Loading...
STRUCT BLDG.pdfwww.b2enginears.com 7516 NE 153rd Place NE Kenmore, WA 98028 (425) 296-2993 1514 -Pruett Residence Remodel RESPONSE TO CITY COMMENTS PROJECT NO: 1514 DATE:05/11/15 PREPARED BY: BASRI BASRI PE, SE eegn Criteria...... ... International Building Code (IBC) 2012 American Society of Civil Engineers (ASCE) 7-10 Project Description ....---------------- On sheet S-2 — Structural Plan& U� If "z" �,rna Abp pNyi���^Nd����";;✓!4iY d 15. Detail #1 — Main Floor a. Indicate on the plans the minimum required post to support the loads below the trimmer(s) between the two windows marked '43' in space '208'— Studio/Office. RESPONSE: SEE REVISED TYPICAL DETAIL FOR WALL OPENING FRAMING (DETAIL 23 OF S-4) SHOWINGS (2) TRIMMER STUDS. b. Clarify the callout for the 24x24 isolated footing to be used to support the north end of beam 'B2-3'— existing beam/3.5x11.875 PSL. It appears to be undersized for the loads anticipated by the represented construction. The loads noted in the provided structural calculations do not appear to account for the tributary load from the existing roof on the cantilevered end of the beam. The south end of the 'existing roof beam to remain' appears to also be bearing at the same location. RESPONSE: FOOTING HAS BEEN REVISED TO 30"X30" TO SUPPORT POST/BEAM 132-3. THERE IS AN EXISTING ROOF BEAM FROM GRID 3 TO 4.2 THAT HAS ITS OWN POST AND FOOTING. PLEASE SEE UPDATED PLAN DETAIL 1/S-2 AND 1/S-3. PLEASE SEE ATTACHED REVISED CALCULATIONS FOR 132-3 WITH ADDITIONAL CANTILEVER LOAD 16. Detail #2 — Upper Floor a. Provide on the plans a legend, or other description, indicating the meaning of the 'letter -P -in -circle' with arrow(s)- RESPONSE: PLEASE SEE REVISED PLAN DETAIL 1/S-2 AND 2/S-2 b. Clarify the represented 'structure' along the east wall of space "104'- Kitchen. A corresponding element could not be found on sheet 'A 201'— East Elevation. RESPONSE: ARCHITECT TO VERIFY On sheet S-2 and/or sheet S-3 — Structural Plans: 17. S-2 — Upper Floor — or S-3 a. Indicate on the plans the minimum required posts to support the loads below the west ends of the girder trusses supporting the 'truss girder or 5.25x14 PSL (RB -2)' over space '203' — Master Bedroom. RESPONSE: (3) 2X6 POSTS HAVE BEEN ADDED TO PLAN DETAIL 2/S-2 AND 1/S-3 b. Indicate on the plans the minimum required post to support the loads below the south end of the beam used to support the south girder truss over the south -most window marked 'A10' in the east wall of space '201'— Hall. RESPONSE: (3) 2X6 POSTS HAVE BEEN ADDED TO PLAN DETAIL 2/S-2 AND 1/S-3. PLEASE ALSO SEE REVISED TYPICAL DETAIL FOR WALL OPENING FRAMING (DETAIL 23 OF S-4) SHOWINGS (2) TRIMMER STUDS On sheet S-3 Structural Plans: 18. Roof Level a. Clarify the note "6,600 LBS OF TOTAL REACTIONS" at each end of the 'truss girder or 5.25x14 PSL (RB -2)' over space '203'— Master Bedroom. The load at the north end appears to be lower than that anticipated by the represented construction. RESPONSE: THE REACTION HAS BEEN CHANGED TO 7,000 LBS b. Clarify the callout for the 2x10s to be installed at 24 inches on -center and be used as roof rafters. They appear to be over spanned and fail in bending. RESPONSE: PLEASE SEE ATTACHED CALCULATIONS FOR RJ -1. 2X10 AT 24 INCH SHOWING IT IS ADEQUATE c. Clarify the represented 'structure' along the east wall of space '104'- Kitchen. A corresponding element could not be found on sheet 'A 20V — East Elevation. RESPONSE: ARCHITECT TO VERIFY d. Indicate on the plans the required minimum 'existing beam to be verified' used to support the loads over the east and west walls of the 'Kitchen' to guide proper construction and inspection,. RESPONSE: SEE REVISED NOTES ON 2/S-2 AND DETAIL 15 AND 16 OF S-4 e. Clarify the placement of the notes "Existing beam to be verified..." on the 'Roof Level' framing detail. The construction represented on detail '10/S-4' and '15/S4' suggest that the note might be more appropriate on 'Detail #2'— Upper Floor — on sheet 'S-2'. RESPONSE: NOTES AND DETAILS HAVE BEEN ADDED TO 2/S-2 AS WELL. On sheet S-4 — Structural Details: 19. Detail #1 - Indicate on the plans the minimum required width of the foundation wall to guide proper construction and inspection. RESPONSE: FOOTING WIDTH DIMENSION OF V-4" HAS BEEN ADDED TO THE FRAMING PLAN 20. Details #10, #15, and #16 — Indicate on the plans the required minimum attachment of the 'bottom plate' of the 'extended and spliced' wall framing to the 'top plate' of the existing wall framing to resist lateral loads. RESPONSE: ADDITIONAL NAILING SIZES AND SPACINGS HAS BEEN ADDED TO THE DETAILS 21. Detail #14 — Clarify the callout for '(3)2x6 under post' below the midspan of the SIP roof. It does not appear to correspond to the construction represented on sheet 'S-3'— Roof Level. RESPONSE: NOTE HAS BEEN REVISED TO STATE: " (3) 2X6 UNDER TRUSS GIRDER" FOR CLARITY 22. Detail #18 — Indicate on the plans the required installation of blocking between the wall studs to be used for the attachment of the '2x ledger'. RESPONSE: BLOCKING IS NOT NEEDED SINCE THE TIMBERLOK SCREWS ARE INSTALLED DIRECTLY TO THE STUDS. THE SHEATHING PROVIDES LATERAL STABILITY TO TO THE STUDS 23. Detail #19 — Indicate on the plans the required installation of blocking between the wall studs to be used for the attachment of the '2x ledger'. BLOCKING IS NOT NEEDED SINCE THE TIMBERLOK SCREWS ARE INSTALLED DIRECTLY TO THE STUDS. THE SHEATHING PROVIDES LATERAL STABILITY TO TO THE STUDS