RCW 197-11-970 Determination of Nonsignificance (DNS)
MITIGATED DETERMINATION OF NONSIGNIFICANCE
Description of proposal: The City of Edmonds is proposing to replace Pump Station No. 2 and install
approximately 564 linear feet of water line between an existing water line at Cary Road to an existing
water line located near the western terminus of Melody Lane. Construction of the new Pump Station and
installation of new water and sewer lines will involve both open trench and trenchless construction
techniques resulting in temporary impacts to Shell Creek's associated wetland and permanent impact to
approximately 476 square feet of stream buffer which will be mitigated according to the City's critical area
ordinance. File Number PLN20100078.
Proponent: City of Edmonds
Location of proposal, including street address if any: The project is located in the City of Edmonds in
Township 27 N, Range 3E, Section 23. The existing pump station is located on private property (929 Cary
Road) approximately 400 feet east of Cary Road. The new pump station would be located on the eastern
side of Shell Creek, near the western terminus of Melody Lane. The project is located on several adjacent
parcels including parcel numbers 27032400210800, 27032400210900, and 27032400212000.
Lead agency: City of Edmonds
The lead agency has determined that the requirements for environmental analysis and protection have
been adequately addressed in the development regulations and comprehensive plan adopted under
chapter 36.70A RCW, and in other applicable local, state, or federal laws or rules, as provided by RCW
43.21C.240 and WAC 197-11-158 and/or mitigating measures have been applied that ensure no
significant adverse impacts will be created.
An environmental impact statement is not required under RCW 43.21 C.030(2)(c). This decision was
made after review of a completed environmental checklist and other information on file with the lead
agency. This information is available to the public on request.
There is no comment period for this DNS.
XX This DNS is issued under 197-11-340(2); the lead agency will not act on this proposal for 14
days from the date below. Comments must be submitted by January 25, 2011.
Project Planner: Kernen Lien Associate Planner
Responsible Official: Robert Chave
Position/Title: Manager - Planning Division
Phone: 425-771-0220
Address: City of Edmonds, 121 5th Avenue North, Edmonds, WA 98020
b
Date: January 11, 2011 Signature:
XX You may appeal this determination to Robert Chave, Planning Manager, at 121 5th Avenue
North, Edmonds, WA 98020, by filing a written appeal citing the specific reasons for the
appeal with the required appeal fee, adjacent property owners list and notarized affidavit form
no later than February 1, 2011. You should be prepared to make specific factual
objections. Contact Rob Chave to read or ask about the procedures for SEPA appeals.
XX Posted on January 11, 2011, at the Edmonds Public Library, Edmonds Community
Services Building, the Edmonds Post Office, and published in the Everett Herald.
Page 1 of 2
SEPA MDNS.DOC
1/7/1 I.SEPA
XX Emailed to the Department of Ecology along with a copy of the SEPA Checklist.
XX MITIGATING MEASURES INCORPORATED INTO THE PROPOSAL:
THE PROJECT MUST COMPLY WITH ALL CITY OF EDMONDS CRITICAL AREAS
REGULATIONS (EDMONDS COMMUNITY DEVELOPMENT CODE TITLE 23
"NATURAL RESOURCES"). SPECIFICALLY, THE MITIGATION MEASURES
IDENTIFIED IN THE AGENCY REVIEW DRAFT CRITICAL AREAS REPORT FOR THE
PUMP STATION NO. 2 REPLACEMENT PROJECT PREPARED BY LANDAU
ASSOCIATES DATED DECEMER 2, 2010 MUST BE IMPLEMENTED. ANY TREES
THAT ARE REMOVED IN CONJUNCTION WITH THE PROJECT MUST BE REPLACED
AT A RATIO OF 2:1. ANY PROPOSED CHANGES TO THE AGENCY REVIEW DRAFT
OF THE CRITICAL AREAS REPORT OR MITIGATION MEASURES MUST BE
APPROVED BY THE CITY OF EDMONDS PLANNING DIVISION.
2. IN THE EVENT THAT ANY GROUND -DISTURBING ACTIVITES DURING THE
PROJECT UNCOVER PROTECTED CULTURAL MATERIALS OR HUMAN REMAINS,
ALL WORK IN THE IMMEDIATE VICINITY SHOULD STOP, THE AREA SHOULD BE
SECURED, AND ANY EQUIPMENT MOVED TO A SAFE DISTANCE. THE
CONTRACTOR SHOULD THEN CONTACT THE APPROPRIATE AGENCY AND TRIBE
AS IDENTIFIED IN THE UNANTICIPATED DISCOVERIES PROTOCOL (UDP)
INCLUDED AS APPENDIX 3 OF THE ARCHAEOLOGICAL INVESTIGATION REPORT
PREPARED FOR THE PROJECT. A COPY OF THE UDP IN APPENDIX 3 SHALL BE
PROVIDED TO THE CONTRACTOR AND THE UDP MUST REMAIN ON SITE AT ALL
TIMES DURING THE IMPLEMENTATION OF THE PROJECT.
3. THE PROJECT MUST COMPLY WITH HYDRAULIC PROJECT APPROVAL (HPA)
FROM THE WASHINGTON STATE DEPARTMENT OF FISH AND WILDLIFE AND ANY
OTHER FEDERAL, STATE, OR LOCAL PERMITS REQUIRED FOR THE PROJECT.
Mailed notice of the SEPA Determination to property owners within 300 and to the following agencies:
XX
COMCAST
XX
Burlington Northern Railroad
Outside rlant Engineer, North Region
2900 Bond
1525 751 St SW Ste 200
Everett, WA 98201
Everett, WA 98203
XX
National Marine Fisheries Service
XX
Department of Fish & Wildlife
Northwest Regional Office
16018 Mill Creek Boulevard
7600 Sand Point Way NE
Mill Creek, WA 98012
Seattle, WA 98115-0070
XX
Puget Sound Partnership
XX
Donna J. Bunten
P.O. Box 40900
Department of Ecology
Olympia, WA 98504-0900
Shorelands & Environ. Assist. Program
XX
DNR SEPA Center
PO Box 47600
P.O. Box 47015
Olympia, WA 98504-7600
Olympia, WA 98504-7015
XX
US Army Corps of Egineers
XX
Puget Sound Regional Council
Regulatory Branch
Attn.: S.R.C.
PO Box 3755
1011 Western Avenue, Suite 500
Seattle, WA 98104-1035
Seattle, WA 98124-3755
XX
Snohomish County Planning &
Development Services
3000 Rockefeller
Everett, WA 98201
Attachments
SEPA Notebook
Page 2 of 2
SEPA MDNS.DOC
1/7/1 LSEPA