Special Inspection.pdf'_9L17o% m- -os-it 4� Kf aZ & ASSOCIATES INC. GEOTECHNICAL ENGINEERING . ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION June .19, 2019 Mr. Mark Hann (E-Mail) HANN HOMES LLC PO Box 607 Woodinville, WA 98072 RE: CONSTRUCTION TESTING AND INSPECTION 72 W Townhomes 20818 72" d Ave W Edmonds, Washington Dear Mr. Hann, KA No. 096-19221 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of .further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. Christopher Congdon Project Manager Pacific Northwest Division CC/lkj 4303 198t° Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 Will' Offices Serving the Western United States 09619221 DFK doc Page 1 of 1 [(J'aZan & A s s o c i a t e s, Inc. Geotechnical Engineering • Environmental Engineering Construction Testing and Inspection Field Report NO.:09619221.DFR6142019ZZ DATE: 6/14/2019 Set Count: CONTRACTOR: Hann Homes PROJECT #: 09619221 PERMIT #: BL,D20180811 PROJECT: 72 W. Town Homes INSPECTOR: Zelalem Zerihun LOCATION: 20818 72id Ave W., Edmonds, WA JURISDICTION: City of Edmonds KA P.M.: Jeffrey- S. Mercer WEATHER: Clear TEMP: 70' F Krazan & Associates, Inc. special inspector visited the above -named project as per contractor's request and performed wood framing inspection for the entire structure — units A, B, and C. We reviewed structural drawings and identified shear walls that need special inspection as per EOR. Shear walls type 2, 3, and 4 were sheathed and fastened on all floors where spacified on plans as per schedule S-1, see exceptions below. Hold-downs on 11' floor, anchor bolts on first floor, floor -to -floor straps were done as per the schedule. Exceptions: 1) Shear wall type 4 on second floor of south elevation needs to be fastened at 2"OC with 8d (0. 1 48X2-1/2") as per plan. Currently nailed only at 4"OC. 2) Shear wall schedule called out LTP4 or A35 clips for bottom plate. As discussed with the contractor, LTP4 clips can be added between the beam and bottom plate thru OSB provided appropriate nailing size inorder to get minimum penetration. 3) Strapings are missing @ pefrorated shear walls where noted on plans. Contractor will need to add blockings behind and add straps type CS 16 as required per 9/S-6. 4) Replace missing anchors on L1 for the shear wall in the west end unit as per required spacing per schedule. Reviewed By: _ _ . ASTM Test #: Asset Number(s): To the best of my knowledge, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. Suneri Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 - Poulsbo (360) 598-2126 - Tacoma (253) 939-2500 Tina information provided on this report is prepared for tho exclusivo use of the clicm, Tins report may not be rcinad A in any format gtithout the written permission orthe clicatand Ammo & Associates This report indicates our irspemnm observation and testing results based on site conditions end conlradur activities. This infommaticn is subjmt to review prior to final submittal By signrne this report, our inspector does not accept responsibility for validity of results The same information has been provided by ellim on site Page 1 of 1 J<J eotechnical Engineering * Environmental Engineering Construction Testing and Inspection Field Report NO.: 09619221DFR6172019ZZ DATE: 6/17/2019 Set Count: CONTRACTOR: Hann Homes PROJECT #: 09619221 PERMIT #: BLD20180811 PROJECT: 72 W. Town Homes INSPECTOR: Zelalem Zerihun LOCATION: 20818 72°d Ave W., Edmonds, WA JURISDICTION: City of Edmonds KA P.M.: Jeffrey S. Mercer WEATHER: Clear TEMP: 70' F Krazan & Associates, Inc. special inspector re -visited the above -named project as per contractor's request and performed wood framing inspection for the remaining items as per previous Krazan report. 1) Shear wall type 4 on second floor of south elevation was now fastened at 2"OC with 8d (0.148X2-1/2") and acceptable as per the plan. 2) Contractor added LTP4 @ 12"OC between 2nd floor beam and bottom plate and met or exceeded shear wall schedule requirements. 3) CS 16 straps were added @ pefrorated shear walls where noted on plans and acceptable as per per 9/S-6. 4) Replaced a missing anchor for the shear wall in the west end unit on L1 and spaced as per schedule. Contractor used mechanical expanision bolt 5/8" dia. and 3X3X1/4 washer and installed with 7" embed as per plan. Reviewed B ASTM Test #: T i Asset Numbers To the best of my knowledge, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. Superintendent/Representative: Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 - Poulsbo (360) 598-2126 - Tacoma (253) 939-2500 11,e information provllkd on this ft1 rl is prepared for the eaclue lw use of flit clietu. fhe rcpon my tat be reproduced in any film it wilMml die mitten permi+sion of the client and Kralin & Assocwes. This rctcrt indicates uur inspnYon observa[ion ttrtd testing results based an+ih eonditiwt+urtd Contrxtor ochalia. Thisinfonnationissubjwlton,hww prior to final wbalittal. By signing this rgar6 our inspec%w does not wxcpt mpomibi lily for saltdity ormula. The+atne information has been provided by others on site.