Loading...
sheehanspecinsp.pdfOCT31 2006 CITY OF EDMONDS €-L dV SPECIAL INSPECTION AND TESTING AGREEME -` EDwombs The project at to !QQ (?Lli'l, Ltw t .J issued under building hermit numberrequires special inspection andlor testing per IBC Chapter 17. The complete list of special inspections is attached to this document. BEFORE A PERMIT CAN BE ISSUED: The owner and contractor and special inspector shall complete this agreement and the attached structural test(s) and inspections schedule including the required acknowledgements_ APPROVAL OF SPECIAL INSPECTORS: Each special inspector shall be approved by the Building Official prior to performing any duties or inspections. Each special inspector shall submit Statement of Qualifications to the Building Official for review. Special inspectors shall display identification when performing special inspections on site. Special inspection and testing shall meet the minimum requirements of IBC Chapter 17 and the following: A. Duties and Responsibilities of the Special Inspector I. Observe Work The special inspector shall observe the site work for conformance with the approved (stamped) plans and specifications and applicable workmanship provisions of the IBC. Architect or Engineer reviewed shop drawings may be used only as an aid to inspection. Special Inspections are to be performed on a continuous basis—meaning that the special inspector is on site at all times observing the work requiring special inspection. Periodic inspections, if any, must have prior approval by the City based on a separate written plan reviewed and approved by the Building Official and the engineer or architect of record. 2. Report Non -conforming Items The special inspector shall bring non -conforming items to the immediate attention of the contractor and note all such items in the daily field report. Any item not resolved in a timely manner shall be immediate cause of the special inspector to notify the Building Official of the plan deviation, error, change or omission. It shall also be the duty of the special inspector to promptly notify the engineer or architect. 3. Complete Daily Reports Each special inspector shall complete and sign both the special inspection record and the daily report form for each day's inspection. These records shall remain at the jobsite with the contractor for review by the City Building Inspector. 4. Furnish Weekly Reports The special inspector or inspection agency shall furnish the City with weekly reports of tests and inspections. The project engineer or architect, and others as designated shall also be copied on reports. Weekly reports must include the following: • Description of daily inspections and tests made with applicable locations • List of all non --conforming items • Report on status of non -conforming items (resolved or unresolved) • Itemized changes authorized by the Architect, Engineer and City if not included in non- conformance items. 5. Furnish Final Construction Report The special inspector or inspection agency shall submit a final signed report to the City stating that all items requiring special inspection and testing were fulfilled and reported. And, to the best of L_ITEMPIBUILDING1SpeciallnspectionAgreernentlBC_doc 7/04 his/her knowledge the project is in conformance with the approved plans and specifications, approved change orders and the applicable workmanship provisions of the IBC. Items not in conformance or unresolved items or any discrepancies in inspection coverage, (i.e., missed inspections, periodic inspection when continuous inspections were required, etc.) shall be specifically itemized in this report. B. Contractor Responsibilities 1. Notify the Special Inspector It is the duty of the contractor to nody the special inspector when work is ready for special inspection. Note, the items listed on the attached schedule and as noted on the approved plans and specifications are required to have special inspections. Adequate notice shall be provided by the contractor so that the special inspector has time to become familiar with the project. 2. Provide Access to Approved Plans The contractor is responsible for providing the special inspector access to approved plans at the jobsite. 3. Retain Special Inspection Records The contractor is responsible'to retain at the jobsite all special inspection records submitted by the special inspector. These records are to be provided to the City building inspector upon request. C. City of Edmonds Building Department Responsibilities 1. Approve special inspectors or inspection: agencies The building department shall approve all special inspectors and special inspection requirements. 2. Monitor special inspection and approve weekly reports Work requiring special inspection and the performance of special inspectors shall be monitored by the City Building Inspector. Ifis/Her approval must be obtained prior to placement of concrete or other similar activities in addition to that of the special inspector. 