Loading...
Stormwater Review Comments.pdf City of Edmonds TH 121 5 AVENUE NORTH EDMONDS, WA 98020 (425) 771-0220 FAX (425) 771-0221 Website: www.ci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning • Building • Engineering Storm Review Corrections Permit : # BLD20071104, 1106, 1107, 1108, 1109, 1110, 1111, 1112, 1113, 1114, Date: 1115, 1116, and 1117. 11/28/07 Project Name/Address: Arbor Court Townhomes/23820 Edmonds Way Contact Person/Address/Fax: _ Jean Morgan/11207 Fremont Ave N, Seattle, WA, ____________________________________________ 98133/Fax: (866) 847-6420 Reviewer: Division: Blaine Chesterfield Engineering During review of the subject submittal it was found that the following information, corrections, or clarifications will need to be addressed: 1. Overall a very good job on the storm drainage calculations. 2. More information is needed on the sediment pond in the drainage report. For instance what are the side slopes on the pond? Is the 645 sq ft surface area at the bottom of the pond or the water surface area? What is the minimum depth of the pond for sediment storage? 3. The detention system only needs to be designed to detain for the 10-yr and 100-yr, 24 hour design storms in this area. The reason for the reduced detention is that the drainage from this site stays in a piped conveyance system all the way to Puget Sound. This would reduce the size of your detention system however you can choose to continue detaining at a higher level. Because the drainage is piped directly into Puget Sound Water Quality is required. 4. Any construction activity on a site larger that one acre may require a DOE Stormwater General Construction Permit Notice of Intent (NOI). As part of the City of Edmonds NPDES (National Pollutant Discharge Elimination System) Phase II Permit we are required to notify applicants of the need to get a construction NOI. The NOI is a DOE requirement and any questions regarding it should be directed to them. Here is the link to the DOE's NOI website http://www.ecy.wa.gov/programs/wq/stormwater/construction/ The website has information on the NOI, the application form, and contact information. Please resubmit three copies of the revised plans/documents to a Development Services Coordinator. You may contact me at 425-771-0220 if you have specific questions regarding these plan corrections.