Loading...
sheehangeoltr.pdfNELSON GEOTECHNICAL NGA ASSOCIATES, INC. GEOTECHNICAL ENGINEERS & GEOLOGISTS Main Office Engineering -Geology Branch 17311 — 135`h Avenue NE, A-500 112 Olds Station Road, Suite C Woodinville, WA 98072 r Wenatchee, WA 98801 .(425)48.6-1669 . FAX (425) 481-2510 ' 509 (425) 33-1669 Snohomish County ` ( ) 6 65-7686 (Phone/Fax) )MEMORANDUM DATE: October 5, 2006 TO: Tom Sheehan CC: Ed Baker — Baker Engineers, Inc. (fax) w FROM: Khaled Shawish, PE Bala Dodoye-Aiali RE: Sheehan Pool Repair Slope Stability Issues Edmonds, Washington NGA File No. 712905 Y 06 We have been requested to comment on potential impacts to a steep slope adjacent to your planned pool repair project at your residence in Edmonds, Washington. We previously prepared a geotechnical report for the project titled "Geotechnical Engineering Evaluation — Sheehan Pool Repairs — Edmonds, Washington," dated July 27, 2005- For our use in preparing this memo, we have been provided with a letter from the City of Edmonds dated August 17, 2006 requesting our review comments. Project plans include replacing a failing wall that currently provides support for your pool. The pool will be emptied and braced during wall replacement. A steep slope is located off the property, across an access driveway, and as a result, we have been informed that the site is mapped within a Steep Slope Hazard Areas and Erosion Hazard Areas as defined by the City of Edmonds. We have reviewed Section 23.80.050 in the Edmonds Community Development Code. Base on our review, site observations, and our understanding of the project, it is our opinion that the planned improvements should not have an adverse impacts on the off-site slope, providing all recommendations presented in our previous report are followed. Erosion control measures will be implemented during construction to keep muddy water from leaving the site and reaching the slope. Also, permanent drains will be incorporated into the pool and tightlined away from the slope. The slope will be monitored during construction. When the project is completed, all Memorandum Sheehan Pool Repairs Edmonds, Washington October 5, 2006 NGA File No. 712905 Page 2 exposed surfaces will be covered and therefore there should be no increased potential for long-term erosion. The final product should result in less risk to the slope compared to the current conditions created by the failing wall_ We trust this memorandum should satisfy your needs at this time. Please call if you have any questions or require additional services. NELSON GEOTECHNICAL ASSOCIATES, INC.