3. Issue Certificate of Occupancy The Building Official may issue a Certificate of Occupancy after all weekly special inspection reports including the finial report have been submitted and accepted. D. Owner Res onsibilities The project owner or the engineer or architect of record acting as the owner's agent shall fund special inspection services. E. Engineer or Architect of Record Responsibilities The engineer or architect of record shall include special inspection requirements on the plans and specifications. ACKN'O'WLEDGEMENTS A_ ,07e gree p comply with the terms and conditions of this agreement. Date 7 Special Inspector General Contract Date S� Date City Building Of i " Date �� f t.:1TEMi'1BUli.DINGlSpecOlbspectionAgreeinentlBC.doc 7104 11-08-`06 10:51 FROM -Nelson Geotechnical 425-481-2510 T-265 P002/002 F-127 his/her knowledge the project is in conformance with the approved plans and specifications, approved chore orders mind the,applicable wurknoambip prgvisions or the W. Items not in conformance or unresolved ktma or any disckepaudes in inspection coverage, (i.et, zus"ed inspectioaas, periodic inspection wbeu continuous inspectious were regnired, etc.) . p i�ly itemized in this report. Cotttrnctor es onsibil' s 14' 14 21106 I. Notify the special Inspector SUILMNG DEPARTMENT It is the duty of the contractor to notify the speefisl inspector when work Is ready N siiWMNI 'S inspection. Note, the item listed on the attached schedule alas noted on the approved plans and specificatfow are squired to have special inspections. Adequate no tiee shall be provided by the contractor so that the special inspector has tbne to become familiar with the project. 2. Provide Access to Approvet3 Plan& The contractor is responsible for providing the special inspector•access to approved plans at,the jobsite. . 3. Retain Special Inspection Records The contractor is responsible to retain at the jobshe all special inspection records sabot.W l! by tial special itaapectur. These records are to be provided to the City banding inspector upon request. City _of ZdmoMgLAgHding DetiartweAt ResDg3LM1i es 1. Approve special inspectors or inspection agencies The bnildfag department sban approve all sped Inspectors and spectat inspection regnhaments. i. Monitor special lntpettioin and approve weekly reports Work raquising apedal inspection and the performance of special inspectors shall be monitored by tine city Building Inspector, H&Mor approval roust be obtained prior to placement of concrete or other Amilar aetirities iq addition to that of the special inspector 3. Issue Certificate of Occupancy The Building OMcial 1n*y Isspe a CertMcste of Occupancy atter ail weekly special inspection reports inclatding the final report have been subxpitted and accepted. Owner Resvinsibillues The project owner or the eaginter or Qrebitect of record seting ss the owner's agent shall fund special 14spectlam 5ervicsa. EpzLn= or Architect ofWI-ord ResooasiW The engineer or architect of record shall include special lnapecdon regnirementa on the plans and specifications. I have read aged agree � S Contractor Building ACISN0WLMGEMENTs omply with the tents and Wad wo"s of th b agreem"A' ► pE 7/04 Date Date p Date Date �r I'd 8999-ILL-92�, S'd `ouI `5Ja3ut1u3 Jalieg 61 ¢11 9002 90 ^oN INSPECTION AND TESTING SCHEDULE FROACT ADDRM REINFORCED CONCRETE, GUNITE, GROUT AND MORTAR: CeDerete Gwnite Groat Mortar Tests ¢ Tests PRECAST/PRESTRESSED CONCRETE: r JF OJ -TCM rTe! scar Tests ate Tests ting Tests Tcsts Mix Designs Reinforcing Placement Insert Placement Conctetc Batching Concrete Placement hAtallation Insepction Cast Samples Tests MASONRY: — Special Inspection Stresses Used — Preliminary Acceptance Tests (Masonry Units. Wall Prisms) — Sable" st Tests (Mortar. Grout. Field Wall Prisms) — Placement Inspection of Units STRUCTURAL MEL/VVELDING: — Sample ad Test (list sj a is members b6 w) — Shop Material Identification — Wi- i Inspection D Shop D Field — Ultrasonic Inspection DSbop D Field Iliglt-smngth Bolting Ir "On D Shop .D Field DA325 pN ©X DF DA490 — Metal Deck Welding Inspection j — Reinforcing Steel Welding Inspcc6on — Metal Stud Welding inspection — Comet¢ Insert Welding Inspection FIRETROOFING_ — Placement Inspection — Density Tcsts — Thickrxss Tests — Inspect Batching INSULATING CONCRETE: — Sample and Test — Placement Inspection — Unit Weights FILL MATERIAL: — Acceptance Tests Placement Inspection — Fuld Density STRUCTURAL WOOD: Shear Wall Nailing Inspection — Inspection of Glu -lam Fab. Inspection of Truss Joist Fab_ ADDITIONAL INSTRUCTIONS OR OTHER TESTS — 5ampte and Tut Components AND INSPECTIONS: • Soil Bearing Verification " • Excavation/Grading/Site Preparation • Placement of Fill and Compaction — • Subsurface drainage installation • Temp and Final Erosion Control • General Site Monitoring During Wet Weather Construction • Geotech of Record to determine location and extent of damage to leaking pool as noted in` Geotech report and provide recommendations for repair if necessary Form completed by. Title: Telephone No-: Date: