Stormwater Site Plan Report.pdf-I; 4flko civil & structural engineering & planning RESUB Miller Residence 110 Pine Street Edmonds, WA 111112017 C'MILIES WFIH APPLICABLE CI 1Y ,W P VAIA ff" Vi C 0 D E 250 4th Ave S Ste 200 CG Project No.: 16211.20 Edmonds, WA 98020 Phone: (425) 778-8500 Fax: (425) 778-5536 Miller Residence 16211.20 Stormwater Site Plan Report January 11, 2017 Page 2 of 4 Scope of Work The goal of this project is to construct an infiltration system to mitigate the existing impervious areas on a site located at 110 Pine Street in Edmonds, WA. The site consists of a single family residence covering 1,835 square feet and a garage with a small living area above it, consisting of 1,036 square feet. There are two driveways into the site. Hard surfaces other than the buildings consist of brick, asphalt, and gravel and total to 2,117 square feet. The total impervious surface is 4,932 square feet Drainage Considerations The project is categorized as a Category 1 Small Site. This means that Low Impact Development per City of Edmonds Handout #E72b can be used in facility sizing. Table 5 requires that a 1.5 foot deep infiltration trench be of a length equal to 2.3% of the impervious area. 4,932 total impervious area x 0.023 =114 lineal feet of trench required ESC Analysis and DesiRrl A filter fabric fence will be installed along the entire downhill sides of construction where shown on the plans. The filter fabric fence will be checked periodically during the wet season. It will be inspected during and after any heavy rainfall. Damage will be repaired prior to leaving the site. The fence shall be removed within 30 days after the site has been stabilized. Any disturbed areas resulting from construction or removal of the erosion control measures shall be stabilized. If possible, the clearing and land alteration work will be scheduled in the dry season. Trapped sediment will be removed or stabilized on site. It is expected that a construction entrance will not be needed due to the small nature of the project (only approximately 20 cubic yards of grading anticipated). The two existing driveways shall be used as access to the site. Attachments • Vicinity Map • Aerial Photograph • Infiltration Table * Geotechnical Report 250 4th Avenue South, Suite 200 C Edmonds, WA 98020 ENGINEERING ph. 425.778.8500 1 f. 425.778.5536 www.cgengineering.com Miller Residence 16211.20 January 11, 2017 Stormwater Site Plan Report Page 3 of 4 Figure I-1: Vicinity Map 250 4th Avenue South, Suite 200 Edmonds, WA 98020 ������ ph. 425.778.8500 1 f. 425.778.5536 www.cgeng!neering.com Miller Residence 16211.20 January 11, 2017 Stormwater Site Plan Report Page 4 of 4 Figure 1-2: Aerial Photograph 250 4th Avenue South, Suite 200 C C Edmonds, WA 98020 ph. 425.778.8500 1 f. 425.778.5536 ENGINEERING www.cgengineering.com Table 5. Bioretention and Infiltration BMP Sizing Factors. Sizing factors developed to limit the post -development 10 -year recurrence interval flow to 0.25 cubic feet per second (cfs) per acre of impervious surface area. Sizing factors developed to limit recurrence interval flow rates to: 2yr=0.07 efs/acre; IOyr-0.25 cfs/acre; and I OOyr--0.45 cfs per acre of impervious surface area. BM1' area is calculated as a 111ntsction of inuperviouis area draining to at: BMP Ara ('square feet) = Impervious Area (square feet) sa Sizing Factor (%)/100. Sizing, factors