Loading...
SEPA_Checklist.pdfSt. Purpose of Checklist: #P71 CITY OF EDMONDS ENVIRONMENTAL CHECKLIST RECEIVED OCT 08 2019 DEVELOPN(EN'i SBAWCES (',OUNTFR The State Environmental Policy Act (SEPA), chapter 43.21C RCW, requires all governmental agencies to consider the environmental impacts of a proposal before making decisions. An environmental impact statement (EIS) must be prepared for all proposals with probable significant adverse impacts on the quality of the environment. The purpose of this checklist is to provide information to help you and the agency identify impacts from your proposal (and to reduce or avoid impacts from the proposal, if it can be done) and to help the agency decide whether an EIS is required. Instructions for Applicants: This environmental checklist asks you to describe some basic information about your proposal. Governmental agencies use this checklist to determine whether the environmental impacts of your proposal are significant, requiring preparation of an EIS. Answer the questions briefly, with the most precise information known, or give the best description you can. You must answer each question accurately and carefully, to the best of your knowledge. In most cases, you should be able to answer the questions from your own observations or project plans without the need to hire experts. If you really do not know the answer, or if a question does not apply to your proposal, write "do not know" or does not apply". Complete answers to the questions now may avoid unnecessary delays later. Some questions ask about governmental regulations, such as zoning, shoreline, and landmark designations. Answer these questions if you can. If you have problems, the governmental agencies can assist you. The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if there may be significant adverse impact. Use of checklist for nonproject proposals: For nonproject proposals complete this checklist and the supplemental sheet for nonproject actions (Part D). the lead agency may exclude any question for the environmental elements (Part B) which they determine do not contribute meaningfully to the analysis of the proposed nonproject actions, the references in the checklist to the words "project," "applicant," and "property or site" should be read as "proposer," and "affected geographic area," respectively. A. BACKGROUND 1. Name of proposed project, if applicable: Wallace Short Plat 2. Name of applicant: Ava Hom 3. Address and phone number of applicant and contact person: Ava Homes 16330 Inglewood Place, NE Kenmore, WA 98028 Contact Person: Bruce Wallace (206) 774-4065 4. Date checklist prepared: February 26, 2018 Revised on 9116116 wallace short plat sepa checklist 2-26-2019 Page I of 29 5. Agency requesting checklist: City of Edmonds 6. Proposed timing or schedule (including phasing, if applicable): Construciton to be -gin September 2019, homesw completed September 2020 (STAFF COMMENTS) 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. NO (STAFF COMMENTS) 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. Wetland delineation and critical area report completed by Sewall Wetland Consulting dated June 22 2017. (STAFF COMMENTS) 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. No (STAFF COMMENTS) Revised on 9119116 Wallace short plat sepa checklist 2-26-2019 Page 2 of 29 10. List any government approvals or permits that will be needed for your proposal, if known. None (STAFF COMMENTS) 11. Give brief, complete description of your proposal, including the proposed uses and size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. Project proposed a three lot short plat there is one existing house proposal is to create two new lots and construct two new dingle family residence. All utilities are in place new services will be required. Drainage is a full LID design with dispersion to the wetland and a perforated roof drain connection for the second home. All drainage design will be per the current city of Edmonds drainage code. (STAFF COMMENTS) 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide range or boundaries of the site(s). Provide legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. Location of the proiect is on the north side of 192"d St Sw. and then the east side of 8111 avenue west. Parcel number 00481600600800 site address of the exist» house to be lot 3 is 8025 192"d St SW in the city of Edmonds (STAFF COMMENTS) Revised on 9119116 Wallace short plat sepa checklist 2-26-2019 Page 3 of 29 TO BE COMPLETED BY APPLICANT B. ENVIRONMENTAL ELEMENTS 1. Earth a. General description of the site (circle one): Flat, rolling, hilly, steep slopes, mountainous, other: site is generally flat, with a high ride in the NW to SE direction, slopes from the NE half of the parcel flow to the onsite wetland, slopes from the SW half of the site flow SW to the adjacent frontage roads. Site grades are generally flat. Site vegetation is mature evergreens in the west north and east portions of the iste The existing home in the SE third of the site has a large landscaped Yard, which is primarily grass ans shrubs. (STAFF COMMENTS)— b. What is the steepest slope on the site (approximate percent slope)? 