The State Environmental Policy Act (SEPA), chapter 43.21C RCW, requires all governmental agencies to consider the environmental
impacts of a proposal before making decisions. An environmental impact statement (EIS) must be prepared for all proposals with
probable significant adverse impacts on the quality of the environment. The purpose of this checklist is to provide information to help
you and the agency identify impacts from your proposal (and to reduce or avoid impacts from the proposal, if it can be done) and to
help the agency decide whether an EIS is required.
Instructions for Applicants:
This enviromnental checklist asks you to describe some basic information about your proposal. Governmental agencies use this
checklist to determine whether the environmental impacts of your proposal are significant, requiring preparation of an EIS. Answer
the questions briefly, with the most precise information known, or give the best description you can.
You must answer each question accurately and carefully, to the best of your knowledge. In most cases, you should be able to answer
the questions from your own observations or project plans without the need to hire experts. If you really do not know the answer, or if
a question does not apply to your proposal, write "do not know" or does not apply". Complete answers to the questions now may
avoid unnecessary delays later.
Some questions ask about governmental regulations, such as zoning, shoreline, and landmark designations. Answer these questions if
you can. If you have problems, the governmental agencies can assist you.
The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of
land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you
submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if there
may be significant adverse impact.
Use of checklist for nonproject proposals:
Complete this checklist for nonproject proposals, even though questions may be answered "does not apply." IN ADDITION, complete
the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (part D).
For nonproject actions, the references in the checklist to the words "project," "applicant," and "property or site" should be read as
"proposer," and "affected geographic area," respectively.
1. Name of proposed project, if applicable: SW Edmonds Basin Study Project I — Phase I — Infiltration Pipe
Improvements (Near 107"PI) and Infiltration System installation @ sump located at 10220 238`t' St. SW Edmonds
2. Name of applicant: Michele F. De Lilla, PE., LEED AP, Senior Utilities Engineer.
3. Address and phone number of applicant and contact person:
1215"' Avenue North Edmonds WA 98020
4. Date checklist prepared: April 26, 2013,
5. Agency requesting checklist: City of Edmonds
Revised on 8119111 P71_- SEPA_Checklistphase Ldoc Page 1 of 16
6. Proposed timing or schedule (including phasing, if applicable): Construction Summer/Fall 2013
(STAFF COMMENT
7. Do you have any plans for future additions, expansion, or further activity related to or connected with this
proposal? If yes, explain.
Yes Phase H of theproject will mitigate drainage issues on 238°i St SW f-wn 100'x' Ave W to 104'x' Ave W.
(STAFF COMMENTS)
8. List any environmental information you know about that has been prepared, or will be prepared, directly related
to this proposal.
None.
(STAFF COMMENTS)
9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting
the property covered by your proposal? If yes, explain.
No.
(STAFF COMMENTS)
10. List any government approvals or permits that will be needed for your proposal, if known.
UIC.
(STAFF COMMENTS)
11. Give brief, complete description of your proposal, including the proposed uses and size of the project and site.
There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You
do not need to repeat those answers on this page.
The project will mitigate street flooding that is taking place on 238`h St SW and adiacent streets during rainfall events by
installing approximately 3,000 linear feet of storm drain pipe and associated appurtenances plus replace a failing
infiltration system in the alley South of 107`' Place W.
(STAFF COMM
Revised on 8119111 P71-_SEPA_Checklist phase ].doe Page 2 of 16
12. Location of the proposal. Give sufficient information for a person to understand the precise location of your
proposed project, including a street address, if any, and section, township, and range, if known. If a proposal
would occur over a range of area, provide range or boundaries of the site(s). Provide legal description, site plan,
vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the
agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related
to this checklist.
The project will occur in an easement located at the SW corner of 10220 238`x' St and in the publicly owned alley behind
107"' Place West.
(STAFF COMME
B. ENVIRONMENTAL ELEMENTS
1. Earth
a. General description of the site (circle one): Flat, rolling, hilly, steep slopes, mountainous, other:
Rolling.
(STAFF COMMENTS)
b. What is the steepest slope on the site (approximate percent slope)?
5%
(STAFF CO
C. What general types of soils are found on the site (for example, clay, sand, gravel, peat, and muck)? If you
know the classification of agricultural soils, specify them and note any prime farmland.
Sand andrg avel
(STAFF COMMENTS)
d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe.
No.