are for bioretwition facility bottoms area. Total footpriint area may be calculated based on .side slopes (MAV), ponding depth, and freeboard. BMP length is calculated ars a function of impervious area draining to it: BMP Length (feet) = Impervious Area (square feet) x Sizing Factor (%)/100. Revised 12/21/2015 E72B - BMP Sizing Handout page 10 of 17 Sizing Factor Native Soil (% of contributing BMP Facility Overflow Depth Design impervious area p ) • Sizing Equation Infiltration Rate Category 1 Category (inches/hour) Sites ° 2 Sites b 0.25 9.7% 9.7% 0.5 6.8% 6.8% 6 inch ponding depth __ _ 1.0 5.0% ..... _.... 5.2% 1.5 4.1% 4.4% Bioretention 2.0 3.6% 3.9% Bioretention Bottom Area (square ° i feet) = Impervious Area (square Cell 0.25 6.2% ............ 6.2% feet) x Sizing Factor (%)/100 0.5 4.2% 4.2% 12 inch ponding depth 1.0 3.1 % 3.2% ............. 1.5 _ 2.5% -� 2.6% 2.0 2.2% 2.3% 0.25 9.1% 9.1% 0.5 6.2% 6.2% 1.5 foot depth of aggregate 1.0 3.8% 4.0% 1.5 2.9% 3.1% Infiltration 2.0 2.3% 2.9% Infiltration Trench Length (feet) _ Trench ` o ° Impervious Area (square feet) x 0._5 5.4 /0 5.4 /o Sizing Factor (%)/100 ° 0.5 4.0% 4.0% 3 foot depth of aggregate 1.0 2.6% 2.6% 1.5 2.1% 2.1% 2.0 1.8% 2.0% 0.25 3.7% 3.7% 0.5 2.7% 2.7% Gravelless Chamber Length (feet) Gravelless NA 1.0 1.9% 1.9% = Impervious Area (square feet) x Chamber Sizing Factor (%)/100 1.5 1.5% 1.6% 2.0 1.3% 1.4% 0.5 6.2% 6.2% 1.0 4.3% 4.4% 4 foot depth ... .............. 1.5 o3.6%o.... 3.5 /0 Di veli Area (square feet 7^ (9 ) _ Impervious Area (square feet) x Drywell ` 2.0 3.0% 3.1% Sizing Factor (%)/100 0.5 4.7% 4.8% 1.0 3.4% 3.5% 6 foot depth 1.5 2.8% 2.9% Sizing factors developed to limit the post -development 10 -year recurrence interval flow to 0.25 cubic feet per second (cfs) per acre of impervious surface area. Sizing factors developed to limit recurrence interval flow rates to: 2yr=0.07 efs/acre; IOyr-0.25 cfs/acre; and I OOyr--0.45 cfs per acre of impervious surface area. BM1' area is calculated as a 111ntsction of inuperviouis area draining to at: BMP Ara ('square feet) = Impervious Area (square feet) sa Sizing Factor (%)/100. Sizing, factors are for bioretwition facility bottoms area. Total footpriint area may be calculated based on .side slopes (MAV), ponding depth, and freeboard. BMP length is calculated ars a function of impervious area draining to it: BMP Length (feet) = Impervious Area (square feet) x Sizing Factor (%)/100. Revised 12/21/2015 E72B - BMP Sizing Handout page 10 of 17 STORMWATER INFILTRATION LETTER LOCKE INFILTRATION EDMONDS, WASHINGTON PREPARED FOR MR. SYDNEY LOCKE Main OiFlce 17311 — 13e Avenue NE, A-500 Woodinville, WA 98072 (425)48&1669 FAX(425)481-2510 (425) 337-1669 Snohomish County February 22, 2013 Mr. Sydney Locke 110 Pine Street Edmonds, WA 98020 Stormwater Infiltration Letter Locke Infiltration Edmonds, Washington NGA File No. 870913 Dear Mr. Locke: NELSON GEOTECHNICAL ASSOCYATES� INC. GEOTECHNICAL ENGINEERS & GEOLOGISTS Engineering -Geology Branch 437 East Penny Road Wenatchee, WA 98801 (509) 865-7696 FAX (509) 665-7692 This letter documents our explorations and provides our opinions and recommendations for the feasibility of stormwater infiltration at your existing residence located at 110 Pine Street in Edmonds, Washington, as shown on the Vicinity Map in Figure 1. INTRODUCTION The site is currently occupied by a