Loading...
Revision 5 - Building Comments 1.pdfCity of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: March 6, 2018 TO: Aidan Bird Studio Meng Strazzara abird(a-,studioms.com FROM: Chuck Miller, Plans Examiner chuck.miller(2edmonmdswa. gov RE: Plan Check: BLD2015-0846 — REVISION 5 Project Address: 50 Pine Street Project: Point Edwards Building 10 Scope: Construct 68 unit residential structure — R-2/S-2 occupancy groups - VA construction — NFPA 13 sprinkler system required — mechanical, plumbing, fire sprinkler, fire alarm, etc. under separate permits Please be advised that the building plans for the above referenced project have been disapproved for the purposes of obtaining a building permit. During a review of the plans by the Building Division for compliance with the applicable building codes, it was found that the following information, clarifications, or changes are needed. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments that require attention beyond the scope of this letter. A complete review cannot be performed until the revised plans/documents, including a written response in itemized letter format indicating where the `clouded' or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Only those sheets specifically referenced as follows need to be resubmitted. Resubmittals must be made at the Development Services Department on the 2nd Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays. On revised sheet A108 — Level 1 Plan: West: Level 1 Plan — West - Clarify on the plans the represented location of door 'SDI 00'. It does not appear to provide the smoke and draft control per IBC 716.5.3.1 at the hoistway openings into the elevator lobby required to be constructed as a corridor to maintain the corridor continuity per IBC 1018.6. The placement of doors similar to that proposed on `Level 4' and `Level 5' would allow door `SD100' to be eliminated from the currently proposed location. Update the `Door Schedule' on sheet `A601' as required. On revised sheet A110 — Level 2 Plan: West: 2. Level 2 Plan — West - Clarify on the plans the represented locations of door `SD200' and door `SD201'. It does not appear to provide the smoke and draft control per IBC 716.5.3.1 at the hoistway openings into the elevator lobby required to be constructed as a corridor to maintain the corridor continuity per IBC 1018.6. The placement of doors similar to that proposed on `Level 4' and `Level 5' would allow door `SD200' and door `SD201' to be eliminated from the currently proposed locations. On revised sheet A112 — Level 3 Plan: West: 3. Level 3 Plan — West - Clarify on the plans the represented locations of door `SD300' and door `SD301'. It does not appear to provide the smoke and draft control per IBC 716.5.3.1 at the hoistway openings into the elevator lobby required to be constructed as a corridor to maintain the corridor continuity per IBC 1018.6. The placement of doors similar to that proposed on `Level 4' and `Level 5' would allow door `SD300' and door `SD301' to be eliminated from the currently proposed locations. Page 2 of 2