Loading...
SIGNED SPECIAL INSPECTION AGREEMENT AMENDED.pdfOTY ^ � �. Nip * Ho SPECIAL INSPECTION AND TESTING AGREEMENT Permit#: �L--�s ZD/S-/S�q ' /&07 1. ►-7 I3�7Z S teg f a e i R®c�ia\'.) •��. � Project: Prior to issuance of a permit, this form must be completed in its entirety and returned to the City for approval The completed form must have signatures of acknowledgment by all parties. DUTIES AND RESPONSIBILTI'IES .M Inspection firm o The Special pec f�work "willrform special inspection for the following typerate forms must be submitted if more than one firm is to be employed): ROCK R a Site Grading/Erosion Control a Soldier Pile Wall Auger Cast Piles 0 Pipe Piles Structural Fill a Permanent Erosion Control All individual inspectors to be employed on this project will be WASO certified for the type of work they are to inspect. if inspection is for work that is not covered by the WA130 categories, or the inspector is not WAI O certified, a detailed resume of the inspector and firm must be submitted. The resume must show that the inspector and the firm are qualified by education and experience to perform the work, and testing required by the project design and specifications. The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions and addenda sheets will not be used for inspection, unless they have been approved by the City. Inspection records shall include: A daily record to be maintained on site, itemizing the inspections performed. Any nonconforming work shall be brought to the immediate attention of the contractor for resolution. A weekly report shall be submitted to the City, detailing the inspections and testing performed, listing any nonconforming work and resolution of nonconforming items. A final report shall be submitted to the building department prior to the Certificate of Occupancy being issued. This report will indicate that inspection and testing was completed ill conformance with the approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must be detailed in the final report. C arl r^gtM The contractor shall provide the special inspector or agency adequate notification of work requiring inspection. The City approved plan and specifications must be made available, at the Jobsite for the use of the special inspector and the City inspector. The contractor shall maintain all daily inspection reports, on site, for review by all parties. 11EDMSVR•DEP7'FS%Buildin&andouts Information by ChucMinspectionsbpecial inspection and testing agreement C06. MIJI12016 'rho special inspection functions are considered to be in addition to the normal inspections performed by the, City and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be poured or other work, covered until approval is given by the City inspector. Buildfis g Ragarimewt o The building department shall review any revisions and addenda, The, City inspector will monit r the a special inspection functions for compliance with the agreement and the approved plans. The City inspector shall be responsible for approving various stages of construction to be covered and for work to proceed. t5!e!Mg1neer will clearly indicate on the plans and specifications the specific types of special inspection required and, shall include a schedule for inspection and tasting. 'rho architect and/or engineer will coordinate their revision and addenda process in such a way as to ensure that all required City approvals are obtained, prior to work shown on the revisions being performed in the field. Owner: The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or agency. ENFORCEMENT A failure of the, special inspector or firm to perform in keeping with, the requirements Of the IBC, the approved plans and this document, may void this agreement and the Building Official's approval of the special inspector. In such a case, a now special inspector, and/or firm would need to be proposed for approval. A failure of the design and/or construction parties to perforin in accordance with this agreement may result in a STOP WORK notice being posted on the project until nonconforming items have been resolved. ACKNOWLEDGMENTS I have read and agree to comply with the terms and conditions of agreement. Owner: Signature l Date 4�4L Contractor: Signature,__.Date: -Y/VJ4 Arch./Eng:nature U— Date: fAi/—/kp �- NJ A ' Special Insp, f k pature—Date: 1 Special Insp. Agency ACCEPT ORTHECIIN-Y 'EDMONDS BUILDING DEPT. Date: By: 7= xe� 11F,DMSYR-DEP'rFS\Buildin&Ui"Out3 10OFMAtion by ChucMinspec-don3\3pecial inspc0ion and testing agreamont CIDEAUC&U2016