(STAFF COMMENTS)
Revised on 8119111 P71- SEPA_Checklist phase l.doc Page 3 of 16
e. Describe the purpose, type and approximate quantities of any filling or grading proposed. Indicate source
of fill.
No grading or filling is proposed.
(STAFF COMMENTS)
L Could erosion occur as a result of clearing, construction, or use? If so, generally describe.
Erosion could take place due to trenching Best management practices (BMPs) will be used to minimize erosion
(STAFF COMMENTS)
g. About what percent of the site will be covered with impervious surfaces after project construction (for
example, asphalt or buildings)?
No increase.
(STAFF COMMENTS)
h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any:
Best management practices (BMPs) will be used to minimize erosion.
(STAFF COMMENTS)
2. AIR
a. What types of emissions to the air would result from the proposal (i.e., dust, automobile, odors, and
industrial wood smoke) during construction and when the project is completed? If any, generally describe
and give approximate quantities if known.
Emissions from construction equipment such as diesel powered backhoes trucks and other conventional
construction equipment.
(STAFF COMMENTS)
b. Are there any off-site sources of emissions or odor that may effect your proposal? If so, generally describe.
No.
(STAFF COMMENTS)
C. Proposed measures to reduce or control emissions or other impacts to the, if any:
Appropriate emission controls on construction vehicles.
(STAFF COMMENTS)
Revised on 8/19/11 P71-_SEPA_Checklist phase l.doc Page 4 of 16
3. WATER
a. Surface:
(1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and
seasonal streams, saltwater, lakes, ponds, and wetlands)? If yes, describe type and provide names. If
appropriate, state what stream or river it flows into.
No.
(STAFF COMMENTS)
(2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If
yes, please describe and attach available plans.
No.
(STAFF COMMENTS)
(3) Estimate the amount of fill and dredge material that would be placed in or removed from surface
water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill
material.
None.
(STAFF COMMENTS)
(4) Will the proposal require surface water withdrawals or diversions? Give general description,
purpose, and approximate quantities if known.
No.
(STAFF COMMENTS)
(5) Does the proposal lie within a 100 -year floodplain? If so, note location on the site plan.
The project does not lie in a FEMA designated 100 -year floodplain.
(STAFF COMMENTS)
(6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the
type of waste and anticipated volume of discharge.
No.
(STAFF COMMENTS)
b. Ground:
Revised on 8119111 P71-_SEPA Checklist phase Ldoc Page 5 of 16
(1) Will ground water be withdrawn, or will water be discharged to ground water? Give general
description, purpose, and approximate quantities if known.
Existing project site infiltrates stormwater runoff into the round. The project will take the runoff that
is currently on the surface causing flooding problems and glace it in underground infiltration systems
so that flooding issues in the area are mitigated. Stormwater runoff rate and volumes will not be increased.
(STAFF COMMENTS)
(2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if
any (for example: Domestic sewage; industrial, containing the following chemicals...; agricultural;
etc.). Describe the general size of the system, the number of such systems, the number of houses to be
served (if applicable), or the number of animals or humans the system(s) are expected to serve.
None.
(STAFF CO
C. Water Runoff (including storm water):
(1) Describe the source of runoff (including storm water) and method of collection and disposal, if any
(include quantities, if known). Where will this water flow? Will this water flow into other waters?
If so, describe.
Runoff from the project area will flow to its natural discharge area. BMPs will be in place during
construction to minimize the impact on receiving waters. The drainage pattern will not change during or
after construction.
(STAFF COMMENTS)
(2) Could waste materials enter ground or surface waters? If so, generally describe.
Construction and source control BMPs will be employed to prevent any discharge.
(STAFF COMMENTS)
d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any:
Construction BMPs will be employed to prevent any discharge.
(STAFF COMMENT
4. Plants
Revised on 8119111 P71_- SEPA_Checklistphase I.doc Page 6 of 16
a.
Check or circle types of vegetation found on the site:
X deciduous tree: alder, maple, aspen, other:.
X evergreen tree: fir, cedar, pine, other:
X shrubs
X grass
pasture
crop or grain
wet soil plants: cattail, buttercup, bulrush, skunk cabbage, other
water plants: water lily, eelgrass, milfoil, other:
X other types of vegetation: lawns and landscaping
(STAFF COMMENT
b. What kind and amount of vegetation will be removed or altered?
Lawn landscaping and sluubs will be removed and replaced as needed for the construction of the project.
(STAFF COMMENTS)
C. List threatened or endangered species known to be on or near the site.
None.
