Loading...
sunset patch compaction _20140610095523.pdfEarth Solutions NW, LLC LETTER OF TRANSMITTAL To: The Echelbarger Co., Inc. 22833 Bothell -Everett qv5,.#ZQL-,-... Bothell, WA 98021 Attn: Mr. Matt Echelbarper Email, mebeo et No, of S N W No,: M. 3020 Project: Fox Glove Comments: CC: 1: Alderwood WWD —Phil Thornlund Z 3 Transmitted By: Earth Sollutions,NNV, PA Ray Coodas ATTN: ATTN: FATTN: ATTN: 1805 —136 1h PI NE, Suite 201 Bellevue, WA 98005 (425) 284-3300 FAX (425) 449-4711 Toll Free (866) 336-8710 Earth Solutions NWLLC Fiejld Rep. Report No. 3020.00 g 1805 136' Place NE, FAX: Time On Site Suite 201 (425) 449-4711 Date Bellevue, WA 98005 TOLL FREE: 8:15 (425) 449-4704 (866) 366-8710 FRI DAILY FIELD REPORT TravelTime .... ... . 1.25 _ . .... Project Name .... ..., _... ob Loc .. on. .. ... .......... . Jan ........ - Fox Glove (Sunset Projects 336 Sunset Avenue N, Edmonds General Contractor General Contractor's Superintendent Inc. BDZ --11111111111111 Grading Contractor Grading Foreman C.J. Project No. Page of Report No. 3020.00 111 (Sunset Time Off Site Date Day of Week 10:00 5/30/14 FRI _ ............ ........ ...... ..... . Weather .... ... . Maximum Sunny, 50°F Client / Owner lbs,/cu,ft. % Ec_helbarger Company _. .......... Inc. 3 sitee Received Onsite By SG Checked By / / t Are approved Plans/Permits onsite YES NO Project No. Permit No. Test Reference Maximum Fill Test Dry % of Number Test Location Elevation Compaction Dry Density Moisture Density Maximum Curve lbs,/cu,ft. % lbs./cu.ft, Dry Density 3 Sewer Backfill. Sunset (see drawing) SG 1 136.0 '8.97 131.8 97 1 , , , . .5 _ ...131 9 98 5 ............ ....u_....., SG .. ...............136.0.. 3 96 Supplementary Report: As requested, an ESNW representative was onsite to observe earthwork activities and collect compaction tests on sewer backfill located in Sunset Ave N. Upon arrival, the contractor was in the process of removing the cold pack above the previously backfilled sewer line running parallel to Sunset Ave N. ESNW observed the native silty sand and plt run backfill to be stable and unyielding. The contractor used a larger drum roller to compact the backfill prior to asphalt placement. Compaction tests on the backfill at the subgrade elevation indicated adequate compaction of at least 95% of the material's maximum dry density at the locations tested. Please see drawing below for approximate test locations. ESNW wil return when requested. Eric Cutler its „"a , S ,,�J (10/% 'A -x 4t c to N z5! .. COPY TO: CONTINUED ON NEXT PAGE J