STF20160021 SEPA checklist.pdfSEPA ENVIRONMENTAL CHECKLIST
A. Backgroundhf elpl
1. Name of proposed project, if applicable: jtpm
Brackett's Landing Jetty Walkway Repair Project OC T
2. Name of applicant:hf elpl "'AMVING DEP
City of Edmonds Department of Parks, Recreation, and Culture
3. Address and phone number of applicant and contact person: 1LPjPJ
Jennifer Leach 425-771-0227
Rich Lindsay 425-771-0289
Carrie Hite 425-771-0343
4. Date checklist prepared:hf gj
10/7/2016
5. Agency requesting checklist: Itpjp
City of Edmonds Development Services Department
6. Proposed timing or schedule (including phasing, if applicable):hf gm
As soon as permits are approved. Goal is to complete project no later than November 15, 2016 if permits
can be expedited.
7. Do you have any plans for future additions, expansion, or further activity related to or
connected with this proposal? If yes, explain. Lhel
No
8. List any environmental information you know about that has been prepared, or will be
prepared, directly related to this proposal.hf elpl
None
9. Do you know whether applications are pending for governmental approvals of other
proposals directly affecting the property covered by your proposal? If yes, explain.hf elpl
None
10. List any government approvals or permits that will be needed for your proposal, if known.
hf9
Hydraulic Approval Permit (HPA) is required from WDFW. They have agreed to expedite the review and
approval process.
SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 1 of 13
11. Give brief, complete description of your proposal, including the proposed uses and the size
of the project and site. There are several questions later in this checklist that ask you to
describe certain aspects of your proposal. You do not need to repeat those answers on this
page. (Lead agencies may modify this form to include additional specific information on project
description.)hf elpl
Several holes have developed in the asphalt walkway at the tip of the Brackett's Landing j etty due to
settlement of the jetty caused by tidal action. There are three areas at end of the jetty that need to be
repaired totaling about 322 square feet. Parks maintenance staff proposes to remove the sunken asphalt
and haul off site to Public Works; install about 12 yards of 7/8" washed gravel and compact rock; and
install about 2 yards of type B - modified asphalt for pathway. Waddles will be installed as a BMP
throughout the duration of the repair to protect migration of materials beyond the project site.
Additionally, the area will be kept very clean while performing this work to further reduce the risk of
materials migration.
12. Location of the proposal. Give sufficient information for a person to understand the precise
location of your proposed project, including a street address, if any, and section, township, and
range, if known. If a proposal would occur over a range of area, provide the range or
boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic
map, if reasonably available. While you should submit any plans required by the agency, you
are not required to duplicate maps or detailed plans submitted with any permit applications
related to this checklist.hf g
SEE FIGURES 1 AND 2 ON FOLLOWING PAGE
SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 2 of 13
FIGURE 1. PROJECT VICINITY. ' PROJECT SITE
IA,
�mr a -k
Sao 3663-- —1h " .. .a..
N J+ l
II/ �
FIGURE 2. PROJECT LOCATION. EXTENT OF PROJECT WORK
1 r;uow ht, syr /.�G—,Hina, Mrv.. �)i�i'l/%/A➢ ti�1Py1%� yrinJVlr; I 1 jfl lY mfy ii07//'A2 iiYYhd f'i(Y�911� yy�� ,D�p ���)I �J/q7" i,N�)� r � O11%%�,",J`bl�.m Zlha .,,�.
1' ,.,w �)jqy ,�„v7fd,�,,, ,0 ,,, ;jfp'%%�,�,
SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 3 of 13
B. ENVIRONMENTAL ELEMENTShf el
1. Earthhf e
a. General description of the site:hf e
(circle one)G)rolling, hilly, steep slopes, mountainous, other
b. What is the steepest slope on the site (approximate percent slope)? hf elpl
0
c. What general types of soils are found on the site (for example, clay, sand, gravel, peat,
muck)? If you know the classification of agricultural soils, specify them and note any
agricultural land of long-term commercial significance and whether the proposal results in
removing any of these soils.hf elpl
Jetty rip -rap, asphalt trail.
d. Are there surface indications or history of unstable soils in the immediate vicinity? If so,
describe.hf elpl
Subsidence associated with tidal action on the jetty.
e. Describe the purpose, type, total area, and approximate quantities and total affected area of
any filling, excavation, and grading proposed. Indicate source of fill.hf elpl
There are three areas at the end of the jetty that need to be repaired totaling about 322 square feet. Parks
maintenance staff proposes to remove the sunken asphalt and haul off site to Public Works; install about
12 yards of 7/8" washed gravel and compact rock; and install about 2 yards of type B - modified asphalt
for pathway.
f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe,
hf elpl
No
g. About what percent of the site will be covered with impervious surfaces after project
construction (for example, asphalt or buildings)?hf elpl
Site is currently 100% covered with impervious surface: this project will repair it back to a functional
original condition.
h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any:hf pial
Waddles will be installed as a BMP and will be maintained throughout the duration of the repair to protect
migration of materials beyond the project site. Additionally, the area will be kept very clean while
performing this work to further reduce the risk of materials migration.
