Special Insp Retaining Wall Report & Email.pdfRivera, Chris From: Henry Wright <Henry.Wright@earthsolutionsnw.com> Sent: Thursday, August 31, 2017 4:39 PM To: Rivera, Chris Cc: Leif Helleren Construction Inc; Rob Long Subject: 707 and 711 Main Street Attachments: 3710.02 DFR 12.pdf Hi Chris, We observed proper drainage installed for the continuous block wall installed along the south side of 707 and 711 Main Street. We documented the drainage for the wall in the attached field report. The field report states 707 Main Street but is applicable for both 707 and 711 as the wall is continuous across the properties. Let me know if you need anything else from us. Thanks, Henry T. Wright, P.E. Senior Project Engineer Earth Solutions NW, LLC 1805 — 136`" PI NE, Suite 201, Bellevue, WA 98005 Phone: 425-449-4704 Fax: 425-449-4711 Cell: 206-793-4193 Email: hcnry.wri ht ulearthsolutionsnw.com This e-mail is intended for the use of the individual to whom it is addressed and may contain information that is privileged, confidential or otherwise exempt from disclosure under applicable law. If the receiver of this e-mail is not the intended recipient or the employee or agent responsible for delivering the message to the intended recipient, you are hereby notified that any dissemination, distribution or copying of this communication is strictly prohibited. Earth Solutions NW«C Field Rep. SES 1805 1361h Place NE, FAX: Time On Site Suite 201 (425) 449-4711 Bellevue, WA 98005 TOLL FREE: 2:45 (425) 449-4704 (866) 366-8710 DAILY FIELD REPORT 75 nr Time Project Name Job Location 707 Main St. Utility 707 Main St. Edmonds, WA General Contractor General Contractor's Superintendent Grading Contractor Grading Foreman Are approved Plans/Permits onsite ® YES ❑ NO Project No. Project No. Page of Report No. 3710.02 1/1 12 Time Off Site Date Day of Week 3:00 5/4/17 Thursday Weather 50', overcast Client / Owner Leif Hellaran Construction Received Onsite By Checked By h Mr 7 Permit No. Test Reference Maximum Fill Test Dry % of Number Test Location Elevation Compaction Dry Density Moisture Density Maximum Curve lbs./cu,ft. % lbs./cu.ft. Dry Density Wall Backfill 9 South wall I" tier E side SG 2 121.1 10.89 115.1 95 10 1 South wall I" tier W side SG 2 121.1 1 10.66 115.3 95 As requested, ESNW representative was on site to observe wall construction: ESNW rep performed compaction testing on SG of 1 st tier block wall on southern site boundary. An 18" vertical section of washed drain rock was observed to be directly behind the wall face, with native materials being placed behind the drain rock. A perforated drain pipe was observed to be installed at the base of the wall face, with drain pipe infiltrating into a sump drain. Synteen SF 55 geogrid was observed to be installed behind the wall face. ESNW rep performed compaction testing on backfilled soils, and observed them to be adequately compacted to at least 95% of the modified proctor at the locations tested. ESNW will return as requested. Sam Suruda Technician 206-960-9592 COPY TO: — Synteen SF 55 geogrid observed behind wall. CONTINUED ON NEXT PAGE ❑