Loading...
STF20070006 Approval 4-13-07.pdfApril 13, 2007 CITY OF EDMONDS 121 5TH AVENUE NORTH • EQMONDS, WA 98020 • (425) 771-0220 • FAX (425) 771-0221 Website: www.0i.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning • Building • Engineering Mr. Harry Daugherty, P.E. H.B. Daugherty Consulting Engineers 6776 Providence Box 2854 Whitehouse, Ohio 43571 RE: Request for Alternate Design @ 160 West Dayton Street Harbor Square Athletic Club Dome Structure VIA FACSIMILE Dear Mr. Daugherty, GARY HAAKENSON MAYOR The City is in receipt of your alternate design request on behalf of Harbor Square Athletic Club air - supported roof structure located at 160 West Dayton Street in Edmonds to reduce the minimum snow load requirement. Section 1608 of the 2003 International Building Code includes the provision to determine applicable snow loads for roof structures. The City has issued a Building Official interpretation effective July 1, 2004 that the total Snow Load for Edmonds is 25ps£ This decision was based on the Second Edition of the Structural Engineers Association of Washington (SEAW) Snow Load Analysis for the State of Washington (revised July 1995) which recommended the Ground Snow Load for Seattle at 20psf and Rain on Snow surcharge at 5psf. By your calculations the proposed air supported roof structure cannot sustain a snow load of more than 5psf concentrated at the. crown.. In. reviewing your request you have provided adequate information, and assurance that roof failure from a snow event would typically take several hours, that such imminent failure would be obvious to all persons which would lead to a quick and safe evacuation, and that the building owner will be provided with specific operating and emergency response training and evacuation instructions from the manufacturer. It is my determination as Building Official for the City of Edmonds that the request for a reduction of snow Ioad for the air -supported roof structure at Harbor Square is hereby Approved. As Engineer of Record you shall be required to inform the building owner of the snow load limitations for the building. Sincerely, Jeannine L. Graf Building Official, C.B.O. • Incorporated August 11, 1890 •