SITE107053997.pdf
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
6-21-176-22-17
DATE
1/4
..PAGE
SAP Sup Order Nbr
Drawing Number
POINT EDWARDS OWNERS ASSOCIATION (C/O PACIFIC RIM INVEST & MGMT)CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG
107053997 EDMONDS
107053997
N
office
425-691-7573425-424-6549425-748-6345425-691-7573N/AN/AN/A
PHONE NO
PURGE POINTS AND PRESSURE TAPS TO BE INSTALLED PER PSE GAS OPERATING STANDARDS 2525.3300, AND 2525.1200.
1"=20'
MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300 AND 2525.3400.
NOTIFY PROPERTY OWNERS ADJACENT TO PROPOSED CONSTRUCTION ACTIVITIES A MINIMUM OF TWO WORKING DAYSTO PREVENT ACCIDENTAL OVERPRESSURE OF ADJOINING SYSTEMS, NO TWO MAINS SHALL BE CONNECTED
EXCEPT AS
EROSION AND SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY
425-673-0616
INSTALL MAIN VALVES OUT OF TRAFFIC WHERE POSSIBLE. VALVE MARKERS SHALL BE INSTALLED AND RECORDED BY Owner / Developer Contact Info
For contacts below dial 1-888-CALL PSE (225-5773)
PIPELINE MARKERS AND WARNING SIGNS SHALL BE INSTALLED AND RECORDED BY THE CONTRACTOR PER PSE GAS
PERMIT
NOT READILY ACCESSIBLE, AND FOR ALL VALVES WHERE PERSISTENT SNOWFALL MAY OBSCURE THE VALVE BOX.
SCALE
DELIVER FLYERS BE SURE TO INCLUDE THE LIST OF FREQUENTLY ASKED QUESTIONS AND INFORMATION ABOUT
PER GAS OPERATING STANDARD 2550.1600. ALLOW ADEQUATE TIME FOR CUSTOMER DECISION AND RESPONSE.
ANY CHANGE IN ROUTE, PIPE SIZE/TYPE, TIE-IN METHOD OR ADDITIONAL MAIN FOOTAGE MUST BE APPROVED BY
EXCESS FLOW VALVE TO BE INSTALLED ON ALL NEW RESIDENTIAL SERVICES PER GOS 2500.2200. (RECORD ALL
FIELD LOCATE ALL UNDERGROUND UTILITIES. EXCAVATOR TO CALL "ONE-CALL" TWO WORKING DAYS PRIOR TOTHE OPPORTUNITY TO PURCHASE AN EXCESS FLOW VALVE WHEN THEIR SERVICE IS INSTALLED OR REPLACED
COMPLETE "PIPE CONDITION REPORT" ON ALL METALLIC PSE FACILITIES. CHECK BOX ON REPORT FOR WIRE
THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2600 FOR ALL HP VALVES IF THE LOCATION IS
ALL CONSTRUCTION IS TO CONFORM TO PSE GAS OPERATING STANDARDS AND GAS FIELD PROCEDURES.
SHOWN ON THIS DESIGN UNLESS APPROVED BY APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE.NOTE ALL ACTUAL FOOTAGE, LOCATION AND MATERIAL CHANGES ON THE AS-BUILT IN RED. ( ') DENOTES
PRIOR TO BEGINNING CONSTRUCTION. USE iSi TO DISTRIBUTE FLYERS IF JOB IS LARGE, OTHERWISE HAND
G.VUKOSAV
K.WILLIAMSK.WILLIAMS
STANDARD GAS CONSTRUCTION NOTES:CONTACT
J.MOSS
NOTIFY APPROPRIATE PERMITTING AGENCY PRIOR TO JOB START (SEE PERMIT REQUIREMENTS).
TO CONSTRUCTION, IN WESTERN WASHINGTON CALL: 1-800-424-5555. OR CALL NATIONWIDE: 811
EROSION AND SEDIMENT CONTROL AND ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
REAL ESTATE/EASEMENT
N/AN/AN/A
3109 FRANKLIN AVE E
RESTORE ALL DRIVEWAYS SUBJECT TO OPEN CUT TO ORIGINAL OR BETTER CONDITION.
SEATTLE, WA 98102
N/A
ROB HILL
Vicinity Map
PT EDWARDS BUILDING 10
PROJECT MGRAPPROVED BY
CP APPROVAL
JOINT FACILITIES ARRANGEMENTS
WORKCHECKED BY
ENGR - GAS
GAUGE AND MONITOR USE OF ALL STOPPERS TO ENSURE ADEQUATE FEED.
SITE
DRAWN BY
FUNCTION 50 PINE ST, EDMONDS, WA 98020
2" MPE IP MAIN EXTENSION
16. IF METALLIC PIPE IS INVOLVED, COORDINATE INSTALLATION WITH CP TECH.MAPPING
ATTN:
N/A
___________________________, PHONE______________.
Manufacturer
THE APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE.