single-family residence within the eastern portion of the site with a detached garage structure and a daylight basement within the eastern portion of the site. We understand that you plan to direct the roof and footing drains from the existing residence and detached garage to a new infiltration system within the site. The existing site conditions and proposed infiltration areas are shown on the Site Plan in Figure 2. We have been requested by your designer to evaluate the infiltration capacity of the on-site soils for use in designing a new stormwater control system. For our use in preparing this letter, your civil engineer, CG Engineering has provided us with a site plan titled "Locke Residence," dated August 7, 1995, prepared by Albert H. Cohen Design Company. This site plan shows the existing site conditions, property boundaries, and topography. Stormwater Infiltration Letter Locke Infiltration Edmonds, Washington February 22, 2013 NGA File No. 870913 Page 2 SCOPE The purpose of this study is to explore and characterize the subsurface conditions within the site and to provide opinions and recommendations for stormwater infiltration. Specifically, our scope of services includes the following: 1. Review existing soils and geologic maps of the area. 2. Explore the site subsurface soil and groundwater conditions with backhoe -excavated test pits. Backhoe was subcontracted by NGA. 3. Perform grain -size analysis on representative soil samples. 4. Provide recommendations for stormwater infiltration per 2005 DOE Strmw;t Mana erne t in We WowbiLigton manual. 5. Provide recommendations for infiltration system installation. 6. Document the results of our explorations, findings, conclusions, and recommendations in a written geotechnical engineering letter. SITE CONDITIONS Surface Conditions The site is an approximate 0.27 -acre, irregular-shaped lot that is bounded to the north by Pine Street to the east and south by residential properties, and to the west by State Route 104. A single-family residence currently occupies the eastern portion of the site with a detached garage structure and daylight basement within the western portion of the site. The site is relatively level to gently sloping from the southeast corner to the northwest comer of the property. The site is generally vegetated with grass, decorative landscaping and sparse trees. We did not observe surface water within the site during our visit on February 11, 2013 Subsurface Conditions Geology: The site is mapped on the Gepip is a of the Edrnonds st nd P of the monde +i t uadMgle, Washin on, by James Minard, (USGS, 1983). The site is mapped as Whidbey Formation (Qw). The Whidbey Formation deposits are described as bedded, compact, commonly oxidized medium to coarse grained sand. Our explorations generally encountered fine to coarse grained sand with varying amounts of gravel and silt generally consistent with the description of Whidbey Formation deposits. NELSON GEOTECHNICAL ASSOCIATES, INC. Stormwater Infiltration Letter Locke Infiltration Edmonds, Washington February 22, 2013 NGA File No. 870913 Page 3 The Soil SuMy of Sn omi Cou t ea shin o by the Soil Conservation Service (SCS) was also reviewed to determine the on-site soils. The site surface soils were classified using the SCS classification system as Everett gravelly sandy loams, 0 to 8 percent slopes. These soils are