SpecialInspectionAgreement-ENG-Liu.pdf CITY OF EDMONDS–ENGINEERING DIVISION SPECIAL INSPECTION AND TESTING AGREEMENT PERMIT #BLD20130190DATE:8/2/13 PROJECT SITE ADDRESS:17134 Talbot Rd PROJECT NAME:Chang –New SFR SPECIAL INSPECTION AGENCYGeotechnical Engineer –Liu & Associates *One form must be completed by each Special Inspection Agency or Inspector. SPECIAL INSPECTIONS REQUIRED: Special inspections are required for this project, as applicable,in accordance with Title 18 Edmonds Community Development Code (ECDC).When required,the projectmust be installed/constructed per approved plans and specifications. The owner or the registered design professional in charge shall employan independent testing/inspection agency/special inspectorto perform required special inspections.The special inspector shall be a qualified person with competence for inspectingthe specific type of construction or operation requiring special inspection. The owner, registered professional, contractor and special inspector/agency shall provide aspecial inspection report detailing compliance with approved plans and specificationsdirectly to the Engineering Division. WORK REQURING SPECIAL INSPECTION: Special inspections will be required for the following categories of work:FOR SPECIFIC INFORMATION REGARDING REQUIRED SPECIAL INSPECTIONS SEE THE STATEMENT OF SPECIAL INSPECTIONNOTED AS A CONDITION ON THE BUILDING PERMITAND/OR ON THE APPROVED PLANS. Erosion Control Drip Systems Raingardens BEFORE A PERMIT CAN BE ISSUED: The owner and contractor and special inspector shall complete this agreement and returnto a Permit Coordinator prior to permit issuance. APPROVAL OF SPECIAL INSPECTORS: Each special inspector shall be approved by the Engineering Division prior to performing any duties or inspections.The credentials of the specific person performing the inspection shall be submitted.When applicable, the company performing inspections must be accredited by the American Association of State Highway and Transportation Officials (AASHTO) R18. 13 Page of A.Duties and Responsibilities of the Special Inspector 1.OBSERVE WORK The special inspector shall observe the site work for conformance with the approved (stamped) plans and specifications. Special inspections are to be performed as needed,to confirm that the work being completed meets specifications and approved plans. 2.REPORT NONCONFORMING ITEMS The special inspector shall bring non-conforming items to the immediate attention of the contractorand engineer of record.The special inspector shall provide a report to the Engineering Division notifying of any items not resolved and/ornot installed per the approved plans and specifications. Items not constructed pertheapproved plans and specifications will result in a review of the plans to determine what requirements will be needed for the project to meet the necessary stormwater requirements; such as removaland reconstruction,re-design of the stormwater management system(s), etc. Final approval for the project will not occur until installation of all required improvements is complete and accepted by the Special Inspector and the City. 3.FINAL CONSTRUCTION REPORT The special inspector or inspection agency shall submit a final signed report or Certificate of Complianceto the City stating that all items requiring special inspection and testing were fulfilled and reported. The report shall also include a statement from the inspector stating to the best of his/her knowledge the project is in conformance with the approved plans,specifications, and approved plan revisions, if any.Items not in conformance, unresolved items or anydiscrepancies in inspection coverage(i.e., missed inspections, periodic inspection when continuous inspections were required, etc.) shall be specifically addressedin this report. B.Contractor Responsibilities 1.NOTIFY THE SPECIAL INSPECTOROF ALL REQUIRED SPECIAL INSPECTIONS It is the duty of the contractor to notify the special inspector when work is ready for special inspection. Note, the itemslisted under the statement of special inspection on the building permit andas noted on the approved plans and specifications are required to have special inspections. Adequate notice shall be provided by the contractor so that the special inspector has time to become familiar with the project.All work requiring special inspection must be approved prior to concealing or covering said work. 2.PROVIDE ACCESS TO APPROVED PLANS The contractor is responsible for providing the special inspector access to approved plans at the jobsite. 3.RETAIN SPECIAL INSPECTION RECORDS The contractor is responsible to retain at the jobsite all special inspection records submitted by the special inspector. These records are to be provided to the City Engineering inspector upon request and upon completion of work. C.City of Edmonds Engineering DivisionResponsibilities 1.APPROVE SPECIAL INSPECTION TheEngineeringDivision shallapprove all Special Inspectors and special inspection requirements. 23 Page of 2.MONITOR SPECIAL INSPECTIONS AND APPROVE REPORTS Work requiring special inspection and performance of special inspectors shall be monitored by the Engineering Division Inspector. Engineering Inspector approval must be obtained prior to placement of concrete or other similar activities in addition to that of the special inspector. 3.FINAL APPROVAL The Engineering Division may provide final inspectionapprovalafter the special inspection report(s)havebeensubmitted and acceptedby the City. D.Owner Responsibilities 1.The project owner or the engineer or architect of record acting as the owner’s agent shall fund special inspection services. E.Engineer or Architect of Record Responsibilities 1.Prepare Statement of Special Inspections. 2.Review the special inspection reports and provide corrective actionfor work that may not conform to the approved plans. ACKNOWLEDGEMENTS I have read and agree to comply with the terms and conditions of this agreement. Ownername (please print or type) SignatureDate General ContractorCompany/Owner name (please print or type) SignatureDate Special Inspector/Agency name (please print or type) SignatureDate Engineer of Record name (please print or type) SignatureDate Return the original signed agreement to: City of EdmondsDevelopment Services Department th 121 5Avenue North, City Hall Second Floor Edmonds, WA 98020 ACCEPTED BY CITY OF EDMONDS ENGINEERING DIVISION: City Official SignatureDate Title: 33 Page of