Loading...
StevensHospEspresso1.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: May 1, 2008 TO: SPT Mechanical e-mail: tom@STPmechanical FROM: Ann Bullis, Assistant Building Official RE: Plan Check # 2008-0321 Project: Stevens Hospital Cafeteria – plumbing th Project Address: 21601 76 Ave W During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Provide written responses to each comment and where changes can be found on the plans. Please resubmit to Thresa Umbaugh, Permit Coordinator. 1.Architectural plans (stamped and signed by State licensed architect and drawn to scale) must be submitted as part of this permit application showing the following: a.Provide overall general floor plan of this floor of building showing reference location of the proposed espresso stand. b.Provide building type of construction, fire separation locations and ratings, listed and tested fire stopping assemblies for walls and floor-ceilings for each type of penetration. c.Provide partial enlarged floor plan of the cafeteria showing the proposed espresso stand area, including uses of space, walls, fixtures, furnishings, kitchen fixture schedule, etc. Clearly show that exiting will not be obstructed. 2.On the plumbing isometric note the type of piping and also slope. Note backflow protection devices for proposed kitchen equipment on the plans. 3.The Plumbing Fixture Count schedule submitted with the application notes the sink trap as 1¼”. The minimum trap size is 1½” – please note on the isometric drawing. 4.Provide approval letter from State Department of Health for this project.