Loading...
SM-08-22 Notice of Hearing Date and Request for Additional Info.pdfIh e. 1890 May 16, 2008 CITY OF EDMONDS 121 sTH AVENUE NORTH • EDMONDS, WA gB020 - (425) 771-0220 • FAX (425) 771-0221 Website: www.ci.edmondsma.us DEVELOPMENT SERVICES DEPARTMENT Planning • Building • Engineering Mr. Shawn Rafferty PKJB Architectural Group 603 Stewart Street, Suite 707 Seattle, WA 98101 GARY HAAKENSON MAYOR SUBJECT: NOTICE OF HEARING DATE FOR SHORELINE PERMIT (FILE NO. SM -2008-22) JACOBSEN'S MARINE, LOCATED AT 345 ADMIRAL WAY Dear Mr. Rafferty: Your application for a shoreline permit for a boat sales and repair shop (Jacobsen's Marine) located at 345 Admiral Way within the CW zone has been scheduled for a hearing at the date, time, and location listed below: Action: Shoreline Permit File Number: SM -2008-22 Date of Meeting_ ' Thursday, July 3, 2008 Time of Meeting: 3:00 PM (or as soon thereafter as possible) Place: To Be Determined (confirm with staff) Hearing Body: 1 Hearing Examiner Although your project has been scheduled for a hearing date, the following information will need to be submitted as soon as possible so that the date of your hearing is not delayed: 1. Fees: The City's $150 sign posting fee was not collected with the application submittal. Please submit this fee as soon as possible. 2.. Description of Use: Please provide a written description of the proposed use (i.e. how the boat sales and repair shop will function, hours of operation, etc.). 3. Building Area: Your application form states that the proposed building is 10,000 square feet; however, the first page of your plans (under the "Project Info" heading) states that the total proposed building area is 15,345 square feet and the total area is provided for the parking calculations as 10,350 square feet. Additionally, your SEPA checklist states that the building will be 13,000 square feet. Please specify which figure is correct and correct your plans accordingly. 4. Parkine: Pursuant to ECDC 17.50.020.0.1, "All new buildings or additions in the downtown business area shall provide parking at a flat rate of one parking stall for every 500 sq. ft. of gross floor area of building." Your current parking calculations state that 31 spaces are required in one location Incorporated August 11, 1890 Sister Citu - Hekinan_ Janan and that 21 spaces are required in another location (this appears to be due to the discrepancy discussed in the item above regarding the proposed building area). Additionally, your parking calculations state that 37 spaces are provided; however, I counted 21 spaces on your site plan (19 standard stalls and 2 accessible stalls). Please update the required parking spaces to reflect the correct building area and update the number of proposed stalls as necessary to meet the minimum parking requirements. 5. Gradin: The Environmental Checklist submitted with your Shoreline Permit application states that grading is "intended to aceed the site balance — no export or fill." Please provide an explanation of what this means. Does this mean that no cut or fill will be done, or that no material will be brought in to or removed from the site? If any cut or fill will be conducted, please provide the proposed quantities even if the material will remain on site. 6. Outdoor Storage: Will there be any outdoor storage (i.e. boats, equipment, etc.) with the proposed boat sales and repair shop? If so, please describe. Will any of the proposed parking stalls be utilized for outdoor storage? 7. Paving: It appears that the grey areas indicated on sheet C-1 of your plans are intended to be paved; however, please confirm if this is correct. 8. Shoreline: The response to Item #13.3.a.(2) of your SEPA checklist states that the building will stay outside of 200 feet of the shoreline and that minimum site works (sidewalks and landscaping) will be within 200 feet of the shoreline. However, based on sheet C-1 of your plans, it appears that a portion of the proposed building will be within 200 feet from the shoreline. Please explain. 9. Commercial Waterfront (CW) Zone: Have you thoroughly reviewed the Commercial Waterfront (CW) zoning regulations provided in ECDC 16.55 and confirmed that your proposed project will comply with these provisions? Please submit responses to the above items at your earliest convenience in order to avoid delay of your hearing date of July 3, 2008. Additionally, please be aware that your presence at the hearing is highly advisable. If an applicant or their representative is not present, the item may be moved to the end of the agenda. Items not reached by the end of the hearing will be continued to the following meeting's agenda. If you have any questions, please do not hesitate to contact me at (425) 771-0220, extension 1224. I look forward to working with you on this project. Sincerely, Jen Machuga Planner CC: File No. SM -2008-22 Mr. Greg Jacobsen 2412 NW Market Street Seattle, WA 98107 Port of Edmonds 336 Admiral Way Edmonds, WA 98020