Loading...
Shoreline Exemption - Unocal pier removal.pdfI0c.18C}0 July 9, 2008 CITY OF EDMONDS GARY HAAKENSO MAYOR 121 5TH AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 • FAX (425) 771-0221 Website: www.ci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning • Building • Engineering WA State Department of Ecology Environmental Review Section Shorelines Program 3190 1601` Avenue SE Bellevue, WA 98008-5452 Mr. Kojo Fordjour, AICD Environmental and Permitting Manager Washington State Ferries Terminal Engineering 2901 3rd Avenue, Suite 500 Seattle, WA 98121-3014 Subject: UNOCAL PIER REMOVAL — REQUEST FOR SHORELINE EXEMPTION Dear Mr. Fordjour: The City of Edmonds Planning Division has reviewed your letter dated June 18, 2008, requesting exemption from the requirement to obtain a Shoreline Substantial Development Permit (SDP) for the purposes of removing the old Unocal pier in advance of the Edmonds Crossing Project. According to your letter, approximately 530 creosote treated wood piles and 3 1, 000 square feet of overwater coverage will be removed, enhancing the local marine environment. Upon review of the information provided, which included an associated Joint Aquatic Resources Permit Application (DARPA), the City has concluded that the proposed work is exempt from the need to obtain a Shoreline Substantial Development Permit pursuant to WAC Sections 173-27- 040(2)(m). If the scope or timing of the project changes substantially, please let us know. Sincerely, j} Michael D. Clugston, AICP Planner • Incorporated August 11, 1.890 • Sister City - Hekinan, Japan Cc: Burt Miller Washington State Ferries Terminal Engineering 2901 3rd Avenue, Suite 500 Seattle, WA 98121-3014 Kynan Patterson Washington State Ferries Terminal Engineering 29013 A Avenue, Suite 500 Seattle, WA 98121-3014