Loading...
SW_Review_Comments.pdf City of Edmonds TH 121 5 AVENUE NORTH EDMONDS, WA 98020 (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning • Building • Engineering Stormwater Review Comments Permit : Date: # BLD20070210 10/03/2007 th Project Name/Address: Shubin – 16319 75 Place W Contact Person/Address/Fax: __ Erik Andersen /e-mail: eandersen@hwageo.com Reviewer: Division: Engineering Blaine Chesterfield During review of the subject submittal it was found that the following information, corrections, or clarifications will need to be addressed: 1. The calculations look good. 2. As Jeanie McConnell mentioned in her review comments. There will need to be a manhole (MH) on both ends of the detention system for maintenance. The 60-inch detention pipe should be connected to the MH by an adequately sized access pipe. 3. The plans need to include a profile view of the new detention system and a control structure detail. Please resubmit three copies of the revised plans/documents to a Development Services Coordinator. You may contact me at (425)771-0220 or chesterfield@ci.edmonds.wa.us if you have specific questions regarding these plan thth corrections. I will be out of the office from October 5 through October 16. If there are any questions or concerns that require immediate attention during that time you can contact Don Fiene at (425)771-0220 or fiene@ci.edmonds.wa.us