Loading...
Stormwater Memo.pdfRAS Engineerin To: JoAnne Zulauf City of Edmonds Engineering Division From: Rob Long, PE RAM Engineering Subject: Cheeks Short Plat- Lot 2— 22922102nd pl W Stormwater Memo RAM Job No. 15-016 ro- orandum Date: October 7, 2016 T 2010 i� i"l P:.ti'th��I')t"f3V1( urR" Jly® OF (.ted i;m This memo provides the design analysis of the stormwater drainage control system for Lot 2 of the Cheeks Short Plat (22922 102nd PI W). A gravelless chamber system is proposed to control the proposed addition of 3,500 sf of impervious area for Lot 2. A site specific 2.0 in/hr design infiltration rate was determined by the geotechnical engineer, The stormwater gravelless chamber has been sized using the City of Edmonds Simplified Sizing Tables (handout #E72 -B).. The below tables provide the sizing information for the infiltration drywell systems. Project Area Summary: Proposed Impervious = 3,500 sf Building Rooftop, Covered Deck and Patio (roof line) = 2,860 sf Uncovered Patio and Walks = 120 sf" Driveway (pollution generating) = 520 sf EGINEE I Individual Lot Gravelless Chamber Sizing Summary: Individual Lot Total Impervious = 3,500 sf Required Chamber Length (3,500 sf x 0.014)1 49.0 ft Required Chamber Storage (49.0 ft @ 2.6 cf/ft) 127.4 cf Required Chamber Surface Area (49.0 ft @ 2.8 sf/ft) 137.2 sf Proposed System Hancor Arc 36 HC Storage 63.0 ft Provided Chamber Storage [63.0 ft @ 2.04 cf/ft (10.7 cf / 5.25 ft)z ] 128.5 cf Provided Chamber Surface Area [63.0 ft @ 2.34 cf/ft (12.27 cf / 5.25 ft)Z ] 147.4 sf Gravelless Chamber Size: 63.0 ft long Hancor Arc 36 HC2 1. 1.4% impervious surface sizing factor per Edmonds simplified sizing charts (with 2.0 in/hr soils and Category 2 Site) 2. See Hancor Arc 36 HC specification brochure (segment length 63 in., capacity 10.7 cf, open bottom area 12.27 sf) Infiltration Trench Design Criteria per Edmond's Handout #E72B: Design Criteria for All BNNIPs • These BMPS shall not N used in: The North Edmonds Earth Suhsidence and Landslide Hazard Area (ESLHA)' Upgradient (east) of the ESLHA In a Landslide Hazard Areal Within 5 feet ol'property lines and easements Within 10 feat from underground storage ranks Within 50 feet from proposed or existing septic sysleins or drain fields. Where the depth io the top of tie: seasonal groundwater level is less than I foot from the bottom of the facility. • The BNIP most inect the following setback requirements front buildings: - if runtiffis front an area less than 50) square feet, setback is 5 feet from .1 SITUClUre without a basement and 10 fee[ fora sirticuire with a basement. - If runoff is front ;in area greater than or equal to 5.0)0 square feet. a structure shall not interact with a 114orizontal: lVerlical slope from the bolloin edge ofthe facility. Minimum 5 ket froin a structure without a basement and 10 feet for a structure with it basenient. • An overflow path intisi be specified such that runoffabove the racilky's design capacity does not cause: Flooding of building or emergency access Erosion or downstream sedi inentalion Slope failure, 101-7116 Attachments: A. Edmond's Handout #E72B, Figure A-4 Typical Gravelless Chamber Detail B. Hancor Arc 36 HC System Brochure (2 pages). RAM Engineering 1653113 1h Ave W, Suite A108 Lynnwood WA 98037 (425) 678-6960 RAMengineeringinc corn Sizing Factor (`<c of contributi1w, Native Soil Desi -0n imperviousarea)Infiltration Rate Category Category BMP Facility Overflow Depth (inche 4 -hour) I Sites, 2 Sites Sizing Equation 0.25 3.7% 3.746 . ....................... . . . ......... . ..... ......... .. . U.._ 2,706 2-7% .......... - , -- Gsavelles,� Chamber Lerielli, (feet) NA 1.0 1.9% 1.9% Impel viotis Area (square feet) x Chamber — - - - - ---------- Sizitig Factor (%)100 I.i% 1.6% .......... . BMP leng th is calcu hied as a function of i nijxrvious area drai a ing to i 0: BMP Length (1,M) = Impervious Area (situare feel i x Sizing Faclor Design Criteria for All BNNIPs • These BMPS shall not N used in: The North Edmonds Earth Suhsidence and Landslide Hazard Area (ESLHA)' Upgradient (east) of the ESLHA In a Landslide Hazard Areal Within 5 feet ol'property lines and easements Within 10 feat from underground storage ranks Within 50 feet from proposed or existing septic sysleins or drain fields. Where the depth io the top of tie: seasonal groundwater level is less than I foot from the bottom of the facility. • The BNIP most inect the following setback requirements front buildings: - if runtiffis front an area less than 50) square feet, setback is 5 feet from .1 SITUClUre without a basement and 10 fee[ fora sirticuire with a basement. - If runoff is front ;in area greater than or equal to 5.0)0 square feet. a structure shall not interact with a 114orizontal: lVerlical slope from the bolloin edge ofthe facility. Minimum 5 ket froin a structure without a basement and 10 feet for a structure with it basenient. • An overflow path intisi be specified such that runoffabove the racilky's design capacity does not cause: Flooding of building or emergency access Erosion or downstream sedi inentalion Slope failure, 101-7116 Attachments: A. Edmond's Handout #E72B, Figure A-4 Typical Gravelless Chamber Detail B. Hancor Arc 36 HC System Brochure (2 pages). RAM Engineering 1653113 1h Ave W, Suite A108 Lynnwood WA 98037 (425) 678-6960 RAMengineeringinc corn Attachment A. Edmond's Handout #E728, Figure A-4 Typical Gravelless Chamber Detail Profile View WAhffU11LVY1#U Solid hd with sufface access s�8,.aoP�a �.rekC TRENCH t(Nor HP 4M Ur x �ova� 4 vb bl VY0 D" -VJ UD lam FT Or DEPT)i BELOW LLDCW Cross -Section .w�.I'117-11 t ;�. � 1 �,I FiA 11VC HUI IkJ:+CPILL ,.... RAIMirj 10 W cubic c11c-s I he �nTilc�ativcinfiltFUtiOn rosu face I� lmcsi foot eballfigur t lcssa 6 s Void zpmcp�� F pcs [inC91• foot tnlxrtMl beat it�ltm�t eet ear be �1 The following products are known to mcet these glavelless chamber ciitwis i Carfiltsaalaal 11-8�1a CalA.-ity by lnfilga ato% systems, Inc. I rt tc t, ba tt#zcrt Nigh Capacity by k aort or, Inc. Stormtechtr SC -310 by In£tltralor Systems. Inc Figure A-4. Tvpical grarelless chamber (Figure 5.27 in Appendix 5A of the Kitsap Count. Storialroler Mrrnagenrent Design.,Vemmil [ itsap "ount% 1.9971.). A-1 RAM Engineering 1653113th Ave W, Suite A108 Lynnwood WA 98037 (425) 678-6960 RAMenginee ringinc.conn intrusive installations. The Arc 36 HC septic leaching chamber is a sturdy, lightweight plastic unit that combines maximized infiltrative surface area and storage capacity with an improved structural design to handle most any conventional leachfield system challenge without sacrificing performance This unique combination allows for increased effluent dispersal installation and simplified contouring capabilities, UUFTNIT��� • Injection -molded from High Density Polyethylene (HDPE) for lightweight and sturdy design • 20 -degree integral articulating joint that is ideal for either straight or contoured septic leachfield applications • True corrugated chamber design eliminates flat surfaces and provides increased load bearing capability in the trench • Designed to accommodate both gravity -fed anA pressure -dosed systems • 'Lock and Drop' joint provides a more positive connection during installation and backfill • A universal inlet/outlet end cap • Inspection vent ports on every unit with easy-to-4emove knockouts for maximum job site flexibility • Convenient five-foot lengths are easy to handle • Quickly installed by one person into three-foot wide trench or bed applications component which snaps in place to allow side entry at any joint throughout the trench line Diamond plate texture increases slip resistance and enhances ease of installation B-1 RAM Engineering 1653113 1h Ave W, Suite A108 Lynnwood WA 98037 (425) 678-6960 RAMengineeringinc.com BLUE STRIPE: LEADING THE WAY. ................ — DIRECT CONTACT Customer Service 988 -FOR PIPE (367-7473) Fax 898 -FAX PIPE (329-1473) 24 hours A day ELECTRONIC MEDIA Wob Site FIM marker and awlication-snecific information and the latest, industry news at our On -Line Pfueline - www.hancor,com 01 2?�9 U 4 cwis? iJ-w, - T,— " C-dtb, & Sal. .4Mbk - W FLY—