Loading...
StaffReport_S-2013-43_Swerk_+Attachments.pdf Swerk Short Plat File PLN20130043 a. Civil plans must be approved prior to recording. In completing the civil plans, you must address the following: i. Complete the Engineering Division conditions listed as “Required as a Condition of Subdivision” on (Attachment 7). ii. Civil plan sheets shall include an Engineering Division approval block. iii. Provide utility purveyor information. iv. Update General Notes to reference current codes/standard specifications. v. Include in the construction sequence the phasing of work and protection of areas where low impact development techniques will be used to meet stormwater management requirements. b. Make the following revisions to the short subdivision map: i. Add to the face of the map: “Conditions of approval must be met and can be found in the approval for the short subdivision located in File No. PLN20130043 at the City of Edmonds Planning Division Office.” ii. Include on the plat all required information, including the owner’s certification, hold harmless agreement, and Planning Division and Engineering Division staff’s approval blocks. iii. Remove or amend the references to the owner-imposed height limitations for Lot 2. This proposed view easement or covenant shouldbe recorded as a separate document(which may be referenced on the short plat map). c. Indicate on the Trees & Vegetation Plan (Attachment 17) how the required 30% native vegetation requirement can be met(see page 3, item B.1.a). d. Make sure all documents to be recorded meet the Snohomish County Auditor’s requirements for recording (including all signatures in black ink). e. Submit an updated copy of the title report (or short plat certificate– Attachment 11) with the documents proposed to be recorded. The title report must be prepared within 30 days of submittal for final review. f. Submit two copies of the documents to be recorded for the Planning Division and Engineering Division’s approval. Once approved, the documents must be recorded with the Snohomish County Auditor’s office. 3. After recording the short subdivision, the applicant must complete the following: a.three Provide the City of EdmondsPlanning Division with copies of the recorded map(with the recording number shown). The City will not consider the short subdivisionto have been completed until this is done. b. Complete the Engineering Division conditions listed under “Required as a Condition of Building Permit” (Attachment 7). Page 2of 11 Swerk Short Plat File PLN20130043 II.FINDINGS AND CONCLUSIONS A.GENERAL INFORMATION 1.Request: Tosubdivide one lot into two. 2.Review Process: Shortsubdivision application –a “Type II” administrative decision pursuant to ECDC Chapter 20.01. Planning staff reviews the project and issues an administrative decision called “preliminary approval.” Once preliminary approval has been granted, the applicant works with the Engineering Division on the required civil improvements to the property(Attachment 7). When that step has been completed, the applicant may apply for “final approval”with the Planning Division.When final approval has been granted, the final short plat is recorded at the Snohomish County Auditor’s office. 3.Major Issues: A proposed subdivision may be approved only if all of the following general findings can be made for the proposal, as approved or as conditionally approved: a. The proposal is consistent with the subdivision ordinance (ECDC 20.75.020) and meets all of the requirements in this chapter. b. The proposal is consistent with the Comprehensive Plan and is in the public interest. c. The proposal meets all requirements of the zoning ordinance, or a modification has been approved as provided for in this chapter.A modification to street setbacks was applied for –see section D.3 of this report (Attachment 5). d. The proposal meets all requirements of the Edmonds Community Development Code relating to flood plain management (Ord. 2466, 1984). 4.Owners: Robert W. Swerk and Carol J. Kosco (Attachments 2and 4). 5.Applicant: Robert Swerk. 6.Contacts: Rob Metcalf and Richard van Mourik (Attachment 2). 7.Tax Parcel Number: 27031300400600. 8.Location: 18812 Olympic View Drive, Edmonds. 9.Zoning: Single Family Residential (RS-12 Zone) (Attachment 1).The adjacent properties are also located in this zone and are developed with single family houses. 