Loading...
Special inspection form-vault-pln20070021-ESNW.pdf SPECIAL INSPECTION AND TESTING AGREEMENT Permit #: _pln20070021___________________________________ Project: __Stonebridge Court 10-lot Plat_____________________ Prior tocommencing vault construction, this form must be completed in itsentiretyand returned to the City for approval. The completed form must have signatures of acknowledgment byall parties. DUTIES AND RESPONSIBILITIES Special Inspection Firm and Special Inspectors: The Special Inspection firm of __Earth Solutions NW, LLC_____________ will perform special inspection for the following types of work (separate forms must be submitted if more than one firm is to be employed): Reinforced ConcreteSpray applied Fireproofing Bolting in ConcreteSmoke Control Systems Prestressed ConcreteLateral Wood ShotcreteStructural Observationby design professional Structural MasonryGrading/soils Structural Steel/WeldingOther _______________________________ High Strength BoltingOther _______________________________ All individual inspectors to be employed on this project will be WABO certified for the type of work they are to inspect. If inspection is for work that is not covered by the WABO categories, or the inspector is not WABO certified,a detailed resume of the inspector and firm must be submitted. The resume must show that the inspector and the firm are qualified by education and experience to perform the work and testing required by the project design and specifications. The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions and addenda sheets will not be used for inspection, unless they have been approved by the City. Inspection recordsshall include: A daily record tobe maintained on site, itemizing the inspections performed. Any nonconforming work shall be brought to the immediate attention of the contractor for resolution. A weekly report shall be submitted to the City; detailing the inspections and testing performed, listing any nonconforming work and resolution of nonconforming items. A final report shall be submitted to the building department prior to the Certificate of Occupancy being issued. This report will indicate that inspection and testing was completed in conformance with the approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must be detailed in the final report. F:\\Projects\\Stonebridge Court\\Plans-Civils\\Land\\Final Engineering\\Approved\\pln20070021-Special inspection form-vault.doc8/9/2012