2. Airhf pial
SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 4 of 13
a. What types of emissions to the air would result from the proposal during construction,
operation, and maintenance when the project is completed? If any, generally describe and
give approximate quantities if known. hel
Minor dust and fumes released from jackhammering and filling activities.
b. Are there any off-site sources of emissions or odor that may affect your proposal? If so,
generally describe.hf @jp
No
c. Proposed measures to reduce or control emissions or other impacts to air, if any:hf e
None
3. Water hel
a. Surface Water:
1) Is there any surface water body on or in the immediate vicinity of the site (including
year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe
type and provide names. If appropriate, state what stream or river it flows into.hl elpl
Yes. Project work will occur on a jetty that abuts the Puget Sound.
2) Will the project require any work over, in, or adjacent to (within 200 feet) the described
waters? If yes, please describe and attach available plans. Lhel
Work will occur within 200 feet of the Puget Sound. See Section A.11, A.12; Figures 1 and 2.
2) Estimate the amount of fill and dredge material that would be placed in or removed
from surface water or wetlands and indicate the area of the site that would be affected.
Indicate the source of fill material.hf elp]
Remove 2 yards of damaged asphalt pathway and fill void with 12 yards 7/8 washed gravel.
Then install 2 yards of type B modified asphalt.
4) Will the proposal require surface water withdrawals or diversions? Give general
description, purpose, and approximate quantities if known. hel
No.
5) Does the proposal lie within a 100 -year floodplain? If so, note location on the site plan,
hf elpl
No.
6) Does the proposal involve any discharges of waste materials to surface waters? If so,
describe the type of waste and anticipated volume of discharge. hf elpl
No.
SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 5 of 13
b. Ground Water:
1) Will groundwater be withdrawn from a well for drinking water or other purposes? If so,
give a general description of the well, proposed uses and approximate quantities
withdrawn from the well. Will water be discharged to groundwater? Give general
description, purpose, and approximate quantities if known. hf elpl
No.
2) Describe waste material that will be discharged into the ground from septic tanks or
other sources, if any (for example: Domestic sewage; industrial, containing the
following chemicals... ; agricultural; etc.). Describe the general size of the system, the
number of such systems, the number of houses to be served (if applicable), or the
number of animals or humans the system(s) are expected to serve. hf elpl
No.
c. Water runoff (including stormwater):
1) Describe the source of runoff (including storm water) and method of collection
and disposal, if any (include quantities, if known). Where will this water flow?
Will this water flow into other waters? If so, describe.hf gio
Stormwater falling onto the project site runs onto rip rap and directly into the Puget Sound.
2) Could waste materials enter ground or surface waters? If so, generally describe.hf e
Dust and debris from excavating and filling could be flushed by stormwater during project work.
3) Does the proposal alter or otherwise affect drainage patterns in the vicinity of the site? If
so, describe.hf elpl
No.
d. Proposed measures to reduce or control surface, ground, and runoff water, and drainage
pattern impacts, if any:hf elpl
Waddles will be installed throughout the duration the project, to trap any materials that may
enter stormwater during project work.
4. Plantshf elpl
a. Check the types of vegetation found on the site:hf e
No vegetation is on site except for small weeds growing through cracks in pavement or between
jetty rocks.
deciduous tree:
.evergreen tree:
shrubs
grass
pasture
crop or grain
alder, maple, aspen, other
fir, cedar, pine, other
SEPA Environmental checklist (WAC 197.11-960) July 2016 Page 6 of 13
Orchards, vineyards or other permanent crops.
wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other
Water plants: water lily, eelgrass, milfoil, other
other types of vegetation
b. What kind and amount of vegetation will be removed or altered?hf elpl
None.
c. List threatened and endangered species known to be on or near the site. hel
None.
d. Proposed landscaping, use of native plants, or other measures to preserve or enhance
vegetation on the site, if any: hf elpl
None.
e. List all noxious weeds and invasive species known to be on or near the site. hel
None.
