Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Special Insp and Testing Agreement.pdf
OPYRECEIVED ffilHEERINI"C i, 9,14i'?'t C JUL 112013 DEVELOPMENT SERVICES CTR. CITY OF EDMONDS CITY a s ENGINEERING SPECIAL a AND TESTINGMEEMENT a PERMIT # BLD20130460 DATE: 7/10/2013 PROJECT SITE ADDRESS;— 23320 HILHAAY99-___—__._ . PROJE CT NAME: COMMUNITY + ALT CENTER N SPECIAL INSPECTION AGENCY The Riley Gagu "One form must be completed by each Special Inspection Agency or Inspector. SPECIAL INSPECTIONS REQUIRED: Special inspections are required for this project, as applicable, in accordance with Title 18 Edmonds Community Development Code (ECDC). When required, the project must be installed/constricted per approved plans and specifications. The owner or the registered design professional in charge shall employ an independent testing/inspection agency/special inspector to perform required special inspections. The special inspector shall be a qualified person with competence for inspecting the specific type of construction or operation requiring special inspection. The owner, registered professional, contractor and special inspector/agency shall provide a special inspection report detailing compliance with approved plans and specifications directly to the Engineering Division. WORK RE, QURING SPECIAL INSPECTION: Special inspections will be required for the following categories of work: FOR SPECIFIC INFORMATION REGARDING REQUIRED SPECIAL INSPECTIONS SEE THE STATEMENT OF SPECIAL INSPECTION NOTED AS A CONDITION ON THE BUILDING PERMIT AND/OR ON THE APPROVED PLANS. © Road subgrade placement and compaction QX Pervious Pavement and Pervious Concrete Installation © Erosion and Sediment Control © Rain Garden Soil Mix and Plantings FX Detention Vault: * Cast in Place Concrete Soils BEFORE A PERMIT CAN BE ISSUED: The owner and contractor and special inspector shall complete this agreement and return to a Permit Coordinator prior to permit issuance, APPROVAL OF SPECIAL INSPECTORS: Each special inspector shall be approved by the Engineering Division prior to performing any duties or inspections. The credentials of the specific person performing the inspection shall be submitted. When applicable, the company performing inspections must be accredited by the American Association of State Highway and Transportation Officials (AASHTO) R18. Community Health Ceaatea b1d2013 460 ®Paa e I of 3 I. OBSE''Vice WORK The special inspector shall obsarve the site work for conformance with the approved (stamped) plans and specifications. Special inspections are to be performed as needed, to confirm that the work being completed meets specifications and approved pans. 2. REP®I: "ii' NONCONFORMING I`I'I;P43 The speciai inspector shall bring nor,-conf:)rmi i'- i' -.ms to the immediate attention of the contractor and engineer of record. The speciai inspector shall provide a report to the Engineering Division notifying of any items not resolved and/or not installed per the approved plans and specifications. Items not constnicted per the approved plans and specifications will result in a review of the plans to determine what requirements will be needed nor the project to meet tLe necessary stormwater requirements; such as removal and reco lst=uedon, ra-design of the stormwater management system(s), etc. Final approval for the project will not occur until. installation of all required improvements is complete and accepted by the Special Inspecto • and the City. 3. FINAL C®NSTRU i'IDN lx 1SPC; lr`"' The special inspector or inspection agency shall submit a final signed report or Certificate of Compliance to the City stating that all items requiring special inspection and testing were fulfilled and reported. The report shall also includa a statement fi•om die inspector stating to the best of his/her knowledge the project is in confonnance. with the approved plans, specifications, and approved plan revisions, if any. Items not in conformance, unresolved items or any discrepancies in inspection coverage (i.e., missed inspections, periodic inspection when continuous inspections were required, etc.) shall be specifically addressed in this report. B. Contractor onstt.lbnli d. NOTIFY THE SPECIAL INSPECTOR OF ALL REQUIII'ED SPECIAL INSPECTIONS It is the duty of the contractor to notify the special inspector when work is ready for special inspection. Note, the items listed under the statement of special inspection on the building permit and as noted on the approved plans and specifications are required to have special inspections. Adequate notice shall be provided by the contractor so that the special inspector has time to become familiar with the project. All work requiring special inspection niust be approved prior to concealing or covering said work. 2. PROVIDE ACCESS TO APPROVED PLANS The contractor is responsible for providing the special inspector access to approved plans at the jobsite. 3. I.IETAPIN SPECIAL, INSI'la+' CTION IZ{I!,CO I S The contractor is responsible to retain at the jobsite all special inspection records submitted by the special inspector. These records are to be provided to the City Engineering inspector upon request and upon completion of work. C. ':ntz�q l±ti tt ��Iitgive �__ Asi es Nyonsib llifies 3. APPROVE SPECIAL INSPECTION The Fngineering Division shall approve all Special Inspectors and special inspection requirements. 2. MONITOR SPECIAL INSPECTIONS AND APPROVE REIP®ItTS Cosi iunihyNonl0iLcutcr-1Al2OS3C4G4-i'%gc'bDQ Work requiring special inspection and performance of special inspectors shall be monitored by the Engineering Division Inspector. Engineering Inspector approval mist be obtained prior to placement of concrete or other similar activities in addition to that of the special inspector. 3. FINAL APPROVAL The Engineering Division may provide final inspection approval after the special inspectioi report(s) have been submitted and accepted by the City. A Owner Rel onsibiii des. 1. The project owner or the engineer or architect of record acting as the owner's agent shall fund special inspection services. E. Ott itteer r Architect of egor( lies �t�ttsibilities 1. Prepare Statement of Special Inspectiozis. 2. Review the special inspection reports and provide corrective action for work that may not conform to the approved plans. ACKNOWLEDGEMENTS X have read and agree to comply with the terms and conditions of this agreensent. ntoi- type �. Date 4 l General Contractor Company/Owner name _ Abbott Construction (please print or type) IV ` Date 07/1012013 Special Inspector /Agenq name oil Signatu Engineer of Record namealit-idles. P. l(owic I.E. for "�,p K0 Jljv tt `IGYI or lype) Signature Return the original signed agreement to: City of Edinonds Development Services Department 1215"' Avenue North, City Hall Second Floor Edmonds, WA 98020 City Official Signatu Titles Date. t Date to �?,/ ,» Date -7/1 / /-? avamorot pity V- palth Causes° - M20130460 -Page 3 of"