Loading...
Stormwater_Review Comments.pdfB ORG E N 8 1 IORT P LAT DRAINAGE CALCULATIONS Total Area of the Site = 0.475 Acres As per the Soil Survey of the Snohomish County Area, the entire site is Alderwood Gravelly Sandy Loam, which corresponds to a Type C soil. For calculation purposes, a Type "C" soil was used. EXISTING SITE: _ln�pervious Area: Existing House = 1,483 st. -EX44ing'W, 747-sf,—"" Total 4,709-9f. (0.109 Ae.) Pervious Area. "t b 3 s 0. Area = 0.475 (total) 0.366 Ac. CN = 81 0 a z.; 4c, Tc = 23.44 minutes 11 = 20 feet, 60 fect S = 27.5%,2.33% Developed .-Site. Onsite Area: Shared Driveway = 1,703 sE Lot I Driveway 1,000 st" --Lxi,&6ng-hm,sr— J,493 --s, Lot 2 Driveway = 1,150 sf Lot 2 house — — — — — — — —= 2800 sf. Total S,4-36 sf Offsite Area: FrontageImprovements 850 sE 009 4'roff 16 VS 0�rlz Total Impervious Area =.8,4-3-6 st. --1- 850 sf'. = 8�969sf- (0-206 Ac.0) 0.x..1' 0�303 Pervious Lima- 0,475 (total) - 0QW (ins p.) = 0-269 Ac. os 3;Me"Mov", *Rainfall I r�) "74,0) 2- Year =,,l-4fJ`m,: 10- Year = 2.00 in.: 100- Year =,k�60 in, Taken from the NOAA Atlas 2, Vol, JX, Figure 25 k0phivial maps for 2, 10, and 100 year storms Wl---',S'TERN ENQINEFI8, INC. PROJE"ICT: 06-745-A