TESTED BYTESTED BY
WATERWATER
N/AN/AN/A
107053997106322996
SYSTEM MAOP DENOTED BY: SYSTEM MAOP = ___ PSIG
CSPBTGPM
Order #164.064
GAS WK CTR
TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928
45
NITROGENNITROGEN
PLAT MAP
Act Lgth
GAS MAIN INSTALLATION/RETIREMENT
---------
FF
GAS MAIN PRESSURE & TESTING
45
PP
DESCRIPTION
OPERATING STANDARD 2525.2500.
Est Length
BOX (TEST LEAD) INSTALLATION.
132'
FOOTAGE BETWEEN FITTINGS.
TEST RESULTSTEST RESULTS
INFORMATION ON D-4 CARD)
START TIMESTART TIME
AIRSTOP TIMEAIRSTOP TIMESYS MAOP
N/AN/AN/A
164.062
Notification #
Yes NoYes No
Project Manager Contact Information:
5
504366233504494888
Emer Sect
kevin.williams@pse.com
Type
MPE
OP MAP
BY
KEVIN WILLIAMS
---------
SOAPSOAP
/ / / / / / / /
425-691-7573
Pipe Size
60CONTACTPHONE#
UTILITIES
Service/MeterService/MeterService/MeterService/Meter
SAP Superior
Dis. Reg. / FT
DATE
2"HP Svc/MSA
Ind. ServicePSE
Retirement
"Flagging Required"
"Locates Required"
PROJECT PHASE
NW 26-27-03
SNOHOMISH
Ind. MSA
Relocate
10.11.12.13.14.15.17.DESIGN PRESS
18.DESIGNED BY
1.2.3.4.5.6.7.8.9.
Type/Work
TYPE TESTTYPE TESTPRESSURE
PRESSURE
INSTALL
2023 03/10
DATE OFFDATE OFF
Cell Phone:
DATE ONDATE ON
REV#
Manager:COUNTY
1/4 SEC
1
32
E-Mail:
GAS
LENGTH
Completed post installation inspection per GOS 2525.1200 and 2525.2700.
(CHECK BOX TO CONFIRM COMPLETION)
Recorded all required information on the as-built per GOS 2500.1700.
Foreman's Name (printed) ___________________________________
Foreman's Signature________________________________________
Company: InfraSource Construction Date ______________
Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500
DEPTH
Reviewed and complied with all construction notes.
Left the work area in a clean and safe condition.
HOLE HOG TABLE
LOCATION
FITTER'S CHECKLIST
4680 06/11
STARTSTARTSTARTSTARTSTARTSTARTSTARTSTARTSTARTSTART
ENDENDENDENDENDENDENDENDENDEND
CALLOUT
BP10BP11BP12BP13BP14BP15BP16BP17BP18BP19BP20
BP1BP2BP3BP4BP5BP6BP7BP8BP9
Scale: NONE
TYP. UTIL. CROSSING SECTION
LEGEND
Scale: NONE
TIE-IN DETAIL
CLEARANCE
1' MIN.
2
1
B
FROM OTHER UTILITIES:
MINIMUM CLEARANCE
HORIZONTAL: 5'
VERTICAL: 1'
Scale: NONE
ROADWAY CROSS SECTION
1' MIN
2
A
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES 6-21-176-22-17
DATE
2/4
..PAGE
SAP Sup Order Nbr
Drawing Number
CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG
EDMONDS
107053997
425-691-7573425-424-6549425-748-6345425-691-7573N/AN/AN/A
PHONE NO
1"=20'
For contacts below dial 1-888-CALL PSE (225-5773)
PERMIT
SCALE
G.VUKOSAV
K.WILLIAMSK.WILLIAMS
CONTACT
J.MOSS
X
X
REAL ESTATE/EASEMENT
N/AN/AN/A
X
N/A
X
PT EDWARDS BUILDING 10
O
I
T
'
PROJECT MGRAPPROVED BY
A CP APPROVAL
5
P7
.
.JOINT FACILITIES ARRANGEMENTS
2
F CHECKED BY
.3
F1
X
ENGR - GAS
DRAWN BY
FUNCTION 50 PINE ST, EDMONDS, WA 98020
2" MPE IP MAIN EXTENSION
MAPPING
T O
I
T
'
A
5
X P
7 X
S.
.
2
F
.
3
F1
N/AN/AN/A
E
CSPBTGPM
N
164.064
I
X
P
GAS WK CTR
PLAT MAP
DESCRIPTION
X
X
X
N/AN/AN/A
164.062
Yes NoYes No
Project Manager Contact Information:
5
Emer Sect
kevin.williams@pse.com
OP MAP
BY
KEVIN WILLIAMS
425-691-7573
CONTACTPHONE#
UTILITIES
X DATE
PSE
"Flagging Required"
"Locates Required"
NW 26-27-03
SNOHOMISH
DESIGNED BY
Cell Phone:
REV#
Manager:COUNTY
1/4 SEC
1
32
E-Mail:
X
X
X
X
X
X
X
X
X
KEY FOR PITS
Y
A
W'
K5
7
L.
