sunset patch compaction _20140610095523.pdfEarth Solutions NW, LLC
LETTER OF TRANSMITTAL
To: The Echelbarger Co., Inc.
22833 Bothell -Everett qv5,.#ZQL-,-...
Bothell, WA 98021
Attn: Mr. Matt Echelbarper
Email, mebeo et
No, of
S N W No,: M. 3020
Project: Fox Glove
Comments:
CC:
1: Alderwood WWD —Phil Thornlund
Z
3
Transmitted By: Earth Sollutions,NNV,
PA Ray Coodas
ATTN:
ATTN:
FATTN:
ATTN:
1805 —136 1h PI NE, Suite 201 Bellevue, WA 98005
(425) 284-3300 FAX (425) 449-4711 Toll Free (866) 336-8710
Earth Solutions NWLLC
Fiejld Rep.
Report No.
3020.00
g 1805 136' Place NE, FAX:
Time On Site
Suite 201 (425) 449-4711
Date
Bellevue, WA 98005 TOLL FREE:
8:15
(425) 449-4704 (866) 366-8710
FRI
DAILY FIELD REPORT
TravelTime
.... ... .
1.25
_ . ....
Project Name .... ..., _...
ob Loc .. on. .. ... ..........
. Jan
........ -
Fox Glove (Sunset Projects
336 Sunset Avenue N, Edmonds
General Contractor
General Contractor's Superintendent
Inc.
BDZ
--11111111111111
Grading Contractor Grading Foreman
C.J.
Project No.
Page of
Report No.
3020.00
111
(Sunset
Time Off Site
Date
Day of Week
10:00
5/30/14
FRI
_
............ ........ ...... ..... .
Weather
.... ... .
Maximum
Sunny, 50°F
Client / Owner
lbs,/cu,ft.
%
Ec_helbarger Company
_.
..........
Inc.
3
sitee
Received Onsite By
SG
Checked By /
/ t
Are approved Plans/Permits onsite YES NO Project No. Permit No.
Test
Reference
Maximum
Fill
Test Dry
% of
Number
Test Location
Elevation
Compaction
Dry Density
Moisture
Density
Maximum
Curve
lbs,/cu,ft.
%
lbs./cu.ft,
Dry Density
3
Sewer Backfill. Sunset (see drawing)
SG
1
136.0
'8.97
131.8
97
1
,
, ,
. .5 _
...131 9
98
5
............ ....u_.....,
SG
.. ...............136.0..
3
96
Supplementary Report:
As requested, an ESNW representative was onsite to observe earthwork activities and collect compaction tests on
sewer backfill located in Sunset Ave N.
Upon arrival, the contractor was in the process of removing the cold pack above the previously backfilled sewer line
running parallel to Sunset Ave N. ESNW observed the native silty sand and plt run backfill to be stable and
unyielding. The contractor used a larger drum roller to compact the backfill prior to asphalt placement. Compaction
tests on the backfill at the subgrade elevation indicated adequate compaction of at least 95% of the material's
maximum dry density at the locations tested. Please see drawing below for approximate test locations.
ESNW wil return when requested.
Eric Cutler
its
„"a ,
S ,,�J (10/%
'A -x 4t c to
N
z5! ..