SKMBT_C45008082016120.pdf10718104 0]
August 20, 2008
TO: Kevin Harrington, Shamrock Constructors
FROM: Steve Fisher, City of Edmonds Public Works, 425-771-0235
RE: Plan review for proposed trash enclosure and truck accessibility
#2008-0524 Shamrock Constructors, Inc., 220 W. Dayton St.
The proposed enclosure for ongoing trash collection satisfies the minimum requirements
for size and materials. The location and orientation of the enclosure on the plan also is
workable but dictates that collection trucks hack onto the property to service since they
are not allowed to back out onto Dayton Street.
The overlying issue centers on the safe access and maneuverability for trucks since the
backing would start at the train crossing at Dayton St. and keep the trucks in close
proximity to the track itself.
One solution could be a turn -around area situated south past the proposed new building or
the property may just be subject to limited service in order to decrease number of overall
truck visits. Let me know if you have any further comments.