Special Inspection Structural Starbucks.pdfOf UbAr0
SPECIAL INSPECTION AND TESTING AGREEMENT
Permits #0
ProJect:
Prior to issuance of a permit' this form must be completed in its entirely and returned to the Ctly for
approval. The completed form must have signatures of acknowledgmeni by rillparties.
DVTM AND RESPONSMILMS
Mpeclal YnHwAon firm and Special Inspectors
The Special Inspection film of . Otto Rosenau & Assoo., Inc. will perform speoiat
Inspection for the following types.of work (separate forms must be submitted if more than one firm is to be
employed):
XRoinforced Concrete , ___Spray applied Fireproofing
•Bolting in Concrete
Prestressed Concrete
—Shotcrets
')�_Structutal Masonry
,LStrucfural Steel/Welding
High Strength Bolting ,
,Smoke Control Systems
,Lateral Wood
®Structural Observation by design professional
_ Grading/soils
•`Other ed((
Other
All individual Inspectors to be employed on this projeot will be WABO certified for the type of wont they are to
inspect, If inspection is for work that Is not covered by the WABO categories, or the inspector is not WABO
certified, a detailed resume of the Inspector and firm must be submitted. The resume must show that the
inspector and the firm are qualified by education and experience to perform the worts and testing required by the
project design and specifications.
The work shall be inspected for confarmanoe with the plans and speoifications approved by the City. Revisions
and addenda sheets will not be used'for inspection, unless they have been approved by the City. Inspeotion
records shall includes
A daffy record to be maintained on site, Itemizing the inspections performed. Any nonconforming wont
shalt be brought to the immediate attention of the contractor for resolution.
A weekly report shall be submitted to the City; detailing the inspections and testing performed, listing
any nonconforming work and resolution of nonconforming items,
A final report shall be submitted to the building department prior to the Certificate of Occupancy being
issued. This report will Indicate that inspection and testing was completed In conformance with the
approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must
be detailed in the final report.
LADflUding Now Poldor 1010ftnws Speolnl )nspeollon rbrm.dool lW/2014
al °ac r
The contractor shall provide the special inspootor or agency adpquate notification of work requiring inspection.
The City approved plan and specifications must be made available, at the jobsite for the use of the special
inspector and the City inspector, The contractor shall maintain all daily inspection reports, on site, for review by
all parties,
The special inspection functions aro considered to be in addition to the normal Inspections performed by the City
and the contractor is responsible for oontaoting the City to schedule regular inspections, No concrete shall be
poured or other work covered until approval is given by the City inspector.
>lirdldina .I?epaxtaeents
The building department shall review any revisions and addenda. The City inspector will monitor the special
inspection functions for compliance with the agreement and the approved plans. The City Inspector shall be
responsible for approving various stages of construction to he covered and for work to proceed.
1iDesip proi'ess o a
The architect and/or engineer will clearly indicate on the plans and spocifications the specific types of special
inspection required and shall include a schedule for inspection and testing, The architeot and/or ongineor will
coordinate their revision and addenda process in such a way as to ensure that all required City approvals are
obtained, prior to work shown on the revisions being performed in the field.
CDrvuer: '
The project owner, or the architect or engineer acting as the owners agent, shell employ the special inspector or
agency.
A failure of the special inspector or firm to perform in keeping with the requirements of the IBC, the approved
plans and this document, may void this agreement and the Building Off'icial's approval of the special inspector.
In such a case a now special inspector and/or firm would need to be proposed for approval, A failure of the
design and/or construotion parties to perform in accordance with this agreement may result In a STOP WOR
notice being posted on the project until nonconforming items have boon :resolved.
I have read and agree to comply with the terms and conditions of this agreement
Owner: Robert Baldwin / Starbucks Coffee Signature
Contractor:
Eric V. Ramsing
Special
ACCEPTED FOR. THE CITY OF RDMONDS WILDING} MPT.
By;
L:leullding Now Voldor 2016Crorm Apeolol luspootlon 4bnn,dool N20/2014
Date:' °7
9/22/2016