Loading...
richmar city letter.pdfSeptember 10, 2010 City of Edmonds Attn: Mr. Leif Bjorback, Asst Building Official 121 5th Avenue North Edmonds, WA 98020 Via email: bjorback@ci.edmonds.wa.us RE: Richmar Condominiums — Completion of Roof Replacement Work Property Aotclress: 524 Maple St., Edmonds, WA 98020 Dear Mr. Bjorback, J2 Building Consultants Inc., provided the roof replacement design and QA/QC field inspections during the recent roofing repair work at the Richmar Condominiums. The roof replacement included removal of the existing torch -applied membrane, parapet wall flashing, chimney caps, collector boxes and downspouts. A new Carlisle single -ply TPO membrane has been mechanically installed and sloped to built-in drains. New coping metal, chimney cops, larger collector boxes with overflows, and new downspouts have also been installed. We are submitting this letter to you documentation that the roof membrane and all associated components have been installed in compliance with the manufacturer's specifications, the architectural details, and to industry standards. The installation is eligible to receive a 20 year no dollar limit warranty. Please feel free to contact me with any questions. Sincerely, J2 BUILDING CONSULTANTS, INC. Ken Britton, Project Manager KB: mon Cc: Ms. Penne Richman, Richmar Condominiums Roofcorp. Inc f211111 11111 BUILDING CONSULTANTS, INC. ALDERWO+OD CENTER +ENTER 3400 188th St SW Suite 302 Lynnwood, WA 98037 Tel (425) 774-5600 Fax (425) 774-5661 Forensic Building Investigation Construction Management Building Envelope Design & Inspection www.j2Consultants.com