listed as having a moderate to high hazard of water erosion. Our explorations generally encountered fine to coarse grained sand with varying amounts of gravel and silt generally consistent with the description of Everett gravelly sandy loam. Explorations: The subsurface conditions within the site were explored on February 11, 2013 by excavating three test pits with a backhoe. The approximate locations of our explorations are shown on the Site Plan in Figure 2. A geologist from Nelson Geotechnical Associates, Inc. (NGA) was present during the explorations; collected samples of the soils encountered, and maintained logs of the explorations. The soils were visually classified in general accordance with the Unified Soil Classification System, presented as Figure 3. The logs of the explorations are presented as Figure 4. Each of the test pits exposed approximately 1.0 to 1.5 feet of topsoil. Underlying the topsoil in all of our test pits, we encountered medium dense to dense, red -brown to gray -brown fine to coarse sand with varying amounts of gravel and silt that we interpreted as native granular soils. Below the granular soils at a depth of 7.0 feet below the existing ground surface, we encountered dense, gray silty fine to medium sand and gravel interpreted to be native till deposits. Test Pits 2 through 3 were terminated within the native granular soils and within the native till deposits at a depth of 8.0 feet below the existing ground surface. Hydrologic Conditions Moderate groundwater seepage was encountered in Test Pit 4 at a depth of 7.0 feet below the existing ground surface. We interpreted this seepage as perched groundwater. Perched groundwater typically occurs where permeable soils rest on low permeability soils. Groundwater can originate beyond site boundaries and slowly migrate within permeable soil layers and be confined on top of low permeable soils. Perched groundwater does not necessarily represent a regional aquifer. NELSON GEOTECHNICAL ASSOCIATES, INC. Stonnwater Infiltration Letter Locke Infiltration Edmonds, Washington February 22, 2013 NGA File No. 870913 Page 4 LABORATORY ANALYSIS We performed three grain -size analyses on selected soil samples obtained from the site. Laboratory tests were performed on samples taken from Test Pit 1 at 6.0, Test Pit 2 at 2.5 feet and Test Pit 3 at 3.0 feet. The results of the sieve analyses are presented as Figures 5 through 7. CONCLUSIONS AND RECOMMENDATIONS It is our opinion that the subsurface soils below approximately 1.5 feet are suitable for stormwater infiltration. The subsurface soils are generally sand with varying amounts of gravel and silt. Based on the laboratory analysis, the soils encountered in our test pit explorations meet the classification of sand in the USDA Textural Triangle. Table C-1 in 2010 water Code Su le nt to onds Co uni Devel-ppMea Code Cha r 1.8.30 indicates a long-term design infiltration rate of two inches per hour for soils classified as sand. This long-term design infiltration rate includes a correction factor of four. In our opinion, a long-term design infiltration rate of two inches per hour for the on-site sand soils should be feasible for the design of the stormwater infiltration system within the sand and gravel soils found on site. We recommend that the infiltration trench extend through the upper surficial topsoil material to expose