Special Inspection-field report.pdfcivil & structural
ENGINEERING engineering & planning
STRUCTURAL OBSERVATION REPORT
Project: 72 West Townhomes
Purpose: Structural Observation
Location: 20818 72nd Ave W, Edmonds, WA
Date: August 8, 2019
Report: 3
CG Project: 19245.10
Client: Hann Homes
General Contractor: Hann Homes LLC
Field Rep: Morgan Kruse, PE
CG Engineering completed a site visit for the 72 West Townhomes project located in Edmonds, WA on
July 31, 2019 to assess the correction repairs as described in the Structural Observation Report #2 by CG Engineering
dated 07/29/19. Prior to our site visit, all wood framing had been erected and wall finishes had not yet been installed,
allowing us to observe all wood framing elements that were visible from the interior of the structure. Foundation
elements were below grade and were unobservable during our site visit.
While on site, the contractor (Hann Homes) was not present but we were able to complete our walkthrough to assess the
corrected items, To the best of our knowledge, the previous field corrections noted structural observation reports 1 & 2
have all been implemented and the construction that we observed was in accordance with the approved structural
drawings. Refer to photos 1-4.
Additional Corrections
After we had completed our final walkthroLlgh, the original engineer of record (Brian Russell) was on -site and had a few
additional corrections that were noted:
1. At the upper levels, some of the wall top plates break simultaneously. These locations should be strapped across
the top plate splice with a Simpson CS16 strap (16" each side of break and 3" long 10d or 16d nails). This
correction was completed and is acceptable.
2. Contractor is to confirm that the upper level gables were installed with Simpson A35 clips at the top plates.
Contractor supplied photos of the A35 clips. This is acceptable as installed,
3. Garage portal frames require a strap to be installed to the framing members above, each end of the portal frames.
'The portal frames had a strap welded directly to the frame on both ends and were connected to the framing above
with nails. This is acceptable as it was installed and does not require correction.
The additional corrections by the engineer of record above were implemented on 08/07/19. The framing appears to be in
general conformance with the approved structural drawings. Refer to photos 5-8.
z
ONAL 5 08/08/19
DISCLAIMER
This observation is the professional opinion of CG Engineering PLLC based on the information available during this assessment or evaluation. This report
does not warrantor guarantee that all conditions were discovered at the time of the observation. This report was prepared subject to the standard of care
applicable to professional services at the time the services were provided.
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph.425,778,8500 1 f.425,778.5536
www.cgengineering.com
72 West Townhomes
CG Project No. 19245.10
yyt
(t'lj
l 1
yl
_ 1•� t 1
y
�I
Photo 1: Triple blocking installed beneath column load
Photo 2: Uplift connection installed
C �
ENGINEERING
August 8, 2019
Page 2 of 5
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph.425.778.8500 1 f.425.778.5536
www.cgengineering.com
72 West Townhomes
CG Project No. 19245.10
i C
Photo 3: (3)-ply LVL installed beneath column load
Photo 4: (3)-ply LVL installed beneath column load
August 8, 2019
Page 3 of 5
250 4th Avenue South, Suite 200
C C Edmonds, WA 98020
ENGINEERING ph.425.778,8500 1 f.425.778.5536
www.cgengineering.com
72 West Townhomes
CG Project No. 19245.10
August 8, 2019
Page 4 of 5
& aqr
sow
U
�+ Q~�
�tlT Cza
�'✓
Photo 5: Simpson A35 and strap across top plate
Photo 6: Simpson A35 and strap across top plate
250 4th Avenue South, Suite 200
Edmonds, WA 98020
p ph.425.778,8500 1 f.425.778.5536
ENGINEERING www.cgengineering.com
72 West Townhomes
CG Project No. 19245.10
August 8, 2019
Page 5 of 5
Photo 7: Straps and LTP4s to framing above (portal frame straps can be seen behind the vertical straps.
Therefore the vertical straps were not needed)
_ x 7
r
Photo 8: Straps to framing above (portal frame straps can be seen behind the vertical straps. Therefore the
vertical straps were not needed)