10% (STAFF COMMENTS) C. What general types of soils are found on the site (for example, clay, sand, gravel, peat, and muck)? If you know the classification of agricultural soils, specify them and note any agricultural land of long term commercial significance and whether the proposal results in removing any of these soils. Site soils are an Alderwood urban land complex (Glacial Till) (STAFF COMMENTS) d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. No, none. Revised on 9119116 wallace short plat sepa checklist 2-26-2019 Page 4 of 29 (STAFF COMMENTS) e. Describe the purpose, type, total area and approximate quantities and total affected area of any filling, excavation, and grading proposed. Indicate source of fill. Aparoxmiate area of clearing will be 1.1000 s.f. (lots 2 and 3). earthwork quantities are estimated to be 170 cy of cut. and 100 cy of fill. Fill sources will be an approved commercial pit, or an approved grading permitted site . (STAFF COMMENTS) f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. Yes, a Stormwater Pollution and Prevention Plan (SWPPP) will be designed and assembled. The SWPPP will followed to combat the potential for erosion. (STAFF COMMENTS) g. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? About 45% (STAFF COMMENTS)- h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: Silt Fences, wheel wash areas, armored construction entrances, street sweeping, mulching and coveringstockpiles tockpiles and exposed soils. (STAFF COMMENTS) i1 A I S Revised on 9119116 Wallace short plat sepa checklist 2-26-2019 Page 5 of 29 a. What types of emissions to the air would result from the proposal (i.e., dust, automobile, odors, and industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities if known. Normal emissions from two additional single family dwellings (STAFF COMMENTS)— b. Are there any off -site sources of emissions or odor that may effect your proposal? If so, generally describe. None known (STAFF COMMENTS) C. Proposed measures to reduce or control emissions or other impacts to the, if any: None (STAFF COMMENTS) 3. WATER a. Surface: (1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, and wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. There is an onsite unnamed wetland, no named streams flow to or from the wetland. (STAFF COMM (2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. Yes, there will be a dispersion trench constructed within the wetland buffer. This trench will help keep the wetland hydrated. Wetland buffers have been scored and rated to have 60 ft buffers. (STAFF COMMENTS) Revised on 9119116 wallace short plat sepa checklist 2-26-2019 Page 6 of 29 (3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. There will be no filling or disturbance of the wetland. (STAFF COMMENTS) (4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. None (STAFF COMMENTS) (5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. No (STAFF COMMENTS) (6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. None (STAFF COMMENTS) b. Ground: (1) Will ground water be withdrawn from a well for drinking water or other purposes? If so, give a general description of the well, proposed uses and approximate quantities withdrawn from the well Revised on 9119116 Wallace short plat sepa checklist 2-26-2019 Page 7 of 29 Will water be discharged to ground water? Give general description, purpose, and approximate quantities if known. Project is on city water, there will be no wells drilled. (STAFF COMMENTS) (2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example: Domestic sewage; industrial, containing the following chemicals...; agricultural; etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. The project will be hooked up to city sewer, there will be no septicsystems. (STAFF COMM C. Water Runoff (including storm water): (1) Describe the source of runoff (including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. Runoff from roofs and driveways, roof runoff will be routed to the dispersion trench and released to the wetland, driveway runoff will sheet flow across the lots, gradually infiltrate. There is also a perforated stub out connection to the existingdrainage rainage system in the project frontage. The existing house flows to the existing city drainage system. (STAFF COMMENTS) (2) Could waste materials enter ground or surface waters? If so, generally describe. No. unless a present or future homeowner were to purchase or generate some waste materials and dischare them onto the site. Revised on 9119116 wallace short plat sepa checklist 2-26-2019 Page 8 of 29 (STAFF COMMENTS) (3) Does the proposal alter or otherwise affect drainage patterns in the vicinity of the site? If so, describe. No. existin2 driaange patters are maintained per the City of Edmonds drainage manual. (STAFF COMMENTS) d. Proposed measures to reduce or control surface, ground, runoff water, and drainage pattern impacts, if any: dispersion trenches, sheet flow dispersion, and perforated stub out connections. 