the clean native sand soils, which were encountered at roughly 1.0 to 1.5 feet below the surface in our explorations. The storm water management system should be designed in accordance with the City of Edmonds regulations. The stormwater manual recommends a five-foot separation between the base of an infiltration system and any underlying bedrock, impermeable horizon, or groundwater. We did not encounter groundwater or an impermeable layer to the extent of Test Pits 2 and 3 that extended approximately 8.0 feet below the existing ground surface. However, we did encounter an impermeable glacial till layer in Test I and perched groundwater in Test Pit 4 at a depth of 7.0 feet below the existing ground surface. It is therefore our opinion that an infiltration system with a depth of two feet in the northwest and southeast comer of the property and a depth of three feet within the south-central and southwestern portions of the property should satisfy the design manual. We should be retained to evaluate the infiltration system design and observe trench excavations. NELSON GEOTECHNICAL ASSOCIATES, INC. Stormwater Infiltration Letter Locke Infiltration Edmonds, Washington February 22, 2013 NGA File No. 870913 Page 5 USE OF THIS LETTER This letter was prepared for Sydney Locke and his agents for their use in planning and budgeting the above -referenced project only. Our services included an evaluation of the infiltration capability of the site soils at specific locations, and should not be considered as an in-depth geotechnical study of the site. This letter may be used for bidding and estimating purposes, but our letter, conclusions, and interpretations should not be construed as a warranty of the subsurface conditions. The subsurface conditions between explorations may vary. A contingency for changed conditions should be incorporated into the project plans. We recommend that NGA be retained to review the design and provide monitoring and consultation services during construction to confirm that the conditions encountered are consistent with those indicated by the explorations, to provide recommendations for design changes should the conditions revealed during the work differ from those anticipated, and to evaluate whether or not earthwork activities comply with contract plans and specifications. We should be contacted a minimum of one week prior to construction activities and could attend pre -construction meetings if requested. Within the limitations of scope, schedule, and budget, our services have been performed in accordance with generally accepted geotechnical engineering practices in effect in this area at the time this letter was prepared. No other warranty, expressed or implied, is made. Our observations, findings, and opinions are a means to identify and reduce the inherent risks to the owner. .•. NELSON GEOTECHNICAL ASSOCIATES, INC. Stormwater Infiltration Letter Locke Infiltration Edmonds, Washington February 22, 2013 NGA File No. 870913 Page 6 We appreciate the opportunity to provide service to you on this project. If you have any questions or require further information, please call. Sincerely, NE iCV= ECHNICAL ASSOCIATES, INC. LEE S. F : I : ;H Lee S. Bellah, LG P1 Khaled M. Shawish, PE Principal LSB:KMS:kmn Seven Figures Attached Two Copies Submitted cc: Jared Underbrink — CG Engineering (one copy) NELSON GEOTECHNICAL