10.Acreage / Square Footage: 32,551 square feet (Attachment 15). Page 3of 11 Swerk Short Plat File PLN20130043 B.COMPLIANCE WITH THE SUBDIVISION ORDINANCE (ECDC 20.75): 1.Environmental: a.Topography and Vegetation Refer to either the Trees & Vegetation Plan(Attachment 17)or the Existing Conditions Map (Attachment 16) for topographical information on the property, as well as for the location of existing trees. The site slopes down from Olympic View Drive at a fairly steep incline. The existing house has been built into the slope and has a daylight basement. Vegetation throughout the site is typical of residential landscaping, including grass, shrubs, and trees. Many of the trees will need to be removed in order to install the required civil improvements. ECDC 23.90.040.C requiresnative vegetation retention of a minimum 30 percent on subdividableRS-12zoned properties (which applies to properties regardless of their critical areas designation). The native vegetation can be existing or proposed, or some combination of the two. Compliance will need to be shown on a future planand will need to be approved prior to final approval and recording. This typically involves bubbling out an area foreach lot on amap and indicating the species of vegetation within these areas. b.Environmental Review Review by the State Environmental Policy Act (SEPA) is not required with this application because the approval of short plats is exempt, except upon lands covered by water –refer to WAC 197-11-800 (1)(b)(i) (Categorical Exemptions).Therefore, an Environmental Checklist was not required with this proposal. Streams, ravines, and wildlife habitat do not exist on the property. Trees will be retained to the maximum extent feasible, which should help minimize adverse impacts to these resources.However, many trees will need to be removed prior to the installation of civil improvements. The proposal has been designed to minimize grading, because the existing driveway will be used for access. Because the driveway is steep, a driveway slope waiver has been granted by the Engineering Division (Attachment 6).A temporary erosion and sediment control plan (TESC) has been provided (Attachment 16). The proposal will be designed to minimize off-site impacts on drainage and views (Attachment 16).A preliminary drainage and stormwater report was submitted with this application and has been reviewed by the Engineering Division. It is not included as an attachment to this report, but it is available for review under file PLN20130043. c.ShorelineReview This site is not subject to Shorelines of the State regulations, because it is located well over 200 feet from the ordinary high water mark of Puget Sound (it is located approximately 600 feet from the train tracks). Page 4of 11 Swerk Short Plat File PLN20130043 d.Critical Areas Review Critical areas have been reviewed under file # CRA20130059. A determination of “study required” was made, because the slopes on the property exceed 15% rise over run(Attachment 13).Slopes between 15% and 39% may be considered potential erosion hazard areas. Slopes over 40% are considered steep slopes and could be landslide hazard areas. Because slopes on the site are roughly 25%, a geotechnical report (a “study”) is not required at this time.However, compliance with the City’s erosion control measures during civilimprovements as well as future building permits will be required. A memo from the geotechnical engineer related to soil types has been reviewed (Attachment 14). 2.Lot and Street Layout: The new lot has been designed to contain a usable building area (Attachment 15) as shown by the “conceptual building pad” located in the NW corner of Lot 2. Access to the new lot will be provided via a shared driveway easement with Lot 1 in order to minimize traffic hazards. Each lot meets the applicable dimensional requirements of the zoning ordinance (see table, below). No pedestrian walkways or bicycle paths are required with this proposal. Lot 1 is considered a regular lot, while Lot 2 is considered an interior or flag lot. Both lots meet the minimum (net) lot area of 12,000 square feet, as well as the minimum lot width of 80 feet for lots in the RS-12 zone. Lot WidthGross Lot AreaNet Lot Area Lot 1>100 feet15,13313,630 Lot 2>100 feet17,41817,418 The proposal meets the lot requirements of the zoning code. 3.Dedications: Nodedication of land is required by the City Engineer per the Engineering Requirements (Attachment 7). 4.Improvements: See Engineering Requirements (Attachment 7). 5.FloodPlain Management: The proposal is not within a flood plain. It is located within “Zone X” on the FEMA Flood Insurance Rate Map (Attachment 9). 6.Safe Walk Provisions: The subject site is primarily served by three schools: Edmonds Elementary, College Place Middle School, and Edmonds Woodway High School. Because the site is located within one mile of Edmonds Elementary (Attachment 8), no bus service is provided. There are existing sidewalks along Olympic View Drive that connect the site to Edmonds Elementary, while bus transportation would be provided for the middle and high school. Theproject, as proposed, complies with the subdivision ordinance. Page 5of 11 Swerk Short Plat File PLN20130043 C.COMPREHENSIVE PLANCOMPLIANCE: The Comprehensive Plan designation for this site is “Single Family –Resource.”The Comprehensive Plan has the following goals and policies for Residential Development that apply to this project: Goal.High quality residential development which is appropriate to the diverse lifestyle of Edmonds residents should be maintained and promoted. The options available to the City to influence the quality of housing for all citizens should be approached realistically in balancing economic and aesthetic considerations, in accordance with the following policies: B.1.Encouragethosebuilding custom homes to design and construct homes with architectural lines which enable them to harmonize with the surroundings, adding to the community identity and desirability. B.2.Protectneighborhoods from incompatible additions to existing buildings that do not harmonize with existing structures in the area. B.3.Minimizeencroachment on view of existing homes by new construction or additions to existing structures. B.4.Supportretention and rehabilitation of older housing within Edmonds wheneverit is economically feasible. B.5.Protect residential areas from incompatible land uses through the careful control of other types of development and expansion based on the following principles: B.5.a.Residential privacy is a fundamental protection to be upheld by local government. B.5.b.Traffic not directly accessing residences in a neighborhood must be discouraged. B.5.c.Stable property values must not be threatened by view, traffic, or land use encroachments. B.5.d.Private property must be protected from adverse environmental impacts of development including noise, drainage, traffic, slides, etc. B.6.Require that new residential development be compatible with the natural constraints of slopes, soils, geology, vegetation and drainage. (2012 City ofEdmonds Comprehensive Plan, pp. 71-72) The proposal will retain the existing house that was constructed in 1961(according to the Snohomish County Assessor’s records) and will allow for the construction of one new single family residenceon Lot 2.Privacy won’t be an issue, because the new home will be built into the slope. The only property that the access easement will serve is Lot 2. Drainage will be dealt with by the Engineering Division of the Public Works Department during civil review. However, they have reviewed a report that shows compliance with City Stormwater regulations can be achieved. This report is a background document to the file and can be found in the Planning Division offices. The overall proposal should not cause any adverse impacts and appears to be consistent with the residential development goals and policies of the Comprehensive Plan. Page 6of 11 Swerk Short Plat File PLN20130043 D.COMPLIANCE WITH THE ZONING CODE(ECDC CHAPTER 16.20): 1.Permitted Uses: One single family home is permitted on each lot.One single family home will remain on Lot 1, whileLot 2 will be vacant. 2.Setbacks: Pursuant to ECDC Section 21.90.020, a setback is, “… the minimum distance that buildings/structures or uses must be set back from a lot line, excluding up to 30 inches of eaves.”And, ECDC Section 21.55.040 defines a lot line as “… any line enclosing the lot area.”Lot area is defined in ECDC Section 21.55.020 as “… the total horizontal area within the boundary lines of a lot. Lot area shall normally exclude any street rights-of-way and access easements…” When a vehicular access easement projects onto or over a lot, setbacks must also be measured from the boundary of theaccess easement. Based on the development standards for the RS-12 zone, the setbacks for the lots are as follows: Lot 125’ Street SetbackFrom the east property line or edge of the vehicular access easement. See modification request, below. 25’ Rear SetbackFrom the west property line. 10’ Side SetbackFrom the north property line or edge of the vehicular access easement. 10’ Side SetbackFrom the south property line. Lot 210’ Side SetbackFrom all property lines, because this is considered an interior or “flag” lot. The existing house on Lot 1 will meet all setbacks, except for the 25’ east Street setback. This is becausethe location from which the setbacks are measured is moving closer to the home(currently measured from the east property line, soon to be measured from the western edge of the access easement). Therefore, a modification request has been receivedand is reviewed below in section D.3 of this report.The existing house will remain approximately 14 feet from the south side property line and 40 feet from the north side property line (where 10 feet is required). The existing house will remain approximately 55 feet from the west rear property line (where 25 feet is required). Lot 2 is vacant, so all setbacks will be measured and confirmed for compliance with a future building permit application. 