RE: CONSTRUCTION TESTING AND INSPECTION
Post Office Phase 2
201 Main Street
Edmonds, Washington
Dear Mr. Spee,
DEVELOPMENT SERVICP�,
KA No. 096-17054
Permit No. BLD20160506
In accordance with your request and authorization, our firm performed construction testing and inspection
for the above -referenced project. The sampling and testing was performed by our inspectors and reports
are included.
If you have any questions, or if we can be of further assistance, please do not hesitate to contact our
office.
Respectfully submitted,
KRAZAN & ASSOCIATES, INC.
Jeffrey S. Mercer
Operations Manager
Pacific Northwest Division
JSMAki
CC: CITY OF EDMONDS
4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837
Willi Offices Serving the Western United States
09617054 DFR doc
Page 1 of 1
QKmzm&Associates, Inc.
Geotechnical Engineering • Environmental Engineering
Construction Testing and Inspection
Field
Report NO.: 09617054DFR222018JLG
DATE: 2/2/2018 Set Count: CONTRACTOR: Edmonds 2020 LLC
PROJECT #: 09617054 PERMIT #: BLD2016-056
PROJECT: Post Office INSPECTOR: Jerry L. Gelder
LOCATION: 201 Main St Edmonds JURISDICTION: City of Edmonds
KA P.M.: WEATHER: Overcast TEMP: 50
Arrived onsite per contractors request to observe the placing of concrete for Columns 6F.6,
7F.6, 6G.8, 611.8 and 711.8 Level 1 to 2. Observed contractor placing 5 c.y. of mix# 15LCD10. A
slump and temperature test was performed and 1 set of compressive strength cylinders were made.
See Report# 09617054CR222018JLG-1 for break results.
Per contractors request observed the stressing of tendons for PT Deck Level 1. The field cure
cylinders were picked up and taken to the lab. The cylinders were broken with the results meeting or
exceeding the required 3000psi to stress. Per contractor the BLU-BRN banded tendons (12 @ 118')
were not to be stressed due to a void behind the anchors on the live end. The tendons were stressed per
plans and specs until one of the YEL — BRN banded tendons (12 @ 111') caused the concrete to break
up and expose the anchors at the dead end. The 4 tendons starting from the east were stressed when
the concrete broke up. The tendon was at approximately 3000psi when the concrete broke up.
Stressing was stopped at approximately 1:00pm and contractor and Engineer of Record were
contacted. Contractor elected to end stressing for the day at approximately 2:30pm when no answer
was received from the Engineer of Record. Contractor will inform Krazan when the Engineer of
Record informs them of a fix.
r-�
Reviewed By:
ASTM Test #:
Asset Number(s):
To the best of my knowledge, the above WAS performed in accordance with the approved plans, specifications and
regulatory requirements.
Superintendent/Representative:
Technician:
Offices Serving the Western United States
Lynnwood (425) 485-5519 - Poulsbo (360) 598-2126 - Tacoma (253) 939-2500
The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Kr man & Associates This report
indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal By signing this report, our inspector does not accept
responsibility for validity of results The same information bas been provided by others on site