Loading...
Special Insp Report.pdf& ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERI��;,, CONSTRUCTION TESTING & INSPECTION FEB 12 2018 February 6; 2018 Mr. Douglas Spee (E-Mail) EDMONDS 2020, LLC 307 Bell Street Edmonds, WA 98020 RECE►V��«:; FEB 12 2019 DEVELOPMENT SERV,r,,- - COUNTER RE: CONSTRUCTION TESTING AND INSPECTION Post Office Phase 2 201 Main Street Edmonds, Washington Dear Mr. Spee, DEVELOPMENT SERVICP�, KA No. 096-17054 Permit No. BLD20160506 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. Jeffrey S. Mercer Operations Manager Pacific Northwest Division JSMAki CC: CITY OF EDMONDS 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 Willi Offices Serving the Western United States 09617054 DFR doc Page 1 of 1 QKmzm&Associates, Inc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection Field Report NO.: 09617054DFR222018JLG DATE: 2/2/2018 Set Count: CONTRACTOR: Edmonds 2020 LLC PROJECT #: 09617054 PERMIT #: BLD2016-056 PROJECT: Post Office INSPECTOR: Jerry L. Gelder LOCATION: 201 Main St Edmonds JURISDICTION: City of Edmonds KA P.M.: WEATHER: Overcast TEMP: 50 Arrived onsite per contractors request to observe the placing of concrete for Columns 6F.6, 7F.6, 6G.8, 611.8 and 711.8 Level 1 to 2. Observed contractor placing 5 c.y. of mix# 15LCD10. A slump and temperature test was performed and 1 set of compressive strength cylinders were made. See Report# 09617054CR222018JLG-1 for break results. Per contractors request observed the stressing of tendons for PT Deck Level 1. The field cure cylinders were picked up and taken to the lab. The cylinders were broken with the results meeting or exceeding the required 3000psi to stress. Per contractor the BLU-BRN banded tendons (12 @ 118') were not to be stressed due to a void behind the anchors on the live end. The tendons were stressed per plans and specs until one of the YEL — BRN banded tendons (12 @ 111') caused the concrete to break up and expose the anchors at the dead end. The 4 tendons starting from the east were stressed when the concrete broke up. The tendon was at approximately 3000psi when the concrete broke up. Stressing was stopped at approximately 1:00pm and contractor and Engineer of Record were contacted. Contractor elected to end stressing for the day at approximately 2:30pm when no answer was received from the Engineer of Record. Contractor will inform Krazan when the Engineer of Record informs them of a fix. r-� Reviewed By: ASTM Test #: Asset Number(s): To the best of my knowledge, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. Superintendent/Representative: Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 - Poulsbo (360) 598-2126 - Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Kr man & Associates This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal By signing this report, our inspector does not accept responsibility for validity of results The same information bas been provided by others on site