Loading...
RPBA test report.pdfNEW INSTALL% EXIS'T'ING REPLACEMENT i 1 REMOVED OI.D SER.# APPROVED ASSEMBLY? YES V NO PROPER INSTALLATION? YES V NO MAKE OE ASSEMBLY BMODEL-LO—SERIAL NO. _SIZE AIR GAP INSPECTION: SUPPLY PIPE DIAMETER SEPARATION PASS: FAIL DETECTOR METER READING LEFT SERVICE AS FOUND Isolation valve: Open Closed SOV#1 Open Closed SOV#2: Open Closed REMARKS: 15 TESTERS SIGNATURE: - LINE PRESSURE _� PSI CONFINED PCE? No CERT. NO, B5046 DATE I certify that this report is accurate, and I have used WAC 246-290490 approved test methods and test equipment. DCVA / RPBA DCVA / RPBA RPBA PVBA I SVBA INITIAL, CHECK VALVE NO.1 CHECK VALVE NO.2 AIR INLET' TEST OPENED AT_ _PSID CLOSED TIGHT CLOSED TIGHT,,X OPENED AT � PSID PASSED #.1 CHECK ' SID LEAKED LEADED _ _. FAILED AIR GAP OK? DID NOT OPEN PSID PSID CLEAN REPLACE PART CLEAN REPLACE PART CLEAN REPLACE PART CHECK VALVE NEW HELD AT.. ._ PSID PARTS LEAKED AND CLEANED REPAIRS REPAIRED TEST AFTER CLOSED TIGHT - CLOSED TIGHT RV EXERCISED AIR INLET PSID REPAIRS LEAKED LEAKED OPENED AT , � PSID �.-�-�---w PASSED �I � FAILED '::....1 PSID PSID #I CITE CK �!, J_PSID CHK VALVE ��. PSID AIR GAP INSPECTION: SUPPLY PIPE DIAMETER SEPARATION PASS: FAIL DETECTOR METER READING LEFT SERVICE AS FOUND Isolation valve: Open Closed SOV#1 Open Closed SOV#2: Open Closed REMARKS: 15 TESTERS SIGNATURE: - LINE PRESSURE _� PSI CONFINED PCE? No CERT. NO, B5046 DATE I certify that this report is accurate, and I have used WAC 246-290490 approved test methods and test equipment.