Loading...
Seavue Unit 300 Deck construction ltr 21JUN17.pdf Date: June 22, 2017 From: Jay Grant President To: City of Edmonds Development Services, Building Division CC:Beverly Ross Boyce Re:Approval of Construction Request The request to bring the unitÈs deck into compliance has been reviewed. The City of Edmonds Code requires a permit for deck work of this nature. This letter will be copied to the CityÈs Planning Development Office approving the construction based on the requirements of this letter. The unitÈs deck is a limited common area and is subject the Declaration, having full architectural, construction and maintenance rights over the deck. As the current owner, you are responsible for all aspects of compliance with City, County, and State Codes, ensuring all work affecting the Seavue building is completed properly and meetssuch Code,as well as meeting the requirements of the AssociationÈs governing documents. Several aspects of the unitÈs deck appear not to meet appropriate codes and Seavue requirements. Your approval is granted, subject to the following requirements to brining the deck back to its original state: Having the enclosed deck heated with installed heating, as it currently does, is a violation of Snohomish County code, thus the heating unit and all electrical wiringto the heater must be removed; Any electrical outlets on the deck walls must be removed unless the current wiring meets exterior wall requirements; and the electrical outlets also meet exterior requirements; That electrical outlets on the building structure (stucco walls) must meet exterior outlet requirements; Walls of the deck may be wrapped in cedar strips as originally built, or as a recommended substitute useHardeboard sheets with artificialwood grain; ¨ Exterior stucco and deck walls must be painted in ShermanWilliams Resilience Acrylic Exterior Balanced Beige7037;If any of the current build out has removed or affectedthe stucco, you must notify us before any action is taken; The deck railing cap must be in good condition, ensure ita slight angledto the exterior ofthe building to allow rain runoff; and is painted withShermanWilliams ÅSeaviewBrownÆÃ(this ismix to match our Hardie Plank sidingwe had made), useSherwin Williams ResilienceAcrylic Exterior LatexPaint; The deck floor must be brought back to its original leveland surface, have a satisfactorydeckfloor for exterior purposes,if the originalis not in place, and coatedwithSherman Williams Super Deck Elastomeric Coating; Summerhouse Beige SW3004; the contractor must insure they follow the recommend preparation and coating application of the manufacturer; The contractor must be licensed and bonded through the Washington State Department of Labor and have a current City of Edmonds business license, as required by the City; Any rot needs to be identified and replaced, and all appropriate areas must bel be properly sealed; & The completed work is subject to City and Board approval. Any electrical work requires a State licensed contractor; and Seavue will provide the outdoor light that matches the other deck units. The Board reserves the right to amend or withdrawthis approval at any time; and in that event all work shall cease immediately and no further work will take place until approval is reinstated.