5. Animalshf elpl
a. List any birds and other animals which have been observed on or near the site or are known
to be on or near the site. heI
Examples include:
birds: hawk, heron, eagle, songbirds, other:
mammals: deer, bear, elk, beaver, other:
fish: bass, salmon, trout, herring, shellfish, other
Gulls, shorebirds, harbor seals, aquatic invertebrates, and fish known to use the rocky intertidal habitats of
Puget Sound are all present in the vicinity of the project site.
b. List any threatened and endangered species known to be on or near the site.hf @j
None. Threatened and endangered wildlife are present in Puget Sound, but are not likely to be found in the
immediate vicinity of the project site.
c. Is the site part of a migration route? If so, explain.hf elpl
The site is on the Pacific Flyway, a known migratory route for birds.
d. Proposed measures to preserve or enhance wildlife, if any:hf elpl
None — work is routine maintenance.
e. List any invasive animal species known to be on or near the site. heI
None known.
6. Energy and Natural Resourceshf elpl
SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 7 of 13
a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet
the completed project's energy needs? Describe whether it will be used for heating,
manufacturing, etc. hel
Jack hammers and backhoe will be used to remove damaged asphalt pathway
b. Would your project affect the potential use of solar energy by adjacent properties?
If so, generally describe. 1hel
No.
c. What kinds of energy conservation features are included in the plans of this proposal?
List other proposed measures to reduce or control energy impacts, if any: ltgjo
We will turn off engines and machinery when not in use, and use rechargeable electric tools wherever
possible.
7. Environmental Health hel
a. Are there any environmental health hazards, including exposure to toxic chemicals, risk
of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal?
If so, describe. 1LpjpJ
1) Describe any known or possible contamination at the site from present or past uses,.
hf eM
None known.
2) Describe existing hazardous chemicals/conditions that might affect project development
and design. This includes underground hazardous liquid and gas transmission pipelines
located within the project area and in the vicinity. hel
None.
3) Describe any toxic or hazardous chemicals that might be stored, used, or produced
during the project's development or construction, or at any time during the operating
life of the project. JL@M
None.
4) Describe special emergency services that might be required. hf elpl
None.
5) Proposed measures to reduce or control environmental health hazards, if any:hf elpl
None.
b. Noisehf e
1) What types of noise exist in the area which may affect your project (for example:
traffic, equipment, operation, other)? hel
Train, ferry are located nearby, but not expected to affect the project.
SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 8 of 13
2) What types and levels of noise would be created by or associated with the project on a
short-term or a long-term basis (for example: traffic, construction, operation, other)? Indi-
cate what hours noise would come from the site.hf pjM
Jackhammers, backhoe and other machinery needed to complete the project will generate some
short-term noise. This noise would be generated between the hours of 8:00 am to 3:00 pm
3) Proposed measures to reduce or control noise impacts, if any:hf elal
We will turn off engines and machinery when not in use and NOT operate equipment between the
hours of 3:00 pm 8:00 am
8. Land and Shoreline Usehf elpl
a. What is the current use of the site and adjacent properties? Will the proposal affect current
land uses on nearby or adjacent properties? If so, describe.hf e
The project site and adjacent areas are part of the Edmonds park system used for recreation and are a high
priority in the Parks, Recreation, and Open Space Comprehensive Plan. The Brackett's Landing Marine
Sanctuary and Dive Park lie to the north and west of the project area and the Washington State Ferry
Terminal lies to the south. The project site is currently located at the terminus of a pedestrian walkway on
a jetty; this part of the walkway is currently roped off to prevent injury to the public who may be
traversing the damaged walkway. Project work will not affect land use on or near the site.
b. Has the project site been used as working farmlands or working forest lands? If so, describe.
How much agricultural or forest land of long-term commercial significance will be converted to
other uses as a result of the proposal, if any? If resource lands have not been designated,
how many acres in farmland or forest land tax status will be converted to nonfarm or
nonforest use?hf elpl
No.
1) Will the proposal affect or be affected by surrounding working farm or forest land normal
business operations, such as oversize equipment access, the application of pesticides,
tilling, and harvesting? If so, how:hf elpl
No..
c. Describe any structures on the site.hf elpl
None.
d. Will any structures be demolished? If so, what? 1hel
No.
e. What is the current zoning classification of the site? hf elpl
Public Use.
f. What is the current comprehensive plan designation of the site?LLp!pI
Park/Open Space
g. If applicable, what is the current shoreline master program designation of the site?hf elpl
Conservancy.
SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 9 of 13
h. Has any part of the site been classified as a critical area by the city or county? If so, specify,
hf dpi
Site is within the 200 foot shoreline buffer.
i. Approximately how many people would reside or work in the completed project? hf elpl
None
j. Approximately how many people would the completed project displace?hf g
None
k. Proposed measures to avoid or reduce displacement impacts, if any: hel
NA
L. Proposed measures to ensure the proposal is compatible with existing and projected land
uses and plans, if any:fhg!pl
NA
m. Proposed measures to reduce or control impacts to agricultural and forest lands of long-term
commercial significance, if any: Lhel
NA
9. Housinghf e
a. Approximately how many units would be provided, if any? Indicate whether high, mid-
dle, or low-income housing. Lhel
None
b. Approximately how many units, if any, would be eliminated? Indicate whether high,
middle, or low-income housing. Lhel
None
c. Proposed measures to reduce or control housing impacts, if any:hf elpl
None
10. Aesthetics LtLeM
a. What is the tallest height of any proposed structure(s), not including antennas; what is
the principal exterior building material(s) proposed?hf elpl
No
SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 10 of 13
b. What views in the immediate vicinity would be altered or obstructed?hf @
None
b. Proposed measures to reduce or control aesthetic impacts, if any: hel
NA
11. Light and Glare hel
a. What type of light or glare will the proposal produce? What time of day would it mainly
occur? hf elpl
None
b. Could light or glare from the finished project be a safety hazard or interfere with views? Lhel
None
c. What existing off-site sources of light or glare may affect your proposal? hel
None
d. Proposed measures to reduce or control light and glare impacts, if any: hf elpl
NA
12. Recreationhf elpl
a. What designated and informal recreational opportunities are in the immediate vicinity?hf elpl
Walking, swimming, boating, diving.
b. Would the proposed project displace any existing recreational uses? If so, describe. Lhel
Walking, which is already displaced due to the need for repair.
c. Proposed measures to reduce or control impacts on recreation, including recreation
opportunities to be provided by the project or applicant, if any: hf e
NA
13. Historic and cultural preservation LLp1p1
a. Are there any buildings, structures, or sites, located on or near the site that are over 45 years
old listed in or eligible for listing in national, state, or local preservation registers ? If so,
specifically describe.hf pM
None
SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 11 of 13
b. Are there any landmarks, features, or other evidence of Indian or historic use or occupation?
This may include human burials or old cemeteries. Are there any material evidence, artifacts,
or areas of cultural importance on or near the site? Please list any professional studies
conducted at the site to identify such resources. hf elpl
None
c. Describe the methods used to assess the potential impacts to cultural and historic resources
on or near the project site. Examples include consultation with tribes and the department of
archeology and historic preservation, archaeological surveys, historic maps, GIS data, etc.
hf elpl
NA
d. Proposed measures to avoid, minimize, or compensate for loss, changes to, and disturbance
to resources. Please include plans for the above and any permits that may be required. Lhel
NA
14. Transportation hel
a. Identify public streets and highways serving the site or affected geographic area and
describe proposed access to the existing street system. Show on site plans, if any. hf elpl
See Section A.12, Figure 1.
b. Is the site or affected geographic area currently served by public transit? If so, generally
describe. If not, what is the approximate distance to the nearest transit stop?hf e
Yes — train and bus routes close to park.
c. How many additional parking spaces would the completed project or non -project proposal
have? How many would the project or proposal eliminate?hf elpl
NA
d. Will the proposal require any new or improvements to existing roads, streets, pedestrian,
bicycle or state transportation facilities, not including driveways? If so, generally describe
(indicate whether public or private). hel
No
e. Will the project or proposal use (or occur in the immediate vicinity of) water, rail, or air
transportation? If so, generally describe.hf elpl
No
f. How many vehicular trips per day would be generated by the completed project or proposal?
If known, indicate when peak volumes would occur and what percentage of the volume would
be trucks (such as commercial and nonpassenger vehicles). What data or transportation
models were used to make these estimates?hf gjo
SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 12 of 13
g. Will the proposal interfere with, affect or be affected by the movement of agricultural and
forest products on roads or streets in the area? If so, generally describe.hf elpl
No
h. Proposed measures to reduce or control transportation impacts, if any: hf elpl
NA
15. Public Serviceshf pM
a. Would the project result in an increased need for public services (for example: fire protection,
police protection, public transit, health care, schools, other)? If so, generally describe. 1tPjPJ
None.
b. Proposed measures to reduce or control direct impacts on public services, if any. hel
None.
16. Utilitieshf jpJ
a. Circle utilities currently available at the site:hf elpl
electricity, natural gas, water, refuse service, telephone, sanitary sewer, septic system,
other
None.
b. Describe the utilities that are proposed for the project, the utility providing the service,
and the general construction activities on the site or in the immediate vicinity which might
be needed. hel
None.
C. Signaturehf elpl
The above answers are true and complete to the best of my knowledge. I understand that the
lead agency is relying on them to make its decision.
Signature:
Name of signee: Jennifer Leach
Position and Agency/Organization: Environmental Education and Sustainability Coordinator,
City of Edmonds Parks and Recreation
Date Submitted: October 7, 2016
SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 13 of 13