4. Plants a. (STAFF COMMENTS) Check or circle types of vegetation found on the site: X deciduous tree: alder, maple, aspen, other: X evergreen tree: fir, cedar, pine, other: X shrubs X grass pasture crop or grain Orchards, vineyards or other permanent crops X wet soil plants: cattail, buttercup, bulrush, skunk cabbage, other: water plants: water lily, eelgrass, milfoil, other: X other types of vegetation: Vegetable Garden (STAFF COMMENTS)_ Revised on 9119116 Wallace short plat sepa checklist 2-26-2019 Page 9 of 29 b. What kind and amount of vegetation will be removed or altered? Approximately I6,000 s.f of native vegetation will be removed, essentially all of the vegetation on the lots that is not within the wetland buffer. (STAFF COMMENTS) Revised on 9119116 wallace short plat sepa checklist 2-26-2019 Page 10 of 29 C. List threatened or endangered species known to be on or near the site. None known (STAFF COMMENTS) d. Proposed landscaping, use of native plants, or other materials to preserve or enhance vegetation on the site, if any: lots will be landscaped upon completion of the houses. (STAFF COMMENTS) C. List all noxious weeds and invasive species known to be on or near the site. Himalayan blackberries (STAFF COMMENTS) 5. Animals a. List any birds and other animals that have been observed on or near the site or are known to be on or near the site. Examples include: birds: hawk, heron, eagle, sonLibirds, other: mammals: deer, bear, elk, beaver, other: fish: bass, salmon, trout, herring, shellfish, other: Revised on 9119116 wallace short plat sepa checklist 2-26-2019 Page 11 of 29 (STAFF COMMENTS) b. List any threatened or endangered species known to be on or near the site. None known (STAFF COMMENTS) C. Is the site part of a migration route? If so, explain. Not a part of an immiggration route (STAFF COMMENTS) d. Proposed measures to preserve or enhance wildlife, if any: The onsite wetland and buffer will be preserved, hydrology to the wetland will be maintanined (STAFF COMMENTS) e. List any invasive animal species known to be on or near the site. None known (STAFF COMMENTS) Revised on 9119116 wallace short plat sepa checklist 2-26-2019 Page 12 of 29 6. Energy and Natural Resources a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. Electricity is used for lighting. Electricity and/or natural gas are used for heating_ (STAFF COMMENTS) b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. No (STAFF COM M ENTS) C. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: The requirements of the International Building Code (IBC) will be satisfied during the construction of the new residences. (STAFF COMMENTS) 7. Environmental Health a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so describe. This proposal will not create any environmental health hazards. Revised on 9119116 wallace short plat sepa checklist 2-26-2019 Page 13 of 29 (STAFF COMMENTS)_ (1) Describe any known or possible contamination at the site from present or past uses. None known (STAFF COMMENTS) (2) Describe existing hazardous chemicals/conditions that might affect project development and design. This includes underground hazardous liquid and gas transmission pipelines located within the project area and in the vicinity. (STAFF COMMENTS) (3) Describe any toxic or hazardous chemicals that might be stored, used, or produced during the project's development or constructions, or at any time during the operating life of the project. No hazardous chemicals proposed to be used other than standard construction vehicle fuels and lubricants (STAFF COMMENTS) (4) Describe special emergency services that might be required. No special energy services required (STAFF COMMENTS) Revised on 9119116 wallace short plat sepa checklist 2-26-2019 Page 14 of 29 (5) Proposed measures to reduce or control environmental health hazards, if any: None proposed (STAFF COMMENTS) b. Noise (1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? Traffic on existing roads near the site would be audible (STAFF COMMENTS) (2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hour's noise would come from the site. Short term noise impacts would result from the use of construction equipment during daylight hours. At 200 feet from the area of construction, Leq would be approximately the following: Activity Clearing Excavation Foundations Building Erection Finishing (STAFF COMMENTS Lea (in decibels 71-72 59-77 65 60-72 62-77 Revised on 9119116 Wallace short plat sepa checklist 2-26-2019 Page 15 of 29 (3) Proposed measures to reduce or control noise impacts, if any: Construction activities would comply with the Washington State law with regard to noise levels. The residential land use is expected to generate typical residential noises and noise levels. (STAFF COMMENTS)_ Revised on 9119116 Wallace short plat sepa checklist 2-26-2019 Page 16 of 29 8. Land and Shoreline Use a. What is the current use of the site and adjacent properties? Will the proposal affect current land uses on nearby or adjacent properties? If so, describe. Residential uses to the north south east and west. (STAFF COMMENTS) b. Has the project site been used as working farmlands or working forest lands? If so, describe. How much agricultural or forest land of long-term commercial significance will be converted to other uses as a result of the proposal, if any? If resource lands have not been designated, how many acres in farmland or forest land tax status will be converted to nonfarm or nonforest use? No agricultural uses have been knows to take place on the site. (STAFF COMMENTS) (1) Will the proposal affect or be affected by surrounding working farm or forest land normal business operations, such as oversize equipment access, the application of pesticides, tilling, and harvesting? If so, how: No (STAFF COMMENTS) C. Describe any structures on the site. There is an existing house, and 5 small to medium, sheds on the site. (STAFF COMMENTS) Revised on 9119116 Wallace short plat sepa checklist 2-26-2019 Page 17 of 29 d. Will any structures be demolished? If so, what? The existing house will remain, all of the sheds will be demolished (STAFF COMME e. What is the current zoning classification of the site? RS-10. Low Density Residential (STAFF COMMENTS) f. What is the current comprehensive plan designation of the site? Single Family Urban 3 (STAFF COMMENTS) g. If applicable, what is the current shoreline master plan designation of the site? N/A, not within a shoreline of the state (STAFF COMMENTS h. Has any part of the site been classified critical area by the city? If so, specify. No (STAFF COM Revised on 9119116 wallace short plat sepa checklist 2-26-2019 Page 18 of 29 i. Approximately how many people would reside or work in the completed project? 