Loading...
Special Inspection Form.pdfContractor: The contractor shall provide the special inspector or agency adequate notification of work requiring inspection. The City approved plan and specifications must be made available, at the jobsile for the use of the special inspector and the City inspector, The contractor shall maintain all daily inspection reports, on site, for review by all parties. The special inspection functions are considered to be in addition to the normal inspections performed by the City and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be poured or other work covered until approval is given by the City inspector. Building Department: The building department shall review any revisions and addenda. The City inspector will monitor the special inspection functions for compliance with the agreement and the approved plans. The City inspector shall be responsible for approving various stages of construction to be covered and for work to proceed. Design Professionals: The architect and/or engineer will clearly indicate on the plans and specifications the specific types of special inspection required and shall include a schedule for inspection and testing. The architect and/or engineer will coordinate their revision and addenda process in such a way as to ensure that all required City approvals are obtained, prior to work shown on the revisions being performed in the field. Owner: The project owner, or tiie architect or engineer acting as the owners agent, shall employ the special inspector or agency. ENFORCEMENT A failure of the special inspector or firm to perform in keeping with the requirements of the IBC, the approved plans and this document, may void this agreement and the Building Official's approval of the special inspector. In such a case a new special inspector and/or firm would need to be proposed for approval. A failure of the design and/or construction parties to perform in accordance with this agreement may result in a STOP WORK notice being posted on the project until nonconforming items have been resolved. ACKNOWLEDGMENTS 1 have read and agree to comply with the terms and conditiopss of this a Owner: Contractor: Mike Rinehart Signature G ate 3It9 Signature Date: 3/20/19 Arch./Eng: FAC SYSTEMS INC. Signature' Date: 3/19/2019 Special Insp. ,f_±_:�dcf-4�— Signature Date -�D-2_a-3�c Special Insp. Agency ee/t-i ACCEPTED FOR THE CITY OF EDMONDS BUILDING DIVISION 0 Date: \\edm%'r-userrs\userprotS\ecancr\Desktop\2019-0?54 BAER Special Insp Testing Agreement (unsigned).doc3/18/2019 Scanned by CamSeanner