Loading...
Rice Group Response 6-20-07.pdfRICE Group, Inc. Consulting Engineers 19015 36th Ave. W. Suite A Lynnwood, WA 98036 (425) 7743829 (425) 672-2084 FAX _ - RICE Group, Inc. June 20, 2007 City Of Edmonds Building Official Project: Edmonds Family Medicine Subject: Request for l % slope of portion of waste. Attn: Theresa Urnbaugh This is a formal request for permission to design a 1 % slope into an existing facility. The plumbing contractor has performed a `camera scope' of the existing waste lines to determine the invert elevations. Due to the expansion of this facility happening to the north and all of the sanitary sewer going north to south, there is one line (approximately 55 feet in length) that it is necessary to route at 1% slope. We believe that all necessary action has been performed to show that this 1% slope is required to drain some of our plumbing fixtures. I have attached two sketches showing the 1 % line and locations on the existing waste line that the contractor verified. Thank you again for your time and please contact me if you have any questions. Sincerely, Randy inton, P.E. RICE Group, Ine.