3.Modification Request: The applicant has requested a modification to setbacks that would allow the existing house to remain in its current location as well as the existing driveway, which will turn into a shared access easement for the new lot. The existing house is approximately 29 feetfrom the east “street” property line and currently meets the required setbacks for the RS-12 zone. However, the proposed shared driveway and access easement will create a situation that requires setbacks to be measured from the west edge of the new easement. The existing house will then be approximately 15 feet from the new access easement, which does not meet required 25 foot street setback. Therefore, a modification to the normally required 25 foot street setback has been requested (Attachment 5).Staff agrees with the arguments made by the applicant, because they show compliance with the variance criteria. In addition to the applicant’s arguments in the modification request, staff’s arguments are provided below. Page 7of 11 Swerk Short Plat File PLN20130043 A modification may be approved only if all of the required findings set forth in ECDC Chapter 20.85 (Variances) can be made: a.Special Circumstances. That, because of special circumstances relating to the property, the strict enforcement of the zoning ordinance would deprive the owner use rights and privileges permitted to other properties in the vicinity with the same zoning. i.Special circumstances include the size, shape, topography, location or surroundings of the property, public necessity as of public structures and uses… and environmentalfactors such as vegetation, streams, ponds, and wildlife habitats. ii.Special circumstances should not be predicated upon any factor personal to the owner such as age or disability, extra expense which may be necessary to comply with the zoning ordinance, the ability to secure a scenic view, the ability to make more profitable use of the property, nor any factor resulting from the action of the owner or any past owner of the same property. The topography will not allow a separate driveway for Lot 2 and a driveway slope waiver has been approved by the City Engineer (Attachment 6). To utilize the existing driveway and create an access easement, setbacks will need to be encroached upon. There is no other viable means of access for Lot 2. Therefore, topography is the special circumstance that would normally deprive the owner of access. b.Special Privilege. That the approval of the variance would not be a grant of special privilege to the property in comparison with the limitations upon other properties in the vicinity with the same zoning. Granting a modification to setbacks would not be a grant of special privilege, because this will continue a pattern of access, due to topographical constraints, with the homes to the south that also front on Olympic View Drive. c.Comprehensive Plan. That the approval of the variance will be consistent with the Comprehensive Plan. See section II.C of this report for a discussion on how this proposal is consistent with the Comprehensive Plan. d.Zoning Ordinance. That the approval of the variance will be consistent with the purposes of the zoning ordinance and the zone district in which the property is located. Thefirst purposes of the residential zoning ordinance is to implement the Comprehensive Plan. As stated above, the proposal is consistent with the Comprehensive Plan and is therefore consistent with the first purpose. The second purpose is to protect the character and the social and economic stability of residential uses within the city. The proposed requestis appropriate, as it does not affect nor is a detriment to the surrounding neighborhood. All of the other zoning requirements will be met, so, after approving the modification request, the project will be in compliance with the zoning ordinance. Page 8of 11 Swerk Short Plat File PLN20130043 e.Not Detrimental. That the variance as approved or conditionally approved will not be significantly detrimental to the public health, safety and welfare or injurious to the property or improvements in the vicinity and same zone. The requestwill not be detrimental, as the location of the home and driveway will remain the sameas it has for the last 50 years.Actually, collocatingthe driveway has been deemed to be the safest way to provide access to Olympic View Drive. The setback of 15 feet rather than 25 feet has no effect on other properties in the area. Therefore, approving the modification request would not be detrimental. f.Minimum Variance. That the approved variance is the minimum necessary to allow the owner the rights enjoyed by other properties in the vicinity with the same zoning. The request is to reduce the impact to the steep slope by using the existing driveway for access.Also, the easement was designed to meet the dimensional requirements of City codes. There is no proposed addition to the existing home onLot 1. Any new addition would need to meet the required setbacks. Compliance with all City regulations created the need for this modification, which is the minimum necessary. Because all of the above criteria can be met, staff has recommended approval of the proposed setback modification. 4.Lot Coverage: A maximum 35% structural lot coverage is allowed in all single family zones. According to the survey data and confirmed through information on the Snohomish County Assessor’s website, the coverage on Lot 1 will be 1603 square feet. With a proposed net lot area of 13,630, that equates to roughly 12% lot coverage. Lot 2 will have 0% lot coverage. Compliance with the lot coverage requirement has been achieved. 5.Height Limit: The height of the existing structure will not change with this review. The height of any new structure will be reviewed during the building permit process. The maximum height in any single family zone is 25 feet as measured from the top of the ridge to average original grade. 