4 to 6 are predicted to reside on the proiect, in addition to those in the existing house (STAFF COMM F, NTT) j. Approximately how many people would the completed project displace: None (STAFF COMMENTS) k. Proposed measures to avoid or reduce displacement impacts, if any: None (STAFF COMMENTS) I. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: proposed use is residential, which is compatible with the land use designation. (STAFF COMMENTS) M. Proposed measures to reduce or control impacts to agricultural and forest lands of long-term commercial significance, if any: None (STAFF COMMENTS) _ Revised on 9119116 wallace short plat sepa checklist 2-26-2019 Page 19 of 29 9. Housing a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income housing. Three total, middle income housing (STAFF COMMENTS) b. Approximately how many units, if any would be eliminated? Indicate whether high, middle, or low-income housing. (STAFF COMM C. Proposed measures to reduce or control housing impacts, if any: None (STAFF COMMENTS) 10. Aesthetics a. What is the tallest height of any proposed structure(s), not including antennas; what is the principle exterior building material(s) proposed? 28 feet, exterior building materials will be a combination of masonry, wood and concrete siding. The concrete siding is designed and manufactured to look like wood. (STAFF COMMENT Revised on 9119116 wallace short plat sepa checklist 2-26-2019 Page 20 of 29 b. What views in the immediate vicinity would be altered or obstructed? Trees will be removed. the view of the trees on site will be eliminated. (STAFF COMMENTS C. Proposed measures to reduce or control aesthetic impacts, if any: None are proposed (STAFF COMME 11. Light and Glare a. What type of light or glare will the proposal produce? What time of day would it mainly occur? The instant proposal may have a limited amount of light and glare impact associated with vehicles travelling to and from the site and entering and leaving the public roadway during night time hours. The extent of the impact is expected to be negligible (STAFF COMMENTS)_ b. Could light or glare from the finished project be a safety hazard or interfere with views? No (STAFF COMMENTS)- -C . What existing off -site sources of light or glare may affect your proposal? None anticipated (STAFF COMMENTS)_ Revised on 9119116 wallace short plat sepa checklist 2-26-2019 Page 21 of 29 d. Proposed measures to reduce or control light and glare impacts, if any: None proposed (STAFF COMMENTS) 12. Recreation a. What designated and informal recreational opportunities are in the immediate vicinity? The -ad jacent parcel north of the site is an Edmonds city park with a_ baseball_ field and wooded open space, there are several city_parks in the area. (STAFF COMMENTS) b. Would the proposed project displace any existing recreation uses? If so, describe. No (STAFF COMMENTS) C. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: None proposed (STAFF COMMENTS) Revised on 9119116 Wallace short plat sepa checklist 2-26-2019 Page 22 of 29 13. Historic and Cultural Preservation a. Are there any buildings, structures, or sites located on or near the site that are over 45 years old listed in, or eligible for listing in national, state, or local preservation registers? If so, specifically describe. None known (STAFF COMMENTS) b. Are there any landmarks, features, or other evidence of Indian or historic use or occupation? This may include human burials or old cemeteries. Are there any material evidence, artifacts, or areas of cultural importance on or near the site? Please list any professional studies conducted at the site to identify such resources. None known (STAFF COMMENTS) C. Describe the methods used to assess the potential impacts to cultural and historic resources on or near the project site. Examples include consultation with tribes and the Department of Archeology and Historic Preservation, archaeological surveys, historic maps, GIS date, etc. If any archaeological artifacts were discovered during construction, activity in that area would be halted and the State Historic Preservation Officer would be contacted. (STAFF COMMENTS)_ d. Proposed measures to avoid, minimize, or compensate for loss, changes to, and disturbance to resources. Please include plans for the above and any permits that may be required. If any archaeological artifacts were discovered during construction, activity in that area would be halted and the State Historic Preservation Officer would be contacted. Revised on 9119116 Wallace short plat sepa checklist 2-26-2019 Page 23 of 29 (STAFF COMMENTS)_ 14. Transportation a. Identify public streets and highways serving the site or affected geographic area, and describe proposed access to the existing street system. Show on site plans, if any. Location of the project is on the north side of 192' st Sw. and then the east side of 81" avenue west. Parcel number 00481600600800. site address of the existing house to be lot 3 is 8025 192"d st SW in the city of Edmonds All access is shown on the preliminary drainage plans. (STAFF COMMENTS) b. Is the site or affected geographic area currently served by public transit? If so, generally describe. If not, what is the approximate distance to the nearest transit stop? Bus Service will serve the site along 801h avenue NE (STAFF COMMENTS) C. How many additional parking spaces would the completed project or nonproject proposal have? How many would the project or proposal eliminate? 