ASSOCIATES, INC. oject Number ir""""kA ASSOCIATE3�Nc. NELSON GEOTECHNICAL No. Date Revision By CK 870913 Locke Residence Infiltration `''�hl�i1 7117/13 1 odpinad I% KM Vicinity Map GEOTECHNICAL ENGINEERS & GEOLOGISTS Figure 1 l+atxll"M «ice ^�*.maarr�esmv�atio eaa, VICINITY MAP N Not to Scale o a � Ln Fmyor _ Edmonds to Marafi Co 4y 11enedlri n Vt W � C � 1a4 m Project fn Hemlock Way 3 0 6 V I `G Site n 0� Saa,noN Lr o _ a V Pine SI Pine St Pine Sl n 8 � Pine S '^ Pal o Makah Rd Farsyln La n m 104) CA N 3 Ind A%o S "V $ ra n D F. PI 01 23 v r :sola Rd "W CWIO Rd Elm .St t!1 1a3; h N A. oject Number ir""""kA ASSOCIATE3�Nc. NELSON GEOTECHNICAL No. Date Revision By CK 870913 Locke Residence Infiltration `''�hl�i1 7117/13 1 odpinad I% KM Vicinity Map GEOTECHNICAL ENGINEERS & GEOLOGISTS Figure 1 l+atxll"M «ice ^�*.maarr�esmv�atio eaa, � z � fST 1 , 11 v X91 a o r 9 V1 C Y O " �aC, IT w != sa ICU x d + N / tl N (6 ti 00 + N - `i p Q CL $N RI II a Q i1 "-jD 4 ca o Z O CL W CL .I c wa w >v a N w ti "A �11� o l w } 0--0a c� + 3 c ' b a sect Numbe NELSON GEOTECHNICAL No. Date Revision By CK 870913 Locke Residence Infiltration NGA ASSOCIATES, INC. 1 2112113 OApinal LSD KMS Schematic Site Plan GEOTECHNICAL ENGINEERS & GEOLOGISTS 17311. MMAw.NE,A-000 Smhwfth CQ"YN25l337.1NY Figure 2 YY.oAnw..YYA9107YW—kt..XNWj(6W)754-ns* (175)4W1KSIFa.Y1-2S10 �.n WWIII.rei..aa UNIFIED SOIL CLASSIFICATION SYSTEM 1) Field classification is based on visual SOIL MOISTURE MODIFIERS: examination of soil in general GROUP accordance with ASTM D 2488-93. MAJOR DIVISIONS the touch GROUP NAME Moist -Damp, but no visible water. is based on ASTM D 2488-93. SYMBOL Wet - Visible free water or saturated, consistency are based on usually soil Is obtained from CLEAN GW WELL -GRADED, FINE TO COARSE GRAVEL COARSE - GRAVEL iject Number NELSON GEOTECHNICAL No. Date Revision GRAVEL GP POORLY -GRADED GRAVEL GRAINED MORE THAN 50 % GRAVEL GM SILTY GRAVEL LSB OF COARSE FRACTION Soil Classification Chart GEOTECHNICAL ENGINEERS & GEOLOGISTS SOILS RETAINED ON NO.4 SIEVE WITH FINES Figure 3 17311.1351,Aw.NF MW 31 1""C 111511x.1 wm M4KWAu0n W-a"wcnwwn 501 i1u2P51 GC CLAYEY GRAVEL SAND CLEAN SW WELL -GRADED SAND, FINE TO COARSE SAND (425)461151!Fa4AV2510 w .rmwgAirikkBu� SAND SP POORLY GRADED SAND MORE THAN 50 % MORE THAN 50 % RETAINED ON NO. 200 SIEVE OF COARSE FRACTION SAND SM SILTY SAND PASSES NO.4 SIEVE WITH FINES SC CLAYEY SAND FINE - SILT AND CLAY ML SILT INORGANIC GRAINED LIQUID LIMIT CL CLAY LESS THAN 50 % SOILS ORGANIC OL ORGANIC SILT, ORGANIC CLAY SILT AND CLAY MH SILT OF HIGH PLASTICITY, ELASTIC SILT INORGANIC MORE THAN 50 % PASSES LIQUID LIMIT CH CLAY OF HIGH PLASTICITY, FLAT CLAY N0.200 SIEVE 50 /° OR MORE ORGANIC OH ORGANIC CLAY, ORGANIC SILT HIGHLY ORGANIC SOILS PT PEAT 1) Field classification is based on visual SOIL MOISTURE MODIFIERS: examination of soil in general accordance with ASTM D 2488-93. Dry - Absence of moisture, dusty, dry to the touch 2) Soil classification using laboratory tests Moist -Damp, but no visible water. is based on ASTM D 2488-93. 