Loading...
SW_Review_Comments.pdf City of Edmonds TH 121 5 AVENUE NORTH EDMONDS, WA 98020 (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning • Building • Engineering Stormwater Review Comments Permit : Date: # BLD20070669 12/12/2007 Project Name/Address: Edmonds Elementary School/1215 Olympic Ave, Edmonds th Contact Person/Address/Fax: Michael Spano/CG Engineering 250 4 Avenue S Suite 200, Edmonds, WA 98020/(425)778-5536 Reviewer: Division: Blaine Chesterfield Engineering During review of the subject submittal it was found that the following information, corrections, or clarifications will need to be addressed: 1. The drainage report only included detention calculations but did not include the SBUH calculations for the 2-yr, 10-yr, and 100-yr, 24-hr storm event for current or developed conditions. The Time of Concentration assumptions and calculations also were not in the drainage report. In order to complete this review a complete set of drainage calculations is needed including a list of all assumptions. 2. The amount of drainage flowing into the detention pipe needs to more closely match the facilities design capacity. In other words the detention facility is designed for 10900 sq ft of impervious area and should have the flows from approximately that much area routed into it or the excess flows should bypass the system entirely. Please resubmit three copies of the revised plans/documents to a Development Services Coordinator. You may contact me at 425-771-0220 if you have specific questions regarding these plan corrections.