6.Compliance with the Parking Code: ECDC Section 17.50.020 requires a minimum of two on-site parking spaces per single family dwelling. The existing garage (and driveway to the north) will continue to provide parking for two vehicleson Lot 1. Two parking spaces will also be required on Lot 2 at the time that the lot is developed with a single family home. Compliance with the parking code has been achieved. The proposed subdivision complies with the provisions of the Zoning Code. E.COMPLIANCE WITH FLOOD PLAIN MANAGEMENT PROVISIONS: The proposed project is notlocated in a Flood Plain (Attachment 9)and is therefore exempt from flood plain management provisions. Page 9of 11 Swerk Short Plat File PLN20130043 F.REVIEW COMMENTS: 1.Department Comments: This application was reviewed by the Parks and Recreation Department, the Public Works Department, Snohomish County Fire District 1,and by the Engineering Division of the Public Works Department. The Parks Department and the Fire District had no comments. The Public Works Department noted that there may be drainage issues for this site. The Engineering Division (which is part of the Public Works Department) had several issues, including drainage concerns, and has had an opportunity to ask questions of the applicant throughout preliminary review. After months of commenting and requiring the applicant to resubmit materials, the Engineering Division has now decided that all outstanding issues have been adequately addressed by the applicant. Refer to the memos attached to this report as well as the Engineering Requirements summary (Attachment 7). 2.Public Comments: ECDC Chapter 20.03 provides the City’s regulations for public notice of development applications. A “Notice of Application and Comment Period”was issued on November 28, 2013 with a comment period running through December 12, 2013(Attachment 10). This noticewas posted on the subject site, at the Public Safety Complex, Development Services Department, and Library. The notice was mailed to ownerswithin 300 feet of the site using a mailing list provided by the applicant. This notice was also published in the Herald Newspaper. Declarations of compliance with this chapter have been provided (Attachment 10). No public comments were received. III.APPEALSAND RECONSIDERATIONS: Any person wishing to file or respond to an appeal should contact the Planning Divisionat 425.771.0220for further procedural information. IV.LAPSE OF APPROVAL: ECDC Section 20.78.100states: A.Approval of a preliminary plat shall expire and have no further validity at the end of the time period established under RCW 58.17.140, unless the applicant has acquired final plat approval prior to the expiration date established under RCW 58.17.140. The time period for subdivisions shall commence upon the date of preliminary plat approval by the issuance of a written decision by the Edmonds hearing examiner. In the event that the decision of the hearing examiner is appealed to the Edmonds city council and/or Snohomish County superior court, the time period shall commence upon the date of final confirmation of the preliminary plat decision by the city council or judiciary. B.Approval of a short plat shall expire and have no further validity at the end of seven years if preliminary shortplat approval is issued on or before December 31, 2013, and five years if preliminary short plat approval is issued on or after January 1, 2014, unless the applicant has acquired final short plat approval within the specified time period. The time period for short plats shall commence upon the issuance of a final, written staff decision. Page 10of 11 Swerk Short Plat File PLN20130043 In the event that the decision of staff is appealed to the Edmonds hearing examiner and/or Snohomish County superior court, the time period shall commence upon the date offinal confirmation of the preliminary short plat decision by the hearing examiner or judiciary. \[Ord. 3925 §1, 2013\]. V.NOTICE TO THE COUNTY ASSESSOR: The property owner may, as a result of the decision rendered by the staff, request a change in the valuation of the property by the Snohomish County Assessor’s Office. VI.PARTIES OF RECORD: 1. Robert Swerk:800 Driftwood Place,Edmonds WA 98020 2. Carol Kosco:PO Box 164,Edmonds WA 98020 3. Rob Metcalf:5600 Harbour Pointe Blvd #1-307,Mukilteo WA 98275 th 4. Richard van Mourik:10512 NE 140Street,Kirkland WA 98034 th 5. City of Edmonds: 121 5Avenue North, Edmonds WA 98020 VII.ATTACHMENTS: 1. Zoning & Vicinity Map 2. Land Use ApplicationForm 3. Project Narrative 4. Ownership Clarification 5. Modification Request 6. Driveway Slope Waiver 7. Engineering Requirements & Memos 8. Edmonds School District Safe Walk Map 9. FEMA Flood Insurance Rate Map 10. Public Notices & Affidavits 11. Short Plat Certificate 12. EUC Form 13. Critical Areas Report 14. Soils Memo 15. Preliminary Short Plat Map, update received 02/25/2014 16. Civils(Existing Conditions, TESC, Drainage Plan), update