Loading...
Special Inspection Report - Infiltration Rec'd 3.18.19.pdfLIU & ASSOCIATES, INC. Geotechnical Engineering Engineering Geology Earth Science March 15, 2019 Mr. Jacob Lyon 320 Dayton Street, Suite 108 Edmonds, WA 98020 Dear Mr. Lyon: Subject: Infiltration Trenches Final Inspection Report Brackett's Corner 801 Avenue W and 2121h Street SW Edmonds, Washington L&A Job No. 15-058 At your request we provided construction inspection services for infiltration trench systems of the subject project. We observed cut bank stability of infiltration trenches, verified types of soils at bottom of trenches, watched lining of trenches with non -woven filter fabric, examined washed gravel used to backfill trenches, and observed installation of outflow perforated PVC pipes embedded in gravel backfill. It is our opinion that the stormwater infiltration trench construction work we were requested to inspect were acceptable. Please feel free to contact us if you have questions. Yours very truly, LIU & ASSOCIATES, INC. J. S. (Julian) Liu, Ph.D., P.E. Principal 19213 Kenlake Place NE - Kenmore, Washington 98028 Phone (425) 483-9134 - Fax (425) 48.6-2746