Loading...
Soundview Pl - 19018_SFR_BLD20080123 Jeffries 2.doc City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning • Building • Engineering Plan Review Corrections Plan Check : Date: # 2008-0123 March 5, 2008 Project Name/Address: Jeffries/19018 Sound View Pl Contact Person/Address/Fax: Ben Jeffries 19018 Sound View Pl Edmonds, WA 98020 Reviewer: JoAnne ZulaufDivision:Engineering During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. Our handouts can be found online at the City of Edmonds web site www.ci.edmonds.wa.us under City Government/Development Services/Engineering Division. The 4/29/08 resubmittal did not respond to any of the Corrections below. Please review and resubmit information requested to continue review of your plans in a timely manner. Thank you. 1.Provide a thorough breakdown of the existing and proposed impervious surface on the site plan, for example;  Existing Impervious: Roof outline: xxxxx Year built: xxxx Driveway: xxxx xxxx Decks: xxxx xxxx Total: xxxxx  Proposed Impervious: Roof outline: xxxx Deck: xxx Walkway: xxx Total: xxx Please consult City of Edmonds Storm Water Management handout #E72 for information regarding what counts as impervious surface (i.e. pavers, gravel..). 2. It is not permitted to build structures over a city storm drain line. In order to build in the location indicated by the submitted plans, the storm drain pipe will need to be rerouted around the west side of the DATE MAILED/FAXED 6/28/2017 PAGE ____ 1 OF ___ 3 new structure. It will be required that a new utility easement be granted the City of Edmonds to access pipe for maintenance and repair. Please submit a site plan showing a proposed route with all relevant Engineering will be unable to invert and rim elevations, structures, ditch lines, etc. for review. continue to review your plans without a proposed storm drain route. 3.Please provide a full drainage plan. Handout #E72 Storm Water Management will explain the detention requirements for your property since you are adding over 2000sf of impervious surface after 1977. Please note that if you are adding over 5000sf after 1977 then your drainage plans will need to be Engineering will be unable to continue stamped and signed by a Washington State licensed engineer. to review your plans without a complete drainage plan. 4. Please provide a grading plan showing existing and proposed contours. Please indicate “bottom of Engineering will be unable to continue to review your plans without a footing” on your site plan. complete grading plan. 5.required Please review handout #B57 Plot Plan for all information on your site plan. There is an example checklistEngineering will be as well as a to use to make sure you get everything needed on your plans. unable to continue to review your plans without a complete site plan. 6. Please show all utilities on site plan i.e. water line from water meter to house, gas line from property line to house, side sewer from main to house, etc. 7. If intention is to use existing side sewer lateral then it would need to be TV’d by Public Works to determine if in good working condition. If intend to use any portion of the existing side sewer on private property then it is the owner’s responsibility to TV that line to determine if in good condition for use. 8.Clearly label all areas on site plan. For example, it is difficult to tell if the area between the garage and driveway is pavement/concrete area or something else. 9.If removing concrete area, walk, driveway, and stairs near existing house, please label “to be removed”. 10.Please add curb or brim of some kind on West and South sides of driveway area to prevent runoff. 11.Existing fence and gate shown on site plan are in the right of way. Please remove from right of way or apply for Encroachment Permit. Handout E#26 explains requirements for Encroachment permit application. This handout can be found on our website following the instructions above. 12.Please indicate that existing access from Water St. will be removed. 13.Erosion Control: a)How do you plan to access site for construction? Will existing driveway be used? If not, provide rock entrance per City of Edmonds standard detail E1.2 (All Standard Details can be accessed at our website using the instructions above). If using rock entrance please add detail to plans. b)Show location of filter fence on site. Add filter fence detail to plans, must conform to City of Edmonds standard detail E1.1. c)All catch basins must be protected. Add catch basin protection detail to plans, must conform to City of Edmonds standard detail E1.3. DATE MAILED/FAXED 6/28/2017 PAGE ____ 2 OF ___ 3 Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections. DATE MAILED/FAXED 6/28/2017 PAGE ____ 3 OF ___ 3