Loading...
Special Inspection.pdf►3t.b xOtS0170 aZ& ASSOCIATES, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION April 26, 2018 Mr. Tony Collins (E-Mail) NORTH LIGHT CUSTOM BUILDERS LLC 914 164' Street SE, Suite B 12 Mill Creek, WA 98012 RE: CONSTRUCTION TESTING AND INSPECTION Longoria 8519 202" Street SW Edmonds, Washington Dear Mr. Collins, KA No. 096-18154 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. Ryman L. Mercer Project Manager Pacific Northwest Division RLWlkj CC: CITY OF EDMONDS 4303 19811 Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09618154 DFRdoc Page 1 of 1 42 Kmzan81Associates,Inc. Geotechnical Engineering* Environmental Engineering Construction Testing and Inspection Field Report NO.: 09618154DFR4202018EL DATE: 4/20/2018 Set Count: CONTRACTOR: North Light PROJECT #: 09618154 PERMIT #: BL0620180170 PROJECT: Longoria INSPECTOR: Edan Lewis LOCATION: 8519 - 202°d St SW JURISDICTION: Edmonds KA P.M.: JM WEATHER: Sunny TEMP: 50s Krazan representative arrived on site as requested for proprietary anchor inspection for the various different areas throughout the house. Upon arrival, contractor had drilled a total of 28 holes into the existing concrete for the placement of various different sizes of threaded rods. 18 — 5/8" diameter anchor bolts with 10" embedment was installed along the north wall of the building. 10 — epoxy anchors with #4 reinforcing steel and 4" embedment was installed into the existing foundation wall on the north side of the building for the foundation of the building extension. Simpson Strong Tie Set-XP epoxy grout was used for all the anchors installed today. Representative observed the cleaning out of the holes, the embedment depth and the placement of the epoxy grout and rebar. Anchors were installed per manufacturer and industry standards. Reviewed By: _ ASTM Test #: _Asset Numbe s)_ To the best of my knowledge, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. Stierintendent/Representative: Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use ofthe client. ThL4 reportmay not he reproduced in any format without the written permission of the client and rr = & Assuciates. This report incitcates our inspectors observation and toting results based on silo cond%ions and cmtrac for activities. TTis info nution is subird to —im prior to rim submittal. By signing this report, our impeotor ders not accept roporsibility for validlly 4—ulh Theoameinfa tsb hub=prmidedbvolhmr.mite.