(STAFF COMMENTS)
d. Proposed landscaping, use of native plants, or other materials to preserve or enhance vegetation on the site,
if any:
None.
(STAFF COMMENTS)
5. Animals
a. Check or circle any birds and animals that have been observed on or near the site or are known to be on or
near the site:
X birds: hawk, heron, eagle, songbirds, other:
X mammals: deer, bear, elk, beaver, other: rodents, raccons, possum, squirrels
fish: bass, salmon, trout, herring, shellfish, other:
Revised on 8/19/11 P71- SEPA_Checklistphase I.doc Page 7 of 16
(STAFF COMMENTS)
b. List any threatened or endangered species known to be on or near the site.
None.
(STAFF COMMENTS)
C. Is the site part of a migration route? If so, explain.
No.
(STAFF COMMENTS)
d. Proposed measures to preserve or enhance wildlife, if any:
None. Current site conditions will not be altered.
(STAFF COMMENTS)
6. Energy and Natural Resources
a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed
project's energy needs? Describe whether it will be used for heating, manufacturing, etc.
Diesel fuel and gasoline for construction equipment.
(STAFF COMMENTS)
b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally
describe.
No.
(STAFF COMMENTS)
C. What kinds of energy conservation features are included in the plans of this proposal? List other proposed
measures to reduce or control energy impacts, if any:
None.
(STAFF
Revised on 8/19/11 P71_- SEPA_Checklist phase I.doc Page 8 of 16
7. Environmental Health
a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and
explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so describe.
No.
(STAFF COMMENTS)
(1) Describe special emergency services that might be required.
None.
(STAFF COMMENTS)
(2) Proposed measures to reduce or control environmental health hazards, if any:
None.
(STAFF COMMENTS)
b. Noise
(1) What types of noise exist in the area which may affect your project (for example: traffic, equipment,
operation, other)?
None.
(STAFF COMMENTS)
(2) What types and levels of noise would be created by or associated with the project on a short-term or
a long-term basis (for example: traffic, construction, operation, other)? Indicate what hour's noise
would come from the site.
Normal construction noise within the bounds and timingof Qfty Code.
(STAFF COMMENTS)
(3) Proposed measures to reduce or control noise impacts, if any:
Construction will be within the bounds and timing of City Code.
(STAFF COMMENTS)
Revised on 8119111 P71- SEPA_Checklist phase I.doc Page 9 of 16
8. Land and Shoreline Use
a. What is the current use of the site and adjacent properties?
Single-family residential church vacant gasoline station cemetery, recreational swimming (indoor) city roads and
state roads.
(STAFF COMMENTS)
b. Has the site been used for agriculture? If so, describe.
No.
(STAFF COMMENTS)
C. Describe any structures on the site.
Underground pipes and underground vaults.
(STAFF COMMENTS)
d. Will any structures be demolished? If so, what?
Existing storm catchbasins manholes and pipe that will be replaced with new storm pipe catch basins and
manholes.
(STAFF COMMENTS)
e. What is the current zoning classification of the site?
Does not have a designation because it is within city right of way/easements.
(STAFF COMMENTS)
f. What is the current comprehensive plan designation of the site?
Qfty right of waw
(STAFF COMMENTS)
g. If applicable, what is the current shoreline master plan designation of the site?
Revised on 8/19/11 P71_- SEPA_Checklist phase ].doe Page 10 of 16
N/A
(STAFF
h. Has any part of the site been classified as an "environmentally sensitive" area? If so, specify.
No.
(STAFF COMMENTS)
L Approximately how many people would reside or work in the completed project?
None.
(STAFF COMMENTS)
j. Approximately how many people would the completed project displace?
None.
(STAFF COMMENTS)
k. Proposed measures to avoid or reduce displacement impacts, if any:
None.
(STAFF COMMENTS)
1. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if
any:
The project would improve stormwater flooding issues in the area.
(STAFF COMMENTS)
9. Housing
a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income
housing.
None.
(STAFF COMMENTS)
Revised on 8/19/11 P71_-_SEPA_Checklist phase l.doc Page I1 of 16
b. Approximately how many units, if any would be eliminated? Indicate whether high, middle, or low-income
housing.
None.
(STAFF COMMENTS)
C. Proposed measures to reduce or control housing impacts, if any:
None.
(STAFF COMMENTS)
10. Aesthetics
a. What is the tallest height of any proposed structure(s), not including antennas; what is the principle
exterior building material(s) proposed?
