Loading...
SM-08-60 & ADB-08-61 Request for Additional Info.pdf Page 1 of 2 BUILDING DIVISION COMMENTS Date:October 14, 2008 To:Jen Machuga, Planner From:Ann Bullis, Building Official Building Division comments for Edmonds Yacht Club Subject: SM-08-60, ADB-08-61 Site Address: 326 Admiral Way Edmonds Yacht Club In reviewing the above noted ADB/SM application for Edmonds Yacht Club, the Building Division has the following comments. A complete review will be done when the project is submitted for permit. 1.See Building Division Preapplication Comments for this project dated July 9, 2008. 2.The proposed project is adjacent to or in Zone AE on the National Flood Insurance Rate Map – Panel 1292 with an established base flood elevation of 8 feet. Compliance to the the provisions is required for flood resistant construction of the Internation Building Code, ASCE 24-05 and other adopted references. If the structure is located outside the boundary of the flood zone, this needs to be clearly shown on the plans. As part of the Building Permit Application, please include at minimum the following information: a.Survey stamped and signed by a State licensed Land Surveyor based on NGVD 1988 or 1927 showing the locaton of the structure in relation to the flood zone. b.On the site plan, elevation views and building sections, show that the finished floor of the building is at or one foot above the based flood elevation of 8 feet (ASCE 24-05 section 1.5.2). Show compliance to the International Building Code, ASCE 24-05 and other adopted references as applicable. c.We recommend that the building owner contact their insurance company to discuss the potential impact that the elevation of the finished lowest floor of the building has on their flood insurance rates. d.Flood elevation certificates, stamped and signed the surveyor, will be required: i.When the lowest floor is complete, and ii.Prior to final inspection by the City Building Inspector. Page 2 of 2 3.On all site, landscape and civil plans, distinguish between property lines and lease lines. 4.Based on the geotechnical report provided with this application, provide one additional set of building construction plans, site and civil plans at time of building permit application submittal for geotechnical consultant review. Peer review fees must be paid by the applicant.