A2
3
W
1
.
F
.
F
O
I
T
'
A
5 X
P7
.
.
2
F
.3
F1
X
X
X
Y
'
R
5
T
7
N.
4
E
.6
F1
X
X
T
S
T
C
E
P
S
X
X
O
R
P
I
PE
21603
5
0
X
X
SCALE: 1" = 20'-0"
PLOT PLAN
X
X
B
O
I
T
'
A
5
P2
..
3
F
.
4
F1
T
6 S
P
9 M
T
C 6 S
P
9 M
C
d
y
2
d
y
2
d
y
2
O
I'
T5
X
A7
.
P
3
.5
F1
X
1
A
'
5'
5
.7
.
S
3
X.5
F
1
X
'
5
7'
7
.
.
S3
.5
F1
X
X
XX
X
X
XX
30'-40'
R
D
D
5'
N
A
)
L
H
W
G
L
I
P
H
h
t
7
1
1
(
TYP. UTIL. CROSSING SECTION
B
T
S
E
N
I
P
)
)
W
D
S
R
T
S
h
t
6
1
R CLEARANCE
2
(
D
1' MIN.
T
E
V
P
N
(
I
P
B
FROM OTHER UTILITIES:
MINIMUM CLEARANCE
HORIZONTAL: 5'
VERTICAL: 1'
2
P
1
E
I
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES 6-21-176-22-17
DATE
3/4
..PAGE
SAP Sup Order Nbr
Drawing Number
CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG
EDMONDS
107053997
425-691-7573425-424-6549425-748-6345425-691-7573N/AN/AN/A
PHONE NO
1"=20'
For contacts below dial 1-888-CALL PSE (225-5773)
PERMIT
SCALE
G.VUKOSAV
K.WILLIAMSK.WILLIAMS
CONTACT
J.MOSS
REAL ESTATE/EASEMENT
N/AN/AN/A
N/A
PT EDWARDS BUILDING 10
PROJECT MGRAPPROVED BY
CP APPROVAL
JOINT FACILITIES ARRANGEMENTS
CHECKED BY
ENGR - GAS
DRAWN BY
FUNCTION 50 PINE ST, EDMONDS, WA 98020
2" MPE IP MAIN EXTENSION
MAPPING
N/AN/AN/A
CSPBTGPM
164.064
GAS WK CTR
PLAT MAP
DESCRIPTION
N/AN/AN/A
164.062
Yes NoYes No
Project Manager Contact Information:
5
Emer Sect
kevin.williams@pse.com
OP MAP
BY
KEVIN WILLIAMS
425-691-7573
CONTACTPHONE#
UTILITIES
DATE
PSE
"Flagging Required"
"Locates Required"
NW 26-27-03
SNOHOMISH
DESIGNED BY
Cell Phone:
REV#
Manager:COUNTY
1/4 SEC
1
32
E-Mail:
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES 6-21-176-22-17
DATE
4/4
..PAGE
SAP Sup Order Nbr
Drawing Number
CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG
EDMONDS
107053997
425-691-7573425-424-6549425-748-6345425-691-7573N/AN/AN/A
PHONE NO
1"=20'
For contacts below dial 1-888-CALL PSE (225-5773)
PERMIT
SCALE
G.VUKOSAV
K.WILLIAMSK.WILLIAMS
CONTACT
J.MOSS
REAL ESTATE/EASEMENT
N/AN/AN/A
N/A
PT EDWARDS BUILDING 10
PROJECT MGRAPPROVED BY
CP APPROVAL
JOINT FACILITIES ARRANGEMENTS
CHECKED BY
ENGR - GAS
DRAWN BY
FUNCTION 50 PINE ST, EDMONDS, WA 98020
2" MPE IP MAIN EXTENSION
MAPPING
N/AN/AN/A
CSPBTGPM
164.064
GAS WK CTR
PLAT MAP
DESCRIPTION
N/AN/AN/A
164.062
Yes NoYes No
Project Manager Contact Information:
5
Emer Sect
kevin.williams@pse.com
OP MAP
BY
KEVIN WILLIAMS
425-691-7573
CONTACTPHONE#
UTILITIES
DATE
PSE
"Flagging Required"
"Locates Required"
NW 26-27-03
SNOHOMISH
DESIGNED BY
Cell Phone:
REV#
Manager:COUNTY
1/4 SEC
1
32
E-Mail:
SECTION 5-05 OF THE WSDOT/APWA SPECIFICATIONS.