Loading...
Side Sewer Approved Permit.pdfv ° CITY OF EDMONDS 121 5TH AVENUENORTH - EDMONDS, WA 98020 PHONE: (425) 771-0220 - FAX: (425) 771-0221 *PERMIT MUST BE POSTED ON JOBSITE* STATUS: ISSUED ENG20180310 SIDE SEWER PERMIT (I -Single Family) Permit Number: ENG20180310 Expiration Date: 10/19/2018 Job Address: 7700 209TH ST SW, EDMONDS APPLICANT O. Pricor Technologies Pricor Technologies 2825 S 154th St 2825 S 154th St Seatac, WA 98188 Seatac, WA 98188 (206)258-5270 LICENSE #: pricotl865kz EXP: 05/09/2020 Y N DESCRIPTIONJOB REPAIR N I PROPOSE TO REUSE LATERAL LIDNUMBER: 1GRrNDERPumP N I PROPOSE TO REUSE SIDE SEWER N DRAINAGE 5 foot spot repair near foundation EASEMENTO' N PROJECT CROSSES OTHER PRIVATE PROPERTY N IVERIFICATIONOF RECORDED EASEMENTS COMPLETE INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims ofany kind or description Whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any ofils departments or employees, including but not limited to the defense ofany legal proceedings including defense costs and attorney fees by reason ofgranling this permit. CALL DIALrA-DIG (1-800-424-5555) BEFORE ANY EXCAVATION CALL FOR INSPECTION (425) 771-0220 EXT. 1326 24 HOUR NOTICEREQUIRED FOR ALL INSPECTION REQUESTS THIS APPLICATION IS NOT A PERNflTUNTIL SIGNED BY THE CITY ENGINEER OR H IS/HER DEPUTY: AND FEES ARE PAID, AND RECEIPT IS ACKNOWLEDGED IN SPACE PROVIDED. Printed: Friday, July 20,201 -7�7"O, DATE ❑ FILE COPY ❑ INSPECTOR COPY ❑ APPLICANT COPY STATUS: ISSUED ENG20180310 • Refer to City of Edmonds Side Sewer Information handout for approved pipe materials, inspections and other requirements. • A 6" cleanout with 12" locking cast iron lamphole cover is required at the property line. • Maintain 10' separation between the sanitary side sewer and the water service line. • A separate right-of-way construction permit is required forwork within the City right-of-way. • Condition of the existing lateral to be verified by the City's Public Works Dept. to obtain approval for reuse. Contact Edmonds Sewer Div is ion at 425-771-0235. • Condition ofthe existing sanitary side sewerto be verified prior to obtaining approval for reuse. TV inspection required. Video to be submitted to City for review. • Easement and/or permission fi•om adjacent property owner is required prior to entry/work within adjacent property. • Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per City standards that is caused by or occurs during the permitted project. • Owner/Contractor to provide Side Sewer asbuilt at final inspection. See City Standards for requirements. • Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits ofECC Chapter 5.30 only during the hours of 7:00amto 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. • Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance ofthis permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance not limit in any way the City's ability to enforce any ordinance provision. INSPECTIONS • E-Sanitary Side Sewer Inspection PARTIAL INSPECTION DATE: INITIAL: NOTES: PARTIAL INSPECTION DATE: INITIAL: NOTES: FINAL INSPECTION APPROVED DATE: INITIAL: