STORM1_BLD20180955_19130 Olympic View.pdf0,V E[�, STO RM WATE R REVIEW COMMENTS City of Edmonds Engineering Division To: Applicant Date: August 6, 2018 Project Name: Maldazy SFR ' =71 1►ff in, T:�'i�Mill Address: 19130 Olympic View Dr Review Type: Building Permit (SFR) Submittal Date: 7/13/2018 Reviewer: Zack Richardson, PE City of Edmonds, Stormwater Engineer Recommendation: I recommend that BLD20180955 be withheld until the comments below are adequately addressed. I would encourage the applicant's team to consider additional infiltration testing in the area believe to currently infiltrate runoff; a lack of this information means the project may not take credit for what may be occurring naturally and results in additional infrastructure needs. Review Comments: 1. Drainage Report: The report notes a small manmade creek which is not reflected on the plans; update plans and report to show and identify the creek and any associated improvements and address how creek is fed and discharged. 2. Drainage Report: Provide additional information about existing site improvements and their classification as impervious surfaces and update retrofit mitigation value as needed: a. The existing "pond"; typically standing water or lined ponds are considered impervious surfaces. b. Gravel area north of pond; unclear if this is a walkway or the "manmade creek" but it is not shown on the plans and needs to be identified and addressed accordingly. 3. Drainage Report: Clean-up and clarify the interchanging use of trench drain/French drain in upstream analysis section. 4. Drainage Report: Expand description of drainage system to clarify how surface flows reach Fruitdale Creek and note any potential existing structure which could be impacted. a. Ensure description reflects, or debunks, the local depression noted in the geotechnical report. Page 1 of 2 5. Drainage Report: Include a table of impervious surfaces in the MR #5 section. 6. Drainage Report: "Not favorable" infiltration rates may not be sufficient to declare bioretention infeasible; revise report to list an infeasibility criteria from Edmonds Addendum Appendix A specifically or propose bioretention design. Provide supporting information as needed. 7. Drainage Report: Include a sizing calculation for each BMP based on the square footage of impervious proposed to be routed to it; trench may exceed this length, but the minimum required length must be established in the report. 8. Drainage Report: It is unclear why the engineer routed more than 700 square feet of impervious to the concentrated dispersion BMP; while mitigation is only required for 25% of the surface, the BMP must be designed per standard which restricts only 700 SF per outfall. Revise to a dispersion trench if over 700 SF and/or revise grading as needed to isolate 700 SF of impervious surface runoff. 9. Drainage Report: Update report (and plans) to discuss or show how the vegetated flow path meets the required conditions (max sloping, existing vegetation, etc). 10. C2.0: Update sheet to show proposed grading (ie. proposed contours), and identify trees requiring removal: a. Note that the dispersion system for the driveway appears to require additional tree removal which could be avoided. 11. C2.0: Add notes/callouts as needed to clarify that all disturbed areas are to be restored with BMP T5.13 and add details/specifications sufficient enough for the contractor to install soils meeting the requirements of the BMP. 12. C3.0: Update plans to show the location and full length of vegetate flow path from each BMP with dimensions or notes as needed. 13. C3.0: Replace "downspout" with "driveway" in the pipe callout for the driveway dispersion system (east of house). 14. C3.0: If trench drain is new, additional saw cutting may be required; update callout as needed, show saw cut limits, and update impervious surfaces values (replaced vs existing) as needed. 15. C3.0: Provide enough grading information (including top of drain elevation), and/or add curbing as needed, to show how driveway runoff will be directed to the drain as intended. 16. C3.0: List the top elevation of the dispersion trench (assumed to be equal to CB rim) but should be listed separately. 17. C3.0: Add note: "Footing drains shall be set at XX.XX' or above." And replace XX' with a value 6" greater than the top of dispersion trench elevation (ie. ensure contractor maintains 6" freeboard above full dispersion trench). 18. C3.0: Add note/callout along frontage where cuts are planned: "Maintain or restore existing road surface drainage controls (curb, berm, etc)." Page 2 of 2