3) Descriptions of soil density or Wet - Visible free water or saturated, consistency are based on usually soil Is obtained from interpretation of biowcount data, below water table visual appearance of soils, and/or test data. iject Number NELSON GEOTECHNICAL No. Date Revision By CK 870913 Locke Residence Infiltration NGA AssocIATES, INC. 1 2112/13 Odg(nel LSB KMS Soil Classification Chart GEOTECHNICAL ENGINEERS & GEOLOGISTS Figure 3 17311.1351,Aw.NF MW 31 1""C 111511x.1 wm M4KWAu0n W-a"wcnwwn 501 i1u2P51 (425)461151!Fa4AV2510 w .rmwgAirikkBu� LOG OF EXPLORATION DEPTH (FEET) USC SOIL DESCRIPTION TEST PIT ONE 0.0-1.0 TOPSOIL 1.0-7.0 SP BROWN -GRAY, FINE TO COARSE SAND WITH GRAVEL AND TRACE SILT (MEDIUM DENSE TO DENSE, MOIST) 7.0-8.0 SM GRAY, SILTY, FINE TO MEDIUM SAND WITH GRAVEL (DENSE, MOIST) SAMPLES WERE COLLECTED AT 3.5, AND 6.0 FEET GROUNDWATER SEEPAGE WAS NOT ENCOUNTERED TEST PIT CAVING WAS NOT ENCOUNTERED TEST PIT WAS COMPLETED AT 8.0 FEET ON 2/11/13 TEST PIT TWO 0.0-1.5 TOPSOIL 1.5-8.0 SP RED -BROWN TO GRAY, FINE TO MEDIUM SAND WITH TRACE GRAVEL AND SILT (MEDIUM DENSE TO DENSE, MOIST) SAMPLES WERE COLLECTED AT 2.5, 5.5, AND 8.0 FEET GROUNDWATER SEEPAGE WAS NOT ENCOUNTERED TEST PIT CAVING WAS NOT ENCOUNTERED TEST PIT WAS COMPLETED AT 8.0 FEET ON 2/11/13 TEST PIT THREE 0.0-1.5 TOPSOIL 1.5-8.0 SP RED -BROWN TO GRAY, FINE TO MEDIUM SAND WITH TRACE GRAVEL AND SILT (MEDIUM DENSE TO DENSE, MOIST) SAMPLES WERE COLLECTED AT 3.0 AND 7.0 FEET GROUNDWATER SEEPAGE WAS NOT ENCOUNTERED TEST PIT CAVING WAS NOT ENCOUNTERED TEST PIT WAS COMPLETED AT 8.0 FEET ON 2/11/13 TEST PIT FOUR 0.0-1.0 TOPSOIL 1.0-8.0 SP RED -BROWN TO GRAY, FINE TO MEDIUM SAND WITH TRACE GRAVEL AND SILT (MEDIUM DENSE TO DENSE, MOIST) SAMPLES WERE COLLECTED AT 3.0, 7.0, AND 7.5 FEET MODERATE GROUNDWATER SEEPAGE WAS ENCOUNTERED AT 7.0 FEET TEST PIT CAVING WAS NOT ENCOUNTERED TEST PIT WAS COMPLETED AT 8.0 FEET ON 2/11/13 LSB:KMS NELSON GEOTECHNICAL ASSOCIATES, INC. FILE NO 870913 FIGURE 4 O h(Dp�MN 0) 00 I T 1HJ19M ,kG 2:3NId 1N3M:13d O C T 0 2 w w 2 p J_ T Z w N_ co Z 0 T 0 0 T M U O h J_ LU z v _D 0 LU W m O U w z LL J C7 W of 0 U In w J m m 0 U Ject Number NELSON GEOTECHNICAL No. Date I Revision By CK 870913 Locke Residence Infiltration ----NGA ASSOCIATES, INC. , 2120/13 original DPN LsB Sieve Analysis GEOTECHNICAL ENGINEERS & GEOLOGISTS Figure 5 17311.10e1hA—MA-00 5nWw*CwMr(426)WQ-1M WmArnh. WA NOT! W ..kh"/CMm (OOO) N67lN (423) 4H -1N01 Fu 411.7610 1wn.nY.ggcYeh<om O 0 6 O C W F- W J O J z W N_ CO z O r O O �rrSa�wwlwu�r�w�rM�wnr��ss�u�aww� ®i�r�e a•w®r Mwra��w, _ O ;: r 11-1913MAG UBNId 1N30213d g U O H J w K LL 0 Q 0 w w m O U W z LL J C7 W O U m w J m m O U z O I- J o o \\N O M II C U 01n �3 c z o CO w a E 2 U N E Ui o J C C O O Ocu L a U a aI LU LO U) N z O � ~ W 0 H az X w Ject Nurnbe NELSON GEOTECHNICAL No. Date Revision By CK 870913 Locke Residence Infiltration NGA ASSOCIATES, INC. 1 2120!13 Orlglnal DPN LSB Sieve Analysis GEOTECHNICAL ENGINEERS & GEOLOGISTS Figure 6 17311.1351hAwMMM 2-h ftMC-*(177)73Q-1M Wmd -- WA OWn W.^ khO.M.1.W, (W MSITY7 (177)489•1NY/Fax461d710 —d.ap wh— N T 11-1013M AG �13N131N301t13d T d Co O O O O r O 0 T g U O J N w U O O W w O U W ZLL' J W O U w J co m O z _O o O O M J� 'a' cf) II U) WII fD � N C L) o 0cncn t v c z O m N H IL E � U � E U) 0 �. 0 ' O Co C C > 20 N N� 1 LL 4-1 QOo U) ch z Q ~ W 0 co OM = a. � aXz W J UO )ect Number NELSON GEOTECHNICAL No. Date Revision By I CK 870913 Locke Residence Infiltration �N A AssoclaTEs, INC. 1 2/20113 Orlglnal DPN LsB Sieve Analysis GEOTECHNICAL ENGINEERS & GEOLOGISTS Figure 7 17311-13&h AW. NF A40D &-k—ah M"Y(42a)aDAIN Wb.%,A., WA IND72 Wmr.kh"ICIWn(M) 33S73Dt (425) 416-161a IF. 491.7410 ww.nNrrwgwMrhoom