Loading...
revised TIA.pdfAPPENDIX A Page 1 of 2 Transportation Impact Analysis Worksheet 'C. lb PERMITTING & DEVELOPMENT ENGINEERING DIVISION 121 5th Avenue N P: 425.771.0220 www.edmondswa.gov Name of Proposed Project: 244th St. Owner/Applicant Mietzner Brothers Properties, LLC Name 11611 Airport Rd., Suite B-1 Street/Mailing Address Everett WA 98204 City Applicant Contact Person: Brian Kalab, P.E. / Insight Engineering Co. Name PO Box 1478 Street/Mailing Address Everett WA 98206 State Zip City Telephone: (425) 212-2490 Telephone: (425) 303-9363 State Zip Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): �EIVF� Firm Name Contact Name AUG (31 0 20 V3' Telephone: E-mail: D""Ll 0PN1EW�FI_.CC�; 1. PROJECT DESCRIPTION a. Location - Street address: 8605, 8611, & 8615 244th St. SW, Edmonds, WA 98026 a vicinity map and site plan.) b. Specify existing land use: 3 single family homes c. Specify proposed type and size of development: 11 detached single family homes (# of residential units and/or square footage of building) d. Date construction will begin and be completed: July 2018 e. Define proposed access locations: See civil plans APPENDIX A Page 2 of 2 f. Define proposed sight distance at site egress locations: See civil 2. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. ❑ CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used. ITE Land Use Category I Per Unit Fee Rate New Use SFR Prior Use I SFR 2018 - 4,561.3 $ 2019 - 6,249.1 1 X X $ 840.72 Units in square feet, # of dwelling, vfp, etc. 11 3 Fee 2018 2019 $68,740.54 $2,522.16 New Use Fee: $ - Prior Use Fee: $ _ $ 47,652.91 1$66,218.38 2018 FEE 2019 FEE ❑ NEW DEVELOPMENT Units in ITE Land Use Category Per Unit square feet, Fee Rate # of dwelling, vfp, etc. New Use $ X ❑ OTHER INDEPENDENT FEE CALCULATION: $240.00 (+ TOTAL TRANSPORTATION IMPACT FEE 1 $ City of Edmonds, Engineering Division Approval Date ' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.