Ground level.
(STAFF COMMENTS)
b. What views in the immediate vicinity would be altered or obstructed?
None.
(STAFF COMMENTS)
C. Proposed measures to reduce or control aesthetic impacts, if any:
None.
(STAFF COMMENTS)
11. Light and Glare
a. What type of light or glare will the proposal produce? What time of day would it mainly occur?
None.
(STAFF COMMENTS)
Revised on 8119111 P71 _-_SEPA_Checklist phase 1. doc Page 12 of 16
b. Could light or glare from the finished project be a safety hazard or interfere with views?
No.
(STAFF COMMENTS)
C. What existing off-site sources of light or glare may affect your proposal?
None.
(STAFF COMMENTS)
d. Proposed measures to reduce or control light and glare impacts, if any:
None.
(STAFF COMMENTS)
12. Recreation
a. What designated and informal recreational opportunities are in the immediate vicinity?
City Parks & Private Indoor Swimming Pool.
(STAFF COMMENTS)
b. Would the proposed project displace any existing recreation uses? If so, describe.
No.
(STAFF COMMENTS)
C. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be
provided by the project or applicant, if any:
None.
(STAFF COMMENTS)
13. Historic and Cultural Preservation
Revised on 8119111 P71- SEPA_Checklist phase ].doe Page 13 of 16
a. Are there any places or objects listed on, or proposed for, national, state, or local preservation registers F
known to be on or next to the site? If so, generally describe.
None known.
(STAFF COMMENTS)
b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural importance
known to be on or next to the site.
None known.
(STAFF COMMENTS)
C. Proposed measures to reduce or control impacts, if any:
If any historical or cultural artifacts are discovered during the project, work will be stopped and appropriate local
State Federal and Tribal authorities will be contacted.
(STAFF COMMENTS)
14. Transportation
a. Identify public streets and highways serving the site, and describe proposed access to the existing street
system. Show on site plans, if any.
The alley site is served by 104"' Ave W just south of Restlawn Memorial located at 23800 104th Ave W. The other
site is located on the Faith Community Church site located at 10220 238`' St SW and gets its access off of 238th St
SW between 104th Ave W and 102nd Ave W.
(STAFF COMMENTS)
b. Is site currently served by public transit? If no, what is the approximate distance to the nearest transit
stop?
No. Distance to nearest transit stop is approxately 1,000 feet west of the site, on 1001h Ave W north of the
intersection with 238th St SW.
(STAFF COMMENTS)
C. How many parking spaces would the completed project have? How many would the project eliminate?
None and none will be eliminated.
(STAFF COMMENTS)
Revised on 8119111 P71- SEPA_Checklist phase I.doc Page 14 of 16
d. Will the proposal require any new roads, streets, or improvements to existing roads or streets, not including
driveways? If so, generally describe (indicate whether public or private).
None.
(STAFF COMMENTS)
e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation? If so,
generally describe.
No.
(STAFF COMMENTS)
f. How many vehicular trips per day would be generated by the completed project? If known, indicate when
peak volumes would occur.
None.
(STAFF COMMENTS)
g. Proposed measures to reduce or control transportation impacts, if any:
Construction signage and traffic control.
(STAFF COMMENTS)
15. Public Services
a. Would the project result in an increased need for public services (for example: fire protection, police
protection, health care, schools, other)? If so, generally describe.
No.
(STAFF COMMENTS)
b. Proposed measures to reduce or control direct impacts on public services, if any:
None.
(STAFF COMMENTS)
16. Utilities
Revised on 8119111 P71- SEPA_Checklistphase I.doc Page 15 of 16
a. Circle utilities currently available at the site: electricity, natural gas, water, refuse service, telephone,
sanitary sewer, septic system, other:
See underlined above.
(STAFF COMMENTS
b. Describe the utilities that are proposed for the project, the utility providing the service, and the general
construction activities on the site or in the immediate vicinity which might be needed.
Replace old storm drain pipes, and install additional storm drain pipes, infiltration facilities, and appurtenances
owned by the City Stormwater Utility.
(STAFF CO
IN 10 LI _�1 0
I declare under penalty of perjury laws that the above answers are true and correct to the best of my knowledge. I understand
that the lead agency is relying on them to make its decision.
r
Signature of Proponent Date Submitted
Revised on 8119/11 P71- SEPA_Checklistphase I.doc Page 16 of 16