Loading...
Ritter Civil Review - Comments 3.pdf CITY OF EDMONDS CIVIL PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov DATE:September 21, 2017 TO:Joseph Smeby, Omega Engineering joe@omega-eng.com FROM:Jeanie McConnell, Engineering Program Manager jeanie.mcconnell@edmondswa.gov Jen Machuga, Associate Planner Jen.machuga@edmondwa.gov RE:Subdivision File #: PLN20120021 Project: Ritter 3-lot short plat Project Address: 8364 Olympic View Drive During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit three (3) sets of revised plans/documents with a written response to each of the items below to a permit coordinator. nd Resubmittals can be made at the Development Services Department on the 2floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon. City of Edmonds handouts, standard details and development code can be referenced on the City website. Comments 1 –February 7, 2017 Comments 2 –July 13, 2017 REVISED –July 30, 2017 (cost estimate comments added) Comments 3 –September 21, 2017 Reference to all comments from previous plan review comment lettersthat have been addressed have been removed from this comment letter. Only those comments listed below remain for the project. 1.Thegeotechnicalletter provided from Julian Liu, Liu & Associates, dated August 16, 2017 does not sufficiently address what was requested in staff’s previous comments.Please provide Mr. Liu with the entire civil plan set and the native vegetation plan and ask him to write a letter confirming that he reviewed the civil plans and native vegetation plan for compliance with all applicable critical areas requirements of ECDC Chapters 23.40 and 23.80.In addition to addressing any other applicable critical areas code sections, Mr. Liu should specifically address the plans’ compliance with Sections 23.80.060 and 23.80.070. 2.Please address the following related to the Vegetation Management Plan (VMP): a)Implementation of the VMP cannot be deferred.Thus, the work detailed in the VMP will need to be conducted prior to final approval and recording of the short plat.As part of the implementation of the VMP, documentation from Wetland Resources, Inc. will be necessary in order to confirm that the plan was fully implemented and to document what plants were installed within the areas where the invasive species are removed.Please add a note to theplansreflecting this requirement. b)The third paragraph under the “Project Description” heading states that all trees on Lots A and B that are outside the nativevegetation area will be removed for construction of the future homes.It is clear that amajority of thesetrees on Lot A will need to be removed for the civil improvements and construction of a future home on Lot A; however, it is possible that some of these trees on Lot B can be retained with future development.Please note that tree removal outside the native vegetation areas is not being reviewed nor approved at this time. c)Revise the second paragraph under the “Work Schedule” heading since the work within the vegetation management area is to be conducted prior to final short plat approval (as discussed above). d)Under the “Maintenance” heading, please provide additional direction for what will need to be done for monitoring of the native vegetation area including performance standards. e)Under the “Use of This Plan” heading, remove the second paragraph since the subject site does not contain a wetland. f)Please revise the cost estimate to include the cost of removal of the invasives and the grass seedingspecified in the VMP. Page 2of 2