building)
d. Date construction will begin and be completed: July 2018
e. Define proposed access locations: See civil plans
APPENDIX A
Page 2 of 2
f. Define proposed sight distance at site egress locations: See civil
2. MITIGATION RECOMMENDATIONS
State recommended measures and fees required to mitigate project specific traffic impacts.
Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified
in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC
18.82.130.
❑ CHANGE IN USE
Fee for prior use shall be based on fee established at the time the prior use was permitted. If
the previous use was permitted prior to the adoption of Ordinance 3516 (effective date:
09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used.
ITE Land Use Category I Per Unit
Fee Rate
New Use SFR
Prior Use I SFR
2018 - 4,561.3
$ 2019 - 6,249.1
1
X
X
$ 840.72
Units in
square feet,
# of dwelling,
vfp, etc.
11
3
Fee
2018
2019
$68,740.54
$2,522.16
New Use Fee: $ - Prior Use Fee: $ _ $ 47,652.91 1$66,218.38
2018 FEE 2019 FEE
❑ NEW DEVELOPMENT
Units in
ITE Land Use Category Per Unit square feet,
Fee Rate # of dwelling,
vfp, etc.
New Use $ X
❑ OTHER
INDEPENDENT FEE CALCULATION: $240.00 (+
TOTAL TRANSPORTATION IMPACT FEE 1 $
City of Edmonds, Engineering Division Approval Date
' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.