Loading...
Special Inspection Soils Starbucks.pdfOV Hok- SPECIAL INSPECTION AND TESTING AGRE EMENT .9t. 1894 Permit M, IWZ) U/4 Projech ? &__ Prior to Issaftisce of a permit, 11sisloom mast be completed fts Its enfirety andretarMed to the City for approval. Nodal JURLe "lonrin and Snecial 1n actors: The Special Inspection fli-in of Otto RPsenau & Assoc., Inc. will perform special inspection for the following typos of work (separate forms must be submitted if more than one firm if; to be employed): —Roinfore-ed Concrete —Bolting In Concrete —Prestressed Concrete —Shoterote —Structural Masonry —Straotural Steel/Welding ---Ptgh Strength Bolting —Spray applied Fireproofing —Smoke Control Systems —Latoral Wood —Structural Observation by design professional _XGrading/soils —other All Individual inspectors -to be employed on this project will he WADO ortiflod fortho typo of work they are to Inspect, If Inspection Is for work that is not covered by the WABO categories, or the Inspector it; not WABO cortifled, it detailed resume of the hispPotor and firm must be submitted. The mume must show that the inspector and the firm are qualified by education and experience to perform the work and testing required by the project design and opeoifloit0ons. The work shall be Inspected for coMbrinatice with the plans and specifications approved by the City. ftvislons and addenda sheets will not be used for inspection, unless they have been approved by the Clty, Inspection records shall Include., A daily r000rd to be maintained on sIto, Itemizing the inspections performed. Any nonconforming work shall be brought to the Immediate attention on of the contractor for, resolution. A weekly report shall be submitted to the City; detailing the inspections slid testing performed, listing any nonconforming work and resolution of nonconforming items. A final report shall be submitted to the building dopatiment prior to the Certificate of Occupancy being Issued, This report will indicate that hispootion and testing was completed In conformwice with the approved plaps,speofflications And approved revisions or addends. Any unresolved disorepawles must be detailed in the final report, hispollon ibm.6911/20/2014 Q A ka- Am, The contractor shall provide the special inspector or agency adequate, notification of work requiring inspection. The City approved plan and specifications must be made available, at the jobsite for the use of the special inspector and the City inspector. The contractor shall maintain all daily inspection reports, on site, for review by all patties, The special inspection functions are considered to be In addition to the normal inspections performed by the City and the contractor is responsible for contacting the City to schedule regular Impeotions. No concrete shall be poured or other work covered until approval is given by the City inspector, AddWtReAnAmoft. The building department shall review any revisions and addenda, The City inspector will monitor the special inspection functions for oompliance with the agreement and the approved plans. The City inspector shall be responsible for approving various stages of construction to be covered and for work to proceed, The architect and/or engineer will clearly Indicate on the plans and specifications the specific types of special Inspection required and shall Include a schedule for Inspection and testing. The architect and/or engineer will coordinate their revision and addenda process in such a way as to ensure that all required City approvals are obtained, prior to wort( shown on the revisions being performed in the field. Pommel The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or agency - RN --M* �'V— A fulluro of the special inspector or firm to perform In keeping with the requirements of the IBC, the approved plans and this document, may void this agreement and the Building Offloial's approval of the special inspector, in such a case a now speolal inspector and/or firm would need W be proposed for approval. A failure of the design and/or construction parties to perform in accordance with this agreement may result in a STOP WORK notice being posted on the project until nonconforming items have been resolved, ACKNOWLEDGMENTS < . I have read and agree to comply with the terms and conditions this agreement, 'W"'t' conditions Owner: Robert Baldwin I Starbucks Coffee Signature Elate WC (ArO %A Ip Contractor: A- Signature Date: Arch,/Eng- Edc V. RamaIng Signature atell 1/22/15 ;0 /,4,1- SpBolat InspA"Ve Special Insp, Agenexv�p ACCEPTED FOR THE CnY OF EDMONDS BUILDING DEPT. By: Date: Mulldhig New Folder 201(hPoinifteolal 1115poodoll forin.doolllt2012014