Loading...
Special inspection report.pdfWEST CPAST STRUCTURAL ENGINEERING, INC. Pacific Garages Subject: Ricker Garage Foundation 23303 100th Ave W Edmonds, WA 98020 9540 Semiahmoo Parkway (425) 347-8998 #137 wcse.net Blaine, WA 98230 ZLO'26 to Oct c*Z This letter is a follow up to out conversations regarding the foundation for the Ricker Garage. It is our understanding that you used the same detail to construct this project as was used on the Abrahamson project (WCSE project no: W4448) as it has a similar layout. Raw (Nor , _.. .-. I! 01. saw TOW • 1. NMinur . un 1 >{O. R10hL Mo EI,Nat'em The ricker project has 1 high corner, retaining 8 ft of soil. It then slopes down from there to 4 ft or less. It is our understanding that the walls are formed and ready to be poured, however, the dimension between steel reinforcing and face of wall is 2-3/4" rather than the specified 2" in the foundation detail. Soil Properties: Active (pcf) 30 Passive (pcf) 300 Surcharge (psf) 35 Bearing (psf) 2000 Friction (f) 0.35 Density (pcf) 120 Project: W4521 Sheet No: 1 9/13/2018 WEST COAST STRUCTURAL ENGINEERING. INC. Concrete Properties: Weight (pcf) 150 f'c (psi) 2500 Reinforcing Steel: #4 & smaller (ksi) 40 #5 & larger (ksi) 60 Desc. Size Spacing (in) V Bars 4 12 H Bars 4 12 9540 Semiahmoo Parkway (425) 347-8998 #137 wcse.net Blaine, WA 98230 Retainina Wall Geometry A (ft) I B (in) C (ft) D (ft) E (in) F (in) G (in) H (ft) 0.33 8 0.33 1.33 0 8 0 8.00 Sliding: SV (active) = 827 plf (slab) SV (active) = 413 plf Resisting Forces Description Weight (lb) Resistance (lb) Passive (lb) Footing 133 47 Stemwall 800 280 Soil over Heel 320 112 Soil over Toe 0 0 Lug 0 0 Slab 300 Total 1253 439 975 SV (resisting) = 1414 plf sliding safety factor = 1.71 Bending: (lb-ft) factor factored moment (k-ft) M (stemwall base) = 983 1.6 1.57 As = 0.196 (inz/ft) SRF (f) = 0.9 fy = 40000 (psi) d = 5 (B-3) b= 12 M (allowed) = 34.2 (k-in) = 2.85 (k-ft) Min. Reinforcing: As min ratio As (min). fy V = 40000 V bars 0.196 0.002 0.192 ok fy H = 40000 H bars 0.196 0.002 0.192 ok Results: S.F. Sliding: 1.71 ok Strength: 1.81 ok Project: W4521 Sheet No: 2 9/13/2018 WEST COAST S TRUCTURAL 9540 Semiahmoo Parkway (425) 347-8998 #137 wcse.net Blaine, WA 98230 In this case, I looked at the concrete wall strength with a 3-inch spacing rather than a 2 inch. The wall is still adequate in strength to handle the design load. TRUSSES . II• PER PLANS I!� SIMPSON A35 AT c EACH SIDE OFTRUSS TO SILL FOR WALL BRACING e #4 HORIZONTAL BARS @ 12" O.C. OUTSIDE FACE VERTICAL BAR UP TO 3" IS OK FOR THIS PROJECT "INSIIEFIIE Ij��/ 1LL PLAN VIEW #4 VERTICAL BARS CD 12" O.C. PLACE 2" CLR FROM INSIDE FACE OF WALL NOTE: ROOF FRAMING, SHEATHING. ALL FOUNDATION WALLS & FLOOR TO BE IN PLACE PRIOR TO BACKFIL PLACEMENT. #4 VERTICAL DOWELS , e 26" MATCH SPACING W/ VERTICAL WALL REINF MIN. 42 BAR 0 LAP e" e CONCRETE SLAB & REINFORCING PER FOUNDATION PLAN • e 9-13-18 Travis McCandless PE, SE West Coast Structural Engineering Inc. P.T. 2x6 MUD SILL PLATE W/1/2" 0 x 10" A.B. AT 18" O.C. & 12" FROM END OF EACH MEMBER. (2) #4 TOP BARS �I �FINISHED GRADE FREE -DRAINING GRANULAR MATERIAL 12 WIDE MIN. TO WITHIN 12" OF FINISHED GRADE WATERPROOF MEMBRANE RIGID INSULATION 4" PERFORATED AS REOD AROUND FOOTING DRAIN PERIMETER OF SURROUND W/ GRAVEL LIVING SPACE BRACED RETAINING WALL SCALE: 3/4" = V-0" Project: W4521 Sheet No: 3 9/13/2018