RR Ltr.pdfFrom : The StaSny RrchitectS
5 ,illy 2007
Mr [lave C Dougherty;
PO2
ro ho"j,rt+r i�OC1d8n1Q Hv9 5`
oAlt+neai pivibioa . .� .n1 06 —T.
�rNd6sr I�I�In4ss� ell
u k. n bn ZM
I have reviewed the drainage pians for "929 Gary Rd 1 Strickland
Residence''.
JULs I
DEVELOPMENT SERVICES c i
CITY OF EDMONDS
BNSF will not oppose your plans to exclude a water retention feature
from the project. This is due to the foiiowino cotigidetatioos:
1, This will be a very minor change to the amount of water exciting
through BNSF property.
2. Water draining off the Strickland property will flow well ahead of
the peak flow from the basin
The pians are acceptable to BNSF Railway.
DISCLAIMER:
BNBF heA reviewed theao plans And no exaepllons asra: Man with regard to M81"S atbflkiyto use the project as
intended, ONSP hee not reviewed the design details at oalauletlons for slraelural lntegrltp or englneartng
encureq. ®NSF accqipta no reeperl11a111ty far ermrs Or omlenlano In the daal-In of the prajeat.
Rusty Olson