received 01/17/2014 17. Tree & Vegetation Plan, update received 02/25/2014 Page 11of 11 861745240 1 8 1 8 7 1 9 1 8 8 0 2 18 81 18 80 9 1 8 8 1 2 18 81 9 18 81 1 8 8 2 4 18 82 3 1 8 90 2 18906 18904 1 8 9 1 18 090 8 1 8 9 1 2 18 91 1 8 91 4 18922 18 91 7 1 8 9 1 6 0 63 9 1 8 92 9 B LA K E P L 1 9 0 0 5 96 36 96 15 19 01 1 9 1 9 0 1 3 1 9 0 1 7 9711 96 11 98 2398 19 97 1596 09 1 9 02 6 C HE RR Y S T \] City of Edmonds Swerk 2-Lot Short Subdivision Zoning Vicinity Map File PLN20130043 0150300Feet 18812 Olympic View Drive (RS-12 Zone) ATTACHMENT - 1 ATTACHMENT - 2 ATTACHMENT - 3 ATTACHMENT - 4 ATTACHMENT - 5 ATTACHMENT - 5 ATTACHMENT - 5 ATTACHMENT - 5 ATTACHMENT - 5 ATTACHMENT - 6 ATTACHMENT - 6 ATTACHMENT - 6 CITY OF EDMONDS 121 - 5TH AVENUE NORTH, EDMONDS, WA 98020 PUBLIC WORKS DEPARTMENT - ENGINEERING DIVISION To: Planning DivisionFile Number:PLN20130043 From: Jennifer Lambert, Engineering Technician Engineering Division February 7, 2013 Date: Swerk - 2 Lot Short Plat Project: Address: 18812 Olympic View Dr Required as a Required as a Requirement Condition of Condition of Already Building Permit SubdivisionSatisfied Right-of Way Dedication for Public Streets: 1. a) N/A 2.Public Street Improvements (Asphalt, curb, gutter and sidewalks): a) Curb and walkway shall be removed and replaced along property frontage as X required to comply with City requirements. b) Sidewalk to be removed and replaced along property frontage on Olympic X View Dr as required to comply with City requirements and ADA standards. Lots 1 & 2 shall share a private access road, with access from Olympic View c) X Dr. i. Driveway access shall meet sight distance requirements set forth by the American Association of State Highway and Transportation Officials (AASHTO). 3.Private Access Requirements & Improvements: Lot 1 and 2 shall take access off the private access road. Access road will be a) X shared by both lots. i.Private access road shall be paved 12.0' in width, plus 18" asphalt thickened edge or 6-inch concrete extruded curb may be used to direct storm X flows. ii. Slope of private access road and driveways is approved for 17%, not to exceed 20% per the driveway slope waiver determinations and shall be noted XX as such on the civils. X iii. Cross slope of private access road shall not exceed 2% Individual driveway access points shall meet sight distance requirements set b) forth by the American Association of State Highway and Transortation X Officials (AASHTO). 4.Street Turnaround: N/A a) Easements 5. (City utilities, private access, other utilities): X a)Provide all easements as required - access, utility, etc. X b)All lots shall access off private access road. X c)Private access easement shall be 15 (fifteen) feet in width 6.Street Lights: N/A a) ENGR RQMNTS_PLN20130043_Swerk.xlsx1 of 3 form revised 07.19.11printed 3/6/2014 ATTACHMENT - 7 Required as a Required as a Requirement Condition of Condition of Already Building Permit SubdivisionSatisfied 7.Planting Strip: N/A a) 8.Water System Improvements: Public hydrant spacing shall meet requirements of ECDC 19.25.X a) Provide water service stub to each Lot X b) X Connect to public water system.X c) 9.Sanitary Sewer System Improvements: Provide 6" lateral within utility easement and individual side sewers to each a) X lot with 6" cleanout at each property line. i. Where the sewer lateral is shared by more than one lot, it shall be 6". X ii. Provide 4" side sewer to individual lots X Connect to public sewer system.X c) 10.Stormwater System Improvements: Provide a Stormwater Management Report and Site Plan that shows a) compliance with ECDC 18.30, Stormwater Supplement and 2005 Department X X of Ecology Stormwater Manual. Manage stormwater on site where feasible.X b) X Construct privately owned and maintained stormwater management system c) sized to provide adequate capacity for proposed future single family X X dwellings, and associated impervious areas in accordance with ECDC 18.30. i.Stormwater management system to be located on private property. ii. Construction of storm facility may be deferred to coincide with construction of a single family residence on Lot 2 if the required short plat improvements create less than 2000sf of impervious area and the site is less than one acre in size. X X Connect all new impervious surfaces to storm system as required. d) Connect to public storm system or manage stormwater on site if soils allow. e) X X 11.Underground Wiring (per Ord. 1387): X Required for all new services.X a) 12.Excavation and Grading (per IBC) X Submit a grading plan as part of engineered site plan.X a) X Submit grading plan for foundations with building permit. b) 13.Signage and Striping (per City Engineer): Provide fire and aid address signage.X a) 14.Survey Monumentation (per Ord., Sect. 12.10.120): N/A a) 15.As-built Drawings (per City Engineer): Provide an as-built drawing of all street and utility improvements both in a) X X electronic format as well as a hard copy. 16.Other Requirements: X Plat showing lots, easements, legals, survey information X a) Legal documents