Loading...
Special Insp report.pdf,%rJ- �295 SS SOUND STRUCTURAL SOLUTIONS A ,1 LNGINEERS August 7, 2018 , KAM- To: Hector Jauregui - LQH, Inc From: Ronald Skinner, PE Re: Knob Hill Lot #2 RE - Inspector comments ���, �(-.S,lt-'i::, SSS# s1705002 -The framing inspection yielded two comments for this office: (. U�,u}ar y.>�/�e"lt!(` _y^ -`i_ �:�� .FJ `r-�-->•rllbti_:%.� Z!+}��'^ } L'S.._It+ 9) the 2-2x12 collectors were left over from plan iterations before submittal to the city. They are not necessary. 10) The OSC connection in the Great Roorn is per plan, but the 8SC connection in the Kitchen was not able to be constructed as we detailed it because of the beam location. Attached is a calculation demonstrating the force to be resisted along with a method of providing the necessary capacity. if you have any questions or require additional information, please call. Attached: Roof Porch Anchorage 24113 5fi`h Ave HIV -[Mountlake Terrace, WA 98043 -Fah: 425-778-1023 - wmv.ssseng.com Pop- C-(-f ir4 IM 10 1 SOUND STRUCTURAL SOLUTIONS banE N G I N E E R S 5 / -/osvo 2- /140-TA -r v'O 3q �� So s S( C A C/ t 1 06- 67 ilh;425-778-1023 - www.ssseng.com