4 total new in garages, 4 total new in driveways, total of 8 new parking spaces. (STAFF COMM Revised on 9119116 wallace short plat sepa checklist 2-26-2019 Page 24 of 29 d. Will the proposal require any new or improvements to existing roads, streets, pedestrian, bicycle or state transportation facilities not including driveways? If so, generally describe (indicate whether public or private). Yes 192"d and 8151 will be widened to a minimum of 22 ft of total pavement width along both frontages. (STAFF COMMEN l'S)_ e. Will the project or proposal use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. No (STAFF COMMENTS) f. How many vehicular trips per day would be generated by the completed project? If known, indicate when peak volumes would occur and what percentage of the volume would be trucks (such as commercial and passenger vehicles). What data or transportation models were used to make these estimates? A typical Average daily trip for a single family residence is about 10. so 20 additional trips. (STAFF COMMENTS) g. Will the proposal interfere with, affect or be affected by the movement of agricultural and forest products on roads or streets in the area? If so, generally describe. No (STAFF COMMENTS Revised on 9119116 wallace short plat sepa checklist 2-26-2019 Page 25 of 29 h. Proposed measures to reduce or control transportation impacts, if any: None (STAFF COMMENTS) 15. Public Services a. Would the project result in an increased need for public services (for example: fire protection, police protection, public transit, health care, schools, other)? If so, generally describe. The instant proposal will increase the number of residential housing units to be served by public service entities. However, the addition of two residences in this area is not expected to cause a significant impact of public services (STAFF COMMENTS) b. Proposed measures to reduce or control direct impacts on public services, if any: None (STAFF COMMENTS) 16. Utilities a. Circle utilities currently available at the site: electricity, natural gas, water, refuse scr%ice, telephone, sanitary sewer, septic system, other: Revised on 9119116 wallace short plat sepa checklist 2-26-2019 Page 26 of 29 (STAFF COMMENTS) b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. Electricity - Snohomish County PUD Water & Sewer - City of Edmonds Cable - Comcast Phone - Frontier Utility Extensions will be the responsibility of the applicant (STAFF COMMENTS) C. SIGNATURE of perjury laws that the above answers are true and correct to the best of my knowledge. I understand •elying on them to make its decision. of Proponent June 11, 2019 Date Submitted Revised on 9119116 Wallace short plat sepa checklist 2-26-2019 Page 27 of 29 D. SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (do not use this sheet for project actions) Because these questions are very general, it may be helpful to read them in conjunction with the list of the elements of the environment. When answering these questions, be aware of the extent the proposal, or the types of activities likely to result from the proposal, would affect the item at a greater intensity or at a faster rate than if the proposal were not implemented. Respond briefly and in general terms. 1. How would the proposal be likely to increase discharge to water; emissions to air; production, storage, or release of toxic or hazardous substances; or production of noise? Proposal measures to avoid or reduce such increases are: 2. How would the proposal be likely to affect plants, animals, fish, or marine life? Proposed measures to protect or conserve plants, animals, fish, or marine life are: 3. How would the proposal be likely to deplete energy or natural resources? Proposed measures to protect or conserve energy and natural resources are: Revised on 9119116 Wallace short plat sepa checklist 2-26-2019 Page 28 of 29 4. How would the proposal be likely to use or affect environmentally sensitive areas or areas designated (or eligible or under study) for governmental protection; such as parks, wilderness, wild and scenic rivers, threatened or endangered species habitat, historic or cultural sites, wetlands, floodplains, or prime farmlands? Proposed measures to protect such resources or to avoid or reduce impacts are: 5. How would the proposal be likely to affect land and shoreline use, including whether it would allow or encourage land or shoreline uses incompatible with existing plans? Proposed measures to avoid or reduce shoreline and land use impacts are: 6. How would the proposal be likely to increase demands on transportation or public services and utilities? Proposed measures to reduce or respond to such demand(s) are: 7. Identify, if possible, whether the proposal may conflict with local, state, or federal laws or requirements for the protection of the environment. Revised on 9119116 wallace short plat sepa checklist 2-26-2019 Page 29 of 29