Loading...
SummeMech1.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: March 6, 2008 TO: Terry Summe th 7614 195 Street SW, Suite 200 Edmonds, WA 98026 FROM: Ann Bullis, Assistant Building Official RE: Plan Check # 2008-0138 Project: Summe Medical Center -- Mechanical th Project Address: 7614 195 Street SW, Suite 200 During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Provide written responses to each comment and where changes can be found on the plans. Please resubmit to Marie Harrison, Permit Coordinator. 1.Provide manufacturerÂ’s installation instructions and information for the heat pump. 2.Update plan to match latest revised architectural plan (mechanical contractor can redline the plans). 3.Note cfm of restroom exhaust fans, and manufacturer specs showing maximum exhaust duct length for fan in restroom 007B.