for each lot b)X Field stake lot corners (by professional surveyor)X c) ENGR RQMNTS_PLN20130043_Swerk.xlsx2 of 3 form revised 07.19.11printed 3/6/2014 ATTACHMENT - 7 Required as a Required as a Requirement Condition of Condition of Already Building Permit SubdivisionSatisfied Field stake utility stubs at property lines d)X Clustered mailbox location per Postmaster X e) Maintenance agreements f)X X Traffic Impact Fee Analysis g) 17.Engineering Fees: Storm system development charge (public road)N/A a) X Storm system development charge (each new lot)$799.00 b)* X Sewer connection fee (each new lot)$4,417.00 * c) X Water connection fee - 3/4" Meter (each new lot)$5,050.00 * d) X Water meter fee - 3/4" Meter$2,920.00 * e) X Traffic mitigation fee per each new SFR$1,196.33 * f) X Short Plat civil plan review fee$2,570.00 * g) Right-of-Way Construction PermitTBD X h) X Inspection fees (Based on Cost Estimate)TBD i) *** Fees provided are an estimate only and reflect rates current at the time of preliminary approval. ENGR RQMNTS_PLN20130043_Swerk.xlsx3 of 3 form revised 07.19.11printed 3/6/2014 ATTACHMENT - 7 MEMORANDUM Date:February 10, 2014 To: Gina Janicek, Associate Planner From: Jennifer Lambert, Engineering Technician Subject: PLN20130043, 2-Lot Short Plat - Swerk 18812 Olympic View Dr Engineering has reviewed and approved the preliminary short plat application for the Swerk property at 18812 Olympic View Dr. Preliminary approval shall not be interpreted to mean approval of the improvements as shown on the preliminary plans. Final utility system design and location will be determined at the civil construction plan phase of this project. Please find attached the Engineering Requirements for the subject development. The applicant will be required to satisfy these requirements as a condition of short plat approval. In addition, the Driveway Slope Waiver Approval letter is included. Once the Planning Division has approved the preliminary short plat, the applicant will be required to submit revised civil engineering plans addressing all short plat conditions. Plans are to be submitted to the Engineering Division. A civil plan review fee is to be paid at the time of submittal. At this time, the review fee is $2570.00. The following information is provided in an effort to assist with preparation of the civil construction plans: 1)Civil plan sheets shall include an approval block similar to that provided on the City website: http://www.edmondswa.gov/services/permits-development/handouts- forms/engineering-standards.html 2)Provide utility purveyor information. 3)Update General Notes to reference current codes/standard specifications. 4)Include in the construction sequence phasing of work and protection of areas that will provide low impact development stormwater management. Thank you. City of Edmonds ATTACHMENT - 7 MEMORANDUM Date: November 12, 2013 To: Gina Janicek, Associate Planner From: Jennifer Lambert, Engineering Technician Subject: PLN20130043, 2-lot Short Plat - Swerk 18812 Olympic View Dr The comments provided below are based upon review of the recent submittal dated 10/17/13 of the preliminary civil plans & documents for the subject short plat. Additional information is requested from the applicant at this time in order to continue review of the application and provide preliminary approval of the short plat. Please ask the applicant to revise and resubmit plans addressing each of the comments below. Please also note, after receiving preliminary short plat approval from the Planning Division, the applicant will be required to submit civil engineering plans to the City for review and approval after receiving preliminary short plat approval from the Planning Division. 1)OK 2)OK 3)OK 4)OK 5)The first part of this comment was addressed; however the second was not. Please address the comment sent on 7/23/13. 7/23/13 Comment: Please show the location of the homes located at 18805 Soundview Pl and 18815 Soundview Pl. Please show the overflow path for the proposed infiltration system and confirm that it will not adversely impact the adjacent properties. 6)OK Thank you. City of Edmonds ATTACHMENT - 7 ATTACHMENT - 7 MEMORANDUM Date: July 23, 2013 To: Gina Janicek, Associate Planner From: Jennifer Lambert, Engineering Technician Subject: PLN20130043, 2-lot Short Plat - Swerk 18812 Olympic View Dr The comments provided below are based upon review of the preliminary civil plans & documents for the subject short plat. Additional information is requested from the applicant at this time in order to continue review of the application and provide preliminary approval of the short plat. Please ask the applicant to revise and resubmit plans addressing each of the comments below. Please also note, after receiving preliminary short plat approval from the Planning Division, the applicant will be required to submit civil engineering plans to the City for review and approval after receiving preliminary short plat approval from the Planning Division. 