Loading...
Special Inspection-field report.pdfcivil & structural ENGINEERING engineering & planning STRUCTURAL OBSERVATION REPORT Project: 72 West Townhomes Purpose: Structural Observation Location: 20818 72nd Ave W, Edmonds, WA Date: August 8, 2019 Report: 3 CG Project: 19245.10 Client: Hann Homes General Contractor: Hann Homes LLC Field Rep: Morgan Kruse, PE CG Engineering completed a site visit for the 72 West Townhomes project located in Edmonds, WA on July 31, 2019 to assess the correction repairs as described in the Structural Observation Report #2 by CG Engineering dated 07/29/19. Prior to our site visit, all wood framing had been erected and wall finishes had not yet been installed, allowing us to observe all wood framing elements that were visible from the interior of the structure. Foundation elements were below grade and were unobservable during our site visit. While on site, the contractor (Hann Homes) was not present but we were able to complete our walkthrough to assess the corrected items, To the best of our knowledge, the previous field corrections noted structural observation reports 1 & 2 have all been implemented and the construction that we observed was in accordance with the approved structural drawings. Refer to photos 1-4. Additional Corrections After we had completed our final walkthroLlgh, the original engineer of record (Brian Russell) was on -site and had a few additional corrections that were noted: 1. At the upper levels, some of the wall top plates break simultaneously. These locations should be strapped across the top plate splice with a Simpson CS16 strap (16" each side of break and 3" long 10d or 16d nails). This correction was completed and is acceptable. 2. Contractor is to confirm that the upper level gables were installed with Simpson A35 clips at the top plates. Contractor supplied photos of the A35 clips. This is acceptable as installed, 3. Garage portal frames require a strap to be installed to the framing members above, each end of the portal frames. 'The portal frames had a strap welded directly to the frame on both ends and were connected to the framing above with nails. This is acceptable as it was installed and does not require correction. The additional corrections by the engineer of record above were implemented on 08/07/19. The framing appears to be in general conformance with the approved structural drawings. Refer to photos 5-8. z ONAL 5 08/08/19 DISCLAIMER This observation is the professional opinion of CG Engineering PLLC based on the information available during this assessment or evaluation. This report does not warrantor guarantee that all conditions were discovered at the time of the observation. This report was prepared subject to the standard of care applicable to professional services at the time the services were provided. 250 4th Avenue South, Suite 200 Edmonds, WA 98020 ph.425,778,8500 1 f.425,778.5536 www.cgengineering.com 72 West Townhomes CG Project No. 19245.10 yyt (t'lj l 1 yl _ 1•� t 1 y �I Photo 1: Triple blocking installed beneath column load Photo 2: Uplift connection installed C � ENGINEERING August 8, 2019 Page 2 of 5 250 4th Avenue South, Suite 200 Edmonds, WA 98020 ph.425.778.8500 1 f.425.778.5536 www.cgengineering.com 72 West Townhomes CG Project No. 19245.10 i C Photo 3: (3)-ply LVL installed beneath column load Photo 4: (3)-ply LVL installed beneath column load August 8, 2019 Page 3 of 5 250 4th Avenue South, Suite 200 C C Edmonds, WA 98020 ENGINEERING ph.425.778,8500 1 f.425.778.5536 www.cgengineering.com 72 West Townhomes CG Project No. 19245.10 August 8, 2019 Page 4 of 5 & aqr sow U �+ Q~� �tlT Cza �'✓ Photo 5: Simpson A35 and strap across top plate Photo 6: Simpson A35 and strap across top plate 250 4th Avenue South, Suite 200 Edmonds, WA 98020 p ph.425.778,8500 1 f.425.778.5536 ENGINEERING www.cgengineering.com 72 West Townhomes CG Project No. 19245.10 August 8, 2019 Page 5 of 5 Photo 7: Straps and LTP4s to framing above (portal frame straps can be seen behind the vertical straps. Therefore the vertical straps were not needed) _ x 7 r Photo 8: Straps to framing above (portal frame straps can be seen behind the vertical straps. Therefore the vertical straps were not needed) C C ENGINEERING 250 4th Avenue South, Suite 200 Edmonds, WA 98020 ph.425.778,8500 1 f.425.778.5S36 www.cgengineLnng.com