1)Where the existing driveway is parallel to the right of way (parallel to Olympic View Dr) the 12’ wide paved driveway and 15’ access easement must be entirely on private property. 2)All exisiting easements located on or benefiting the subject parcel must be shown on the plans. 3)The sewer asbuilt (attached) indicates that the existing sewer crosses into 18805 Soundveiw Pl property. Please show the easement or obtain an easement for the portion of the sewer that crosses 18805 Soundview Pl. or confirm that the sewer is located as shown on the preliminary plans and soley within the City Sewer Easement. 4)If a retaining wall is proposed within the right of way, an encroachment permit will need to be obtained prior to approval of the civils. 5)Please show the location of the homes located at 18805 Soundview Pl and 18815 Soundview Pl. Please show the overflow path for the proposed infiltration system and confirm that it will not adversely impact the adjacent properties. City of Edmonds ATTACHMENT - 7 6)It is understood that portions of the driveway are existing; however, the driveway will need to be widened to meet the required access widths. The proposed contours as shown on the grading plan indicate a driveway slope in excess of 14% in several locations. The Edmonds Community Development Code 18.80.060D does not allow for driveway slopes to exceed 14% without first obtaining approval by the City Engineer. The maximum allowed driveway slope is 20%. Adjust the slope of the driveway to reflect a 14% grade and/or maximum 20% grade along with a request for waiver that provides an explanation as to why the required 14% slope cannot be . achieved Thank you. ATTACHMENT - 7 8/06/09 1 Mile Radius Suggested RoutesEdmonds Elementary Mile radius borderEdmonds Elementary borderSuggested routes within 1 mile radiusBus stops outside 1 mile radiusCrossing guard locations ATTACHMENT - 8 - 9ATTACHMENT Notice of Pending Land Use Application Swerk 2-Lot Short Subdivision: File # PLN20130043 Located at 18812 Olympic View Drive NAME OF APPLICANT: Robert Swerk, property owner. DATE OF PUBLIC NOTICE: November 28, 2013. PROJECT LOCATION: 18812 Olympic View Drive, Edmonds (RS-12 zone). PROJECT DESCRIPTION: Notice of application and two week comment period for a ÑType IIÒ 2-lot short subdivision application. A setback modification was requested to allow the existing house to remain and to use the existing driveway as an access easement for the proposed new back lot. In addition, a driveway slope exception was requested in order to utilize the existing driveway which exceeds the normally required 14% grade. The application was submitted on 6/28/13 and was determined to be complete on 11/12/13. The application is available for review at the Planning Division counter: 121 5th Avenue North, Edmonds. Please contact the project planner if you have any questions. PUBLIC COMMENTS: Written public comments must be received by 4:30 PM on December 12, 2013. WARNING: The removal, mutilation, destruction, or concealment of posted notices before the removal date is a misdemeanor punishable by fine and imprisonment. This notice was mailed to owners within 300 feet of the site, posted on site, posted at the Public Safety Complex, Library, and at City Hall. It was also Published in the Everett Herald. City of Edmonds Information on this development application can be viewed or Development Services Department obtained at the City of Edmonds Planning Division between the hours of 8:00 AM and 4:30 PM Monday through Friday (8:00-noon on Planning Division Wednesdays) or online through the CityÔs website. Visit www.EdmondsWA.gov, navigate to ÑPermits OnlineÒ 121 5th Avenue North and then ÑSearch for Permit.Ò Edmonds, WA 98020 Any person has the right to comment on this application during the public comment period, receive notice, participate in any hearings, Project Planner: Gina Janicek and request a copy of the decision on the application. The City may Gina.Janicek@EdmondsWA.org accept public comments at any time prior to 425.771.0220 x 1778 closing of the record or prior to the decision on the project permit. Only parties of record as defined in ECDC 20.07.003 have www.EdmondsWA.gov standing to initiate an administrative appeal. ATTACHMENT - 10 861745240 1 8 1 8 7 1 9 1 8 8 0 2 18 81 18 80 9 1 8 8 1 2 18 81 9 18 81 1 8 8 2 4 18 82 3 1 8 90 2 18906 18904 1 8 9 1 18 090 8 1 8 9 1 2 18 91 1 8 91 4 18922 18 91 7 1 8 9 1 6 0 63 9 1 8 92 9 B LA K E P L 1 9 0 0 5 96 36 96 15 19 01 1 9 1 9 0 1 3 1 9 0 1 7 9711 96 11 98 2398 19 97 1596 09 1 9 02 6 C HE RR Y S T \] City of Edmonds Swerk 2-Lot Short Subdivision Zoning Vicinity Map File PLN20130043 0150300Feet 18812 Olympic View Drive (RS-12 Zone) ATTACHMENT - 10 ATTACHMENT - 10 ATTACHMENT - 10 ATTACHMENT - 10 ATTACHMENT - 11 ATTACHMENT - 11 ATTACHMENT - 11 ATTACHMENT - 11 ATTACHMENT - 11 ATTACHMENT - 12 ATTACHMENT - 13 ATTACHMENT - 13 ATTACHMENT - 13 1 8 9 0 2 H Critical Areas Map File Number: CRA20130059 18812 Olumpic View Drive Scale 1 inch = 50 feet ATTACHMENT - 13 ATTACHMENT - 14 ATTACHMENT - 14 15 - ATTACHMENT 16 - ATTACHMENT 16 - ATTACHMENT 16 - ATTACHMENT 16